Loading…

Loading grant details…

Completed Commercial AidData Chinese Aid

ICBC contributes $31.5 million to syndicated loan for 50MW Benban 3 Solar Photovoltaic Power Plant Construction Project (Linked to Record ID#57855)

$31.5M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization Alcom Energy JSC
Country Egypt
Start Date Oct 18, 2017
End Date May 28, 2031
Duration 4,970 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 57965
Grant Description

In 2017, ICBC contribute to USD 63 million syndicated loan agreement for the 50MW Benban 3 Solar Photovoltaic Power Plant Construction Project, Egypt On October 18, 2017, Alcom Energy JSC — a special purpose vehicle and joint venture of ACWA Power, Al Tawakol Electrical Co. incorporated in Egypt (Al Tawakol), and Hassan Allam Holding incorporated in Egypt (Hassan Allam) — and the EBRD and the Industrial and Commercial Bank of China (ICBC) signed a $63 million syndicated loan agreement for the 50MW Benban 3 Solar Photovoltaic Power Plant Construction Project.

Both the ICBC and ERBD contributed $31.5 million as lead arrangers of the loan. The loan carries a maturity of 18-years. Its interest rate and grace period are unknown.

However, is it known that the borrower purchased a credit insurance policy from the Multilateral Investment Guarantee Agency (MIGA).

On December 15, 2017, MIGA signed a contract in which it agreed to issue guarantees of $42,046,560 to ICBC for its investment into Alcom Energy JSC.

The guarantees are issued for up to 20-years against the risks of Transfer and Convertibility Restrictions, Breach of Contract, Expropriation and War and Civil Disturbance.

The scope of the $80.8 million project included the design, development, construction, commissioning and operation of a 50MW solar photovoltaic power plant located in the Benban solar complex (محطة بنبان للطاقة الشمسية) in the Aswan Province of Egypt. The power plant was developed under Egypt’s Feed-in Tariff (FiT) scheme.

ACWA Power was granted a 25-year Power Purchase Agreement (PPA) and it will sell the power generated by the three solar plants to the state-owned Egyptian Electricity Transmission Company (EETC) (the off-taker). The project was allocated to plot 3-1 (approximately 97 hectares (Ha)) in the Benban solar complex.

The project was expected to have alternating current capacity of 50 MWAC and peak direct current capacity of 70MWDCP, and it was expected to be linked to substation 1 (SS1) on the northeastern corner of the Benban complex via an underground 22 kilovolt (kV) transmission line following the internal routes right-of-way (RoW) installed by EETC.

SS1 covers an area of 15 km2.

The Benban solar complex comprises a 37-square kilometer (km2) area allocated to Egypt's New and Renewable Energy Agency (NREA) located in the western desert, 15 km west of the River Nile and approximately 1 km west of Aswan – Luxor highway. The complex is approximately 650 kilometers (km) from Cairo.

With the exception of the narrow and densely populated Nile Valley with its intensive agriculture, the area is all desert land, largely unused and unpopulated. The area is mainly flat, with sand and gravel dunes, and with no notable natural vegetation and no human activities.

The nearest villages are Benban village, about 12 km east and Fares village about 25 km northeast of the Benban solar complex, with 26,200 and 11,000 inhabitants respectively. The nearest cities are Aswan, 40 km south and Luxor 140 km north.

The Benban solar complex was sub-divided into 39 plots each allowing for a solar plant of up to 50 megawatts (MW) with a total capacity for the entire site of up to 1.8 Gigawatts (GW).

A consortium that consisted of Astroenergy and CGGC (China Gezhouba Group Corporation) International was the Engineering, Procurement, and Construction (EPC) contractor responsible for project implementation. First National Operation & Maintenance Co. Ltd (NOMAC) — a fully owned subsidiary of ACWA Power — was the Operations and Maintenance (O&M) contractor.

On January 7, 2018, this project reached financial closure.

The project was originally scheduled to commence in the first quarter of 2018 and reach completion (operations) by the fourth quarter of 2018. It ultimately reached its commercial operations date (COD) in the third quarter of 2019.

📋 Staff Comments
  1. This project is also known as the ACWA Solar Power Plant Project or ACWA Benban Solar Project or Acwa Benban PV III – 50MW Project.
  2. This project was one of the first fully non-recourse project financed transactions in Egypt since the late 1990s – and the only feed-in-tariff (FiT) project financing to attract a pure commercial bank. It was also the first non-recourse project-financed transaction in Egypt across sectors for any Chinese bank, and the first fully non-recourse deal in the power sector in the African continent for ICBC. It was awarded several international prizes, such as the “2017 Global Multilateral Deal” by PFI and the “Project Finance Deal of 2018” by Bond, Loan & Sukuk Middle East.
  3. This project should not be confused with Project ID#57855, which captures a $60 million contribution by ICBC to a syndicated loan the construction of three additional solar photovoltaic power plants in the Benban Solar Park.
📚 Sources & References
  • ACWA Power gets financing to deploy 165.5 MW at Egypt’s Benban solar complex
  • CASE STUDY: ACWA Power Teams Up with ICBC on Egypt’s Benban USD185mn Structured Loan
  • ACWA Benban Solar Projects
  • ACWA Power plans three solar projects in Egypt
  • BENBAN PV IPP
  • Benban PV IPP
  • BENBAN PV IPP
  • ACWA Benban Solar PV II
  • ICBC and EBRD back Acwa’s Egypt solar FIT II
  • MIGA Supports Egyptian Effort to Build World’s Largest Solar Generation Park
  • League Tables
  • Alcom Energy JSC. _ Multilateral Investment Guarantee Agency _ World Bank Group
  • Alcom Energy JSC. _ Multilateral Investment Guarantee Agency _ World Bank Group 2, 2. Egypt FiT 2 - ACWA ESRS - For Disclosure_ ACWA_Alcom_1 Aug 17
  • Special Report on Green Finance - ICBC
  • Acwa Power Benban Solar PV Portfolio (120 MW)
  • ACWA Benban Solar PV III Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Alcom Energy JSC

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant