China Eximbank provides $139.3 million preferential buyer’s credit for 86MW Lusiwasi Lower Hydropower Expansion Project (Linked to Record ID#30467)

$139.35M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Zambia
Country Zambia
Start Date Sep 07, 2014
End Date Jan 31, 2032
Duration 6,355 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 57392
Grant Description

China Eximbank provides $139.3 million preferential buyer’s credit for 86MW Lusiwasi Lower Hydropower Expansion Project On July 31, 2009, China National Electrical Engineering Company (CNEEC) and the Government of Zambia signed a Letter of Intent, which outlined the possibility that CNEEC would work with ZESCO Limited to develop the 86MW Lusiwasi Lower Hydropower Expansion Project (captured via Record ID#57392) and the 15MW Lunzua Hydropower Rehabilitation Project (captured via Record ID#30467).

In exchange for hiring CNEEC, the Government of Zambia requested that China Eximbank extend a preferential buyer’s credit (PBC) for both projects and that CNEEC arrange the financing.

In 2013, China Eximbank and the Government of Zambia signed a $183.23 million PBC agreement for the 86MW Lusiwasi Lower Hydropower Expansion Project and the 15MW Lunzua Hydropower Rehabilitation Project. The borrowing terms of the PBC are unknown.

According to a 2014 report from Zambia’s Office of the Auditor General (source ID#67159), the proceeds of the PBC were to be used by the borrower to finance (a) 85% ($139,353,132) of the cost of a commercial contract ($163,944,861.43) between ZESCO Limited and CNEEC for the 86MW Lusiwasi Lower Hydropower Expansion Project, which was signed on July 21, 2011; and (b) 85% ($44.2 million) of the cost of a commercial contract ($52 million) between ZESCO Limited and CNEEC for the 14.8MW Lunzua Hydropower Rehabilitation Project, which was signed on July 21, 2011.

The remaining 15% was to be provided by the Government of Zambia in counterpart financing.

The 86MW Lusiwasi Lower Hydropower Expansion Project involves the upgrading of the Lusiwasi Hydroelectric Power Plant, which is located in Serenje District and Central Province (exact locational coordinates: -13.34642,31.01898), from from 12MW to 86MW. The project was originally scheduled to reach completion on September 7, 2014.

However, it has faced major implementation delays and become a source of local controversy.

One source of concern that emerged was overpricing and the fact that the CNEEC was selected as the contractor through a sole-source contract rather than through a competitive bidding process.

Additionally, a Government of Zambia inquiry into CNEEC’s background revealed that the company did not perform to the required standards of good workmanship and quality delivery on previous contracts. ZESCO Limited eventually notified CNEEC of its intentions to terminate their commercial contract.

Then, in October 2011, Government of Zambia made the decision to terminate the commercial contract with CNEEC.

However, CNEEC was not willing to refund an advance payment of $32,334,632.75 that ZESCO Limited provided between December 21, 2010 and August 23, 2011.

Upon consultation between the Government of Zambia and ZESCO Limited, it was decided that the commercial contract would be reinstated in order to avoid the additional costs that would arise from termination. More specifically, a "no-objection" was granted as per China Eximbank's request.

Upon reinstating CNEEC in June 2012, ZESCO Limited agreed with CNEEC that the implementation would start with the 14.8MW Lunzua Hydropower Rehabilitation Project, and upon completion of that project, the contractor would proceed to implement the 86MW Lusiwasi Lower Hydropower Expansion Project.

As of 2017, the 86MW Lusiwasi Lower Hydropower Expansion Project had only achieved a 48% completion rate (against a target rate of 90%).

There is also some reporting that suggests that PowerChina (Sinohydro) may have replaced CNEEC as the contractor responsible for the 86MW Lusiwasi Lower Hydropower Expansion Project.

📋 Staff Comments

1. This project is also known as the Lusiwasi/Lunzua Hydropower Stations Project. The Chinese project title is 赞比亚LUSIWASI和LUNZUA水电站合 or Lusiwasi水电站项目.

📚 Sources & References
  • REPORT of the AUDITOR GENERAL for 2014, 2016 Annual Progress Report
  • Energy Sector Reports
  • Ministerial Statement on the Electricity situation
  • ZAMBIA SEFORALL ACTION AGENDA 2019
  • Chinese Ambassador to Zambia Visits CNEEC
  • Minister of Finance of Zambia visited CNEEC
  • CNEEC Aids Zambia in Developing Hydropower Projects
  • 中国驻赞比亚大使来访中国电工
  • 赞比亚LUSIWASI和LUNZUA水电站合同成功签约
  • Completion of 14.8-MW Lunzua
  • Zambia, small hydro rehabilitation part of US$650 million project
  • PRESIDENTIAL SPEECH FOR THE CEREMONIAL OPENING OF THE THIRD SESSION OF THE TWELFTH NATIONAL ASSEMBLY, 2016 Annual Progress Report Detailed Sector and Provincial Reports, 2014 ANNUAL PROGRESS REPORT, 2013 Annual Economic Report
  • Zambia’s Chinese Debt in the Pandemic Era
  • Tianjin Electric Institute: Zambia LUSIWASI Hydropower Station customers visit the company
  • A history of debt, poor management at Zesco
  • REMARKS AT THE GROUNDBREAKING CEREMONY OF 330KV PENSULO-KASAMA AND PENSULO-MSORO-CHIPATA TRANSMISSION LINE PROJECTS BY H.E. ZHOU YUXIAO
  • CHINESE AMBASSDOR TO ZAMBIA Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Zambia

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant