China Exim Bank pledges a USD 2.6 billion export buyer's credit loan to the Egyptian Electricity Holding Company for the Ataqah Hydroelectric Plant

$2.6M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Egyptian Electric Holding Company
Country Egypt
Start Date Jan 01, 2019
End Date Sep 23, 2033
Duration 5,379 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 57872
Grant Description

China Exim Bank pledges a USD 2.6 billion export buyer's credit loan to the Egyptian Electricity Holding Company for the Ataqah Hydroelectric Plant On February 10, 2019, The Export Import Bank of China came to an agreement with the Egyptian Electricity Holding Co to provide a USD $2,600,000,000 export buyer's credit loan to fund the construction of the Ataqah (عتاقة) hydro power station.

📋 Loan / Grant Terms
💰 Loan Amountincluding interest rate

The loan’s terms were expected to be finalized by June 2019. As of June 22, 2022, there is yet to be any available information regarding the terms of the loan agreement.

Previously in March 2015, the China Water Resources and Hydropower Construction Corporation (Sinohydro) signed a conditional agreement with the Egyptian Ministry of Electricity and Renewable Energy (MERE) to build a 600m high, 2,400MW, pumped storage power station on Ataqah Mountain in Suez Governorate, Egypt.

As part of the contract Sinohydro will engineer, procure, and construct the hydroelectric plant as the sole EPC contractor.

On June 15, 2017, the Egyptian government contracted with Artelia, a French consulting firm, to assess Sinohydro's technical and financial proposal for the project.

On September 3, 2018, during an economic forum between Egypt and China, a conditional agreement for the project was signed, pending financing and a formal contract to be signed later.

The Egyptian Hydro Power Projects Executive Authority (HPPEA), The Egyptian Ministry implementing the project, received environmental and safety approvals as of September 19th 2019.

However, in January 2020 the HPPEA was abolished by the Egyptian government and its mission and assets were transferred to the Renewable Energy Development Agency under MERE.

On September 12, 2021, Youm7 stated that the final contracts needed to begin preparing the site for construction should be signed during the 2021-22 fiscal year.

According to Akhbar el-Yom, the project's planning was still progressing as of December 24, 2021, yet an implementation timeline remains unclear. The project involves constructing a reversible hydroelectric power plant. This involves pumping water through turbines in order to store electricity.

Reservoirs holding 8 million cubic meters of water at the top and bottom of the mountain will provide the water source by which the plant will operate. According to some sources the plant will use wastewater. The total surface area demarcated for the hydroelectric plant is 168,000 m^2.

However, In June of 2019, MERE entered negotiations with Egypt’s National Centre for Planning State Land Usage to expand the land allocated to the project. The total cost of the hydroelectric dam complex is estimated at USD $2,600,000,000.

Construction time is projected to take 6-years and the project is projected to reach completion in 2024, according to media sources.

Upon completion of the project, the hydroelectric power plant at Ataqah will be the fourth highest pumped storage power station in the world.

According to multiple sources, the project is part of MERE’s effort to diversify Egyptian electrical generation and move to more sustainable energy sources. MERE’s plan includes producing 20% of all Egyptian electricity through renewable means by 2022.

📋 Staff Comments
  1. The project name in Arabic is 'مشروع الضخ والتخزين جببل عتاقة'.
  2. Ataqah is transliterated in English in the following ways; Ataka, Attaqa.
  3. The United States Export-Import Bank has identified this project to be an export buyer's credit in its annual report on China Exim Bank's activity. AidData has coded it accordingly, setting the project's intent to 'Mixed' in recognition of the commercial and development aspects of the project.
📚 Sources & References
  • 专访:中埃两国在电力领域合作势头良好——访埃及电力与可再生能源部新闻发言人阿依曼·哈姆扎
  • EGYPT: Close negotiations with Sinohydro to build the Ataqa power plant
  • Egypt inks $2.6bln loan facility with China’s Exim Bank
  • Egypt scraps Hydro Power Plant Executive Authority
  • EEHC agrees with EximBank to finance PSH project with $2.6bn, مصر تبدأ في تشييد أول محطة لتوليد الطاقة الكهربائية من مياه الصرف المعالجة في الشرق الأوسط
  • Jabal Ataka Station
  • China's Sinohydro seeks establishing pumped-storage power plant in Egypt
  • Attaqa Mountain Pumped Storage Power Plant, بتكلفة 2.7 مليار دولار.. رئيس 'المحطات المائية' يكشف تفاصيل مشروع 'محطة عتاقة'
  • EEHC agrees with EximBank to finance PSH project with $2.6bn
  • Egypt inks $2.6bn loan facility with China’s Exim Bank
  • EEHC reviews Attaqa pumped-storage plant contract, الكهرباء: لا صحة لإلغاء مشروع الضخ والتخزين بجبل عتاقة بالسويس, خاص, 2019 Data on Chinese Official MLT Export and Trade-related Financing
  • MOEE Annual Report 2016-2017
  • MOEE Annual Report 2017-2018
  • Launching New Projects
  • The Chinese “Exim Bank” finances the pumping and storage station in Ataka with 2.6 billion dollars Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Egyptian Electric Holding Company

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant