China Eximbank provides preferential buyer's credit for Phase 1 of the Rural Well Drilling Project (Linked to Record ID#110666)

$85M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Senegal
Country Senegal
Start Date Jan 01, 2017
End Date Sep 09, 2031
Duration 5,364 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 58711
Grant Description

China Eximbank provides preferential buyer's credit for Phase 1 of the Rural Well Drilling Project In 2017, China Eximbank and the Government of Senegal signed a preferential buyer's credit (PBC) agreement worth approximately $85,000,000 (CFA 50 billion) for Phase 1 of the Rural Well Drilling Project .

📋 Loan / Grant Terms
💰 Loan Amountare unknown

However, it is known that the borrower was expected to use the loan proceeds to finance 85% of the cost of commercial (EPC) contract worth approximately $100 million with CGCOC Group Co., Ltd, which was signed on February 12, 2016.

The purpose of the project was to build and rehabilitate 251 wells (including the rehabilitation of 70 existing boreholes and the construction of 181 new boreholes and water towers), 900 standpipes, and 1,800 km of pipelines in 13 regions within the country's most disadvantaged rural areas.

The project consisted of two parts – the construction of newly built well and water supply systems and the renovation of old wells.

The newly built project component involved 181 sets of water supply systems that have a maximal daily capacity of 80,000m3 per day, enough to meet the water needs of roughly 1.66 million people.

The renovation component of the project involved 70 wells that have a capacity of 30,000m3 per day, enough to meet the water needs of 621,000 people.

Upon completion, it was expected that this project would meet the water needs of more than 2.2 million people and 'solve the problem of water... for one-seventh of Senegal's population.' CGCOC Group Co., Ltd was the general EPC contractor responsible for implementation. An official project inauguration ceremony took place on June 4, 2016.

Then, on March 5, 2017, a formal groundbreaking ceremony took place. However, project implementation did not commence until April 17, 2017. The project was completed on October 10, 2019. The originally anticipated duration of the project was 14 months (June 17, 2018).

Ultimately, a total of 251 wells are drilled and 1,200 km of water pipelines were laid, providing the much-needed drinking water to the rural residents in Senegal. 181 sets of water supply systems were installed and 70 wells were rebuilt, which collectively able to meet the water demand of 2.28 million people.

Drinking water facilities were installed in 12 of the 14 major districts nationwide, benefiting rural residents by providing safe drinking water, reducing the occurrence and spread of diseases, and improving their living quality and health.

The project also reportedly created more than 3,000 jobs in 12 major districts of Senegal, including jobs related to well maintenance, security and fee collection, and cultivated a batch of local engineering and technical personnel.

📋 Staff Comments
  1. This project is also known as the Village Water Supply Project, the Rural Well-Digging Project, the Village Water Supply Project, and the Senegal Rural Well Drilling and Water Supply Infrastructure Construction Project. The Chinese project title is 乡村打井供水项目 or 塞内加尔乡村打井项目 or 塞内加尔乡村打井供水项目 or 塞内加尔城乡供水项目 or 塞内加尔乡村打井供水基础设施建设项目. The French project title is Volet hydraulique de la phase 3 du Programme d’urgence de développement communautaire (PUDC) or Projet de forage de puits dans des régions arides et isolées du Sénégal.
  2. The monetary value of the February 12, 2016 commercial contract with CGCOC Group Co., Ltd is identified in https://www.chinca.org/upload/file/20230413/6381700144050388943225072.pdf3. The Government of Senegal identifies the face value of the loan as CFA 50 billion (approximately $85 million) in its Aid Management Platform (AMP). However, given that the project was financed through a preferential buyer's credit from China Eximbank, AidData assumes for the time being that the loan was denominated in USD and that it was equivalent to 85% of the value of the underlying commercial contract. This issue warrants further investigation.
📚 Sources & References
  • The public-private partnership to boost access to drinking water for rural populations in Senegal
  • 人民日报:“感谢中国带来了‘及时雨’
  • Le DG de l'OFOR reçoit les équipements du Pudc phase 3
  • L'ère du renouveau de l'hydraulique rurale
  • 萨勒总统、张迅大使出席塞内加尔乡村打井供水项目启动仪式
  • 塞内加尔:感谢中国带来了“及时雨”
  • 走进非洲项目_中国进出口银行
  • CHINE-SENEGAL : Une histoire d'amitié
  • 内加尔城乡供水项目
  • PUDC/I2AE : Démarrage d’un programme spécial de 250 forages en Octobre 2016
  • 进出口银行融资支持塞内加尔多项基建项目
  • 萨勒总统、张迅大使出席塞内加尔乡村打井供水项目启动仪式
  • 感謝中國帶來了‘及時雨’
  • Programme d’Urgence de Développement Communautaire / Phase 3 Volet Hydraulique
  • 萨勒总统、张迅大使出席塞内加尔乡村打井供水项目启动仪式
  • 走进非洲
  • 进出口银行的塞内加尔足迹
  • 驻塞内加尔大使张迅出席乡村打井项目启动仪式
  • 惠民生遂民愿暖民心——进出口银行融资支持的塞内加尔乡村打井供水项目完工并投入使用
  • Le DG de l'OFOR reçoit les équipements du Pudc phase 3
  • President Saale and Ambassador Zhang Xun attended the launching ceremony of the Senegal village well water supply project
  • WHITE PAPER ON GREEN FINANCE AND SOCIAL RESPONSIBILITY THE EXPORT-IMPORT BANK OF CHINA
  • Chinese Loans to Africa Database
  • PUDC: la Chine va financer 250 forages supplémentaires
  • From the Vivid Stories in President Xi's Signed Article; To Comprehend the Rich Connotation of China-Africa Cooperation
  • FCSA : la coopération sino-africaine contribue à l'amélioration du bien-être des populations africaines (SYNTHESE)
  • Cérémonie d'Inauguration du forage de Barkédji dans le département de Linguére
  • Senegal: China EximBank provides 33 million euros for security
  • 习近平主席在塞内加尔接见中地海外等中资企业代表
  • 萨勒总统、张迅大使出席塞内加尔乡村打井供水项目启动仪式
  • 庆党的百年华诞 讲百篇援外故事
  • 塞内加尔农村群众喝上干净便捷的饮用水
  • Samagox/samapudc/Louga : Forage de Boguel Ndiayène Galayel dans la commune de Gandé en cours de réalisation.
  • Senegal’s rural well-drilling water supply project completed the final acceptance
  • 进出口银行的非洲足迹—塞内加尔篇
  • Into Africa: Export-Import Bank of Senegal Footprint
  • China Loans to Africa
  • 打井供水雪中送炭,民心工程助推乡村振兴 ——塞内加尔乡村打井供水基础设施建设项目
  • 中地海外承建塞内加尔乡村打井项目全面启动
  • 中国援建的塞内加尔乡村打井工程谱写中塞情缘
  • 塞内加尔乡村打井供水项目完成最终验收
  • 累累硕果 “一带一路”浙里故事丨“小而美”境外项目④:塞内加尔乡村打井供水
  • 喜讯 - 这是中地海外在境外的首个![Good news - This is CGC Overseas’ first overseas venture!]
  • Chinese Loans to Africa Database (2022 Update)
  • PROJET D’APPUI AU PROGRAMME D’URGENCE DE DEVELOPPEMENT COMMUNAUTAIRE : RESUME EVALUATION ENVIRONNEMENTALE STRATEGIQUE, 2022 Best Practices of Sustainable Infrastructure. Projects Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Senegal

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant