Completed Mixed AidData Chinese Aid

ICBC provides $29.6 million loan for Mpika Power Supply Improvement Project (Linked to Record ID#57492)

$29.6M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization TBEA Co., Ltd.|Zambia Electricity Supply Corp. (ZESCO)
Country Zambia
Start Date Jul 13, 2016
End Date Mar 24, 2026
Duration 3,541 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 57556
Grant Description

ICBC provides $29.6 million loan for Mpika Power Supply Improvement Project On July 13, 2016, Industrial and Commercial Bank of China (ICBC) and Zambia Electricity Supply Corporation (ZESCO) Limited — Zambia’s state-owned power company — signed a $29.6 million (seller's credit) facility agreement for the Mpika Power Supply Improvement Project.

According to this agreement, ICBC was to disburse funds directly to TBEA Company Ltd., which would in turn use the loan proceeds to finance the implementation of the project.

📋 Loan / Grant Terms
💰 Loan Amountcarries the following borrowing terms: a 15-year maturity
📅 Maturity15 years
⏳ Grace Period3 years

As of December 31, 2017, the loan's amount outstanding was $5.8 million. As of December 31, 2019, the loan's amount outstanding was $27.71 million.

The project sought to improve the supply of power in Mpika district within Muchinga Province by improving its (330-66 KV) electricity substation. TBEA Company Ltd. was the EPC contractor responsible for project implementation.

Construction began in 2017 and the project had achieved an 85% completion rate (and 40% loan disbursement rate) by December 2018. The project was ultimately completed on March 15, 2019.

📋 Staff Comments
  1. This project is also known as the Improvement of Power in Mpika District Project and the Mpika Power Supply, 330-66 KV Substation Project. The Chinese project title is 赞比亚Mpika地区电力改善项目.
  2. The SAIS-CARI Chinese Loans to Africa database released in July 2020 identifies this loan as having an 18-year maturity length. However, AidData relies on ZESCO sources (source ID#67341 and #88869), which identify a 15-year maturity.
  3. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  4. Even though Zambian official sources (ID#67341, #88869) portrayed this is as just an ordinary ICBC loan, TBEA (source ID#117086) confirmed that ICBC provided a seller's credit.
  5. The monetary value of the EPC contract with TBEA was $38 million.
  6. Official sources differ on the precise face value and commitment date of the loan. The Government of Zambia's Loans and Guarantees (Authorisation) (Exemption) Notice of 2017 identifies a $19.6 million ICBC loan that was issued on July 13, 2017 for the Mpika Power Supply Improvement Project (https://www.zambialaws.com/Zambia2017Pdfsi/SI%2049%20of%202017.pdf). ZESCO's 2019 Integrated Report identifies a $29.6 million ICBC loan that was issued on July 13, 2016 for the Mpika Power Supply Improvement Project (https://www.dropbox.com/s/9log3odahb3y8fa/ZESCOIntegratedReport2019-20210818131559.pdf?dl=0). This discrepancy warrants further investigation.
  7. This project is part of phase II of a larger project called the Zambia-Tanzania-Kenya (ZTK) Transmission Interconnector Project, which will seeks to connect the power grids of all three countries (as captured via Project ID#57492).
📚 Sources & References
  • 2017 Integrated Report
  • ZTK Transmission Interconnector (Zambia section)
  • Power Transmission Interconnector Kabwe (Zambia) to Iringa (Tanzania) Project Information Memorandum
  • Zambia-Tanzania Interconnector (P166099) Project Information Document/Integrated Safeguards Data Sheet (PID/ISDS)
  • Small entrepreneurs demand reliable power supply
  • PRESS STATEMENT: SHUTDOWN OF THE 330kV PENSULO-KASAMA TRANSMISSION LINE TO FACILITATE COMMISSIONING WORKS AT THE NEW MPIKA 330/132-66KV SUBSTATION
  • 赞比亚Mpika地区电力改善项目通信电源招标公告
  • 赞比亚MPIKA地区电力改善项目——330KV变电站工程 圆满收工
  • 赞比亚MPIKA地区电力改善项目——330KV变电站工程 圆满收工
  • ZESCO LIMITED REPORT AND FINANCIAL STATEMENTS
  • Zambia’s Chinese Debt in the Pandemic Era - Briefing Paper, 2019 Integrated Report
  • CHALLENGES AND POSSI BLE SOLUTIONS IN ZAMBIA ’S ELECTRICITY SUPPLY INDUSTRY
  • Statutory Instrument No 49 of 2017 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

TBEA Co., Ltd.|Zambia Electricity Supply Corp. (ZESCO)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant