ICBC provides $35.25 million loan for Musonda Falls Hydroelectric Power Plant Upgrading Project (Linked to Record ID#57565, #66848)

$35.25M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization Zambia Electricity Supply Corp. (ZESCO)
Country Zambia
Start Date Jan 26, 2017
End Date Feb 20, 2029
Duration 4,408 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 57560
Grant Description

ICBC provides $35.25 million loan for Musonda Falls Hydroelectric Power Plant Upgrading Project On January 26, 2017, the Industrial and Commercial Bank of China (ICBC) signed a $35.25 million loan facility agreement with ZESCO Limited — Zambia’s state-owned power company — for the Musonda Falls Hydroelectric Power Plant Upgrading Project.

📋 Loan / Grant Terms
💰 Loan Amountcarries the following terms: 15-year maturity
📅 Maturity15 years
⏳ Grace Period3 years
💹 Interest Rate4.69%

As of December 31, 2017, the loan's amount outstanding was $29.9 million. The Musonda Falls Hydroelectric Power Plant is located in Musonda Falls within Mwense District and Luapula Province.

It is a source of power supply to seven districts in the province—namely, Chiengi, Kawambwa, Mwense, Chipili, Chembe, Nchelenge and Samfya. The purpose of this project was to upgrade the Musonda Falls Hydroelectric Power Plant from 5MW to 10MW.

This increase in local power capacity also added to the national grid capacity, thereby supporting the fishing industry, farming activities and potential mining activities in nearby communities. In 2015, Sinohydro won the 18-month contract for project implementation.

Sinohydro had previously provided two bridging loans in 2015 (as captured via Record ID#57565) and 2016 (as captured via Record ID#66848) for the same project. As of 2017, this project had achieved a 99% completion rate.

Turbine-Generator Units 6 and 7 had completed their commissioning tests and reliability runs, but commissioning tests and reliability runs for Turbine-Generator Units 1 to 5 were still ongoing by the end of 2017. The scheduled project handover date of November 18, 2017 was not achieved.

However, a 2018 Energy Sector Report published by Zambia’s Energy Regulation Board (ERG) indicates that ‘[t]he increase in [power] generation in 2018 is attributed to the [upgrading] of Musonda Falls Power Station’, which suggests that this hydroelectric power plant project was completed and put into operation in 2018.

📋 Staff Comments
  1. The Chinese project title is 穆松达水电站7台机组 共10MW.
  2. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  3. In the SAIS-CARI China Loans to Africa database released in July 2020, this loan has an 18-year maturity length. However, AidData records the maturity length as 15-years because the audited 2017 financial statements of ZESCO Limited (the borrower) note that “[t]he loan shall be repaid over a 15-year period including a grace period of 3-years” (see source ID 67341 p. 40).
  4. The Daily Mail (source ID 89004) provided the following exact transaction amount US$34,719,389. However, AidData relies on the audited 2017 financial statements of ZESCO since it is a more official source.
📚 Sources & References
  • Zesco to up Luapula power supply
  • Energy Sector Report 2018
  • Generation Projects
  • 中国电建赞比亚 可持续发展报告
  • 中水科技承担的赞比亚慕松达水电站监控系统顺利通过工厂验收
  • ZESCO LIMITED REPORT AND FINANCIAL STATEMENTS
  • ZESCO Integrated Report 2017
  • Project Financing Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Zambia Electricity Supply Corp. (ZESCO)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant