Loading…

Loading grant details…

Active Development AidData Chinese Aid

China Eximbank provides RMB 400 million government concessional loan for 147MW Adjarala Hydroelectric Power Plant Project (Linked to Record ID#2170, #58674, #68762)

¥400M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Benin
Country Benin
Start Date Jul 12, 2016
End Date Aug 28, 2028
Duration 4,430 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 58671
Grant Description

China Eximbank provides RMB 400 million government concessional loan for 147MW Adjarala Hydroelectric Power Plant Project On December 15, 2015, China Eximbank and the Government of Benin signed a $211.31 million preferential buyer’s credit (PBC) agreement for the Adjarala Hydroelectric Power Plant Project.

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period7 years
💹 Interest Rate2%

Then, on July 12, 2016, China Eximbank and the Government of Benin signed an RMB 400 million government concessional loan (GCL) agreement for the Adjarala Hydroelectric Power Plant Project.

📋 Loan / Grant Terms
📅 Maturity20 years
⏳ Grace Period7 years
💹 Interest Rate2%

China Eximbank also signed an RMB 250 million ($61 million) loan agreement with the Government of Togo on May 23, 2016 for the Adjarala Hydroelectric Power Plant Project. The PBC is captured via Record ID#58674, and the GCL is captured vis Record ID#58671. The loan issued to the Government of Togo is captured in Record ID#68762.

The proceeds from these three loans are to be used by the borrowers to finance a FCFA 265,814,526,897 commercial contract between la Communauté Electrique du Bénin (CEB) and Sinohydro, which was signed on April 25, 2014.

This project involves the construction of a dam in Adjarala, which is located approximately 100 km downstream of the 65MW Nangbéto hydropower plant on the Mono River. The dam will stand 40 meters tall, with a 3.7 long kilometer reservoir.

The project also involves the construction of 252 kilometers of 161 KV high voltage power transmission lines, water diversion systems, plants, access roads and other ancillary facilities.

The ultimate objective of the project is to strengthen regional energy interconnection and alleviate electric power shortages in Benin and Togo. Sinohydro is the contractor responsible for implementation. A groundbreaking ceremony took place on December 26, 2015.

Then, in December 2016, the project was suspended after the Togolese Minister of Economy and Finance announced that there were insufficient financial resources to complete the project. The project resumed in January 2017, and as of September 2017 it was still under construction. It is expected to reach completion by 2020.

📋 Staff Comments
  1. This project is also known as the 3x49MW Adjarala Hydroelectric Power Plant Project. The Chinese project title is 阿贾哈拉水电站项目 or 貝寧--多哥阿賈哈拉水電站項目. The French project title is Aménagement hydroélectrique d’Adjarala or Projet d'aménagement du barrage hydroélectrique d'Adjarala.
  2. In the database of Chinese loan commitments that SAIS-CARI released in July 2020, it identifies a single $229 million “concessional loan” from China Eximbank to the Government of Benin for this project. However, the Government of Benin’s Caisse Autonome d'Amortissement (CAA) records two separate loans from China Eximbank: a $211.31 million preferential buyer’s credit and an RMB 400 million government concessional loan. These two loans were independently ratified by Benin’s Parliament, and in May 2018 email correspondence with AidData’s Executive Director, the Coordinator of the IMF Program in Benin’s Ministry of Economy and Finance confirmed the receipt of two separate China Eximbank loans for the 147MW Adjarala Hydroelectric Power Plant Project. AidData relies on the data published by CAA.
📚 Sources & References
  • Infrastructure Financing Trends in Africa – 2016
  • China to lend Benin $270 million to develop Adjarala hydropower dam, 2014 & 2015 China Information Sheet
  • Togo and Benin pin energy hopes on this controversial dam
  • Domestic politics, foreign affairs, socio-economic development
  • Togo : the energy sector is positioning itself
  • RAPPORT SUR LA GESTION DE LA DETTE PUBLIQUE AU TITRE DE L’ANNEE 2016
  • PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
  • Demande de liste de prêts des institutions gouvernementales chinoises
  • 金融时报:“点亮”中非合作新未来 进出口银行“两融”并举 提升非洲国家“造血”能力
  • Projets de Production
  • Les présidents béninois et togolais posent la première pierre de l'aménagement hydroélectrique d'Adjarala
  • REPERTOIRE DES LOIS VOTEES DES 1 ère, 2ème , 3 ème, 4ème, 5ème, 6ème, 7 ème LEGISLATURES
  • 刘豫锡大使出席阿贾哈拉水电站项目奠基仪式
  • Performance through 35 years of professional experience
  • REPERTOIRE DES LOIS VOTEES EN 2015
  • 贝宁-多哥阿贾哈拉水电站项目奠基仪式隆重举行
  • Staff Report for Article IV Consultation
  • Liste de prêts des institutions gouvernementales chinoises de 2000 à 2017
  • 刁鸣生大使出席阿贾哈拉水电站项目奠基仪式
  • 驻贝宁大使刁鸣生在阿贾哈拉电站项目启动仪式上的讲话
  • Discours de l' Ambassadeur lors de la cérémonie de pose de la première pierre du projet d'Adjarala
  • Chinese Loans to Africa Database
  • BU_PITCH_ENGLISH_2018
  • POSE DE LA 1ère PIERRE DE L'AMENAGEMENT HYDROELECTRIQUE D’ADJARALA, 147 MW Adjarala Hydropower Project
  • Rapport sur la gestion de la dette publique au titre de l'annee 2016 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Benin

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant