| Funder | Export-Import Bank of China (China Eximbank) |
|---|---|
| Recipient Organization | Senegalese Ministry of Infrastructure, Land Transport and the Opening up |
| Country | Senegal |
| Start Date | Jan 01, 2021 |
| End Date | Nov 28, 2030 |
| Duration | 3,618 days |
| Number of Grantees | 1 |
| Roles | Recipient |
| Data Source | AidData Chinese Aid |
| Grant ID | 58273 |
China Eximbank provides $619.9 million preferential buyer’s credit for Mbour-Fatick-Kaolack Highway Construction Project On January 6, 2019, Senegal’s Ministry of Foreign Affairs announced that during a visit to Senegal from Chinese Foreign Minister Wang Yi that the Chinese Government would finance the construction of the Mbour-Fatick-Kaolack Highway.
Then, in 2021, China Eximbank and the Government of Senegal signed a $619,961,775.90 preferential buyer’s credit (PBC) agreement for the Mbour-Fatick-Kaolack Highway Construction Project.
The borrower was expected to use the proceeds of the PBC to finance approximately 85% of the total cost of a $738 million commercial contract with CCCC First Highway Engineering Bureau.
The project involves the construction of an expressway route (A2) from Mbour, Senegal connecting onwards to Fatick and Kaolack, and the expressway will be approximately 100 km with 2x2 lanes both 3.5 meters wide, a left side strip that is 1 meter wide, and an emergency stop strip 3 meters wide. The project will also construct an embankment on the side of the road.
CCCC First Highway Engineering Bureau was selected as the EPC contractor responsible for project implementation in May 2021. Then, in November 2021, project implementation commenced. At that time, the project was expected to reach completion by August 2025.