Loading…

Loading grant details…

Active Development AidData Chinese Aid

[Cancelled] China Eximbank provides oil-backed loan for 420 km Abéché-Biltine-Iriba-Am-Djarass Construction Project (Linked to Umbrella Record ID#56198)


Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Chad
Country Chad
Start Date Jun 07, 2012
End Date May 30, 2031
Duration 6,931 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 56258
Grant Description

[Cancelled] China Eximbank provides oil-backed loan for 420 km Abéché-Biltine-Iriba-Am-Djarass Construction Project In 2012, China Eximbank reportedly issued an oil-backed loan for the 420 km Abéché-Biltine-Iriba-Am-Djarass Construction Project.

This project involved the construction of a 420 km of road between Abéché, Biltine, Iriba, and Am-Djarass, near the border with Sudan.

The project had a total cost of 187 billion CFA (285 million euros), but the face value of the China Eximbank loan is unknown..

This project had three components: the Abéché-Biltine Road (90 km), which was to be implemented by the China Railway Seventh Bureau Group Co., Ltd. and completed by the end of 2014; the Biltine-Iriba Road (195 km), which was to be implemented by China Overseas Construction Group Co., Ltd. (starting in 2013 and lasting 36 months); and Iriba-Am-Djarass Road (137 km), which was to be implemented by China Shandong International Economic and Technical Cooperation Group Co., Ltd and completed within three years.

On December 20, 2012, a groundbreaking ceremony was held for this project. However, this project was not completed with financing from China Eximbank.

Although it was initially approved for financing through a subsidiary loan under the Master Loan Facility Agreement (MLFA) that the Government of Chad signed with China Eximbank in 2011 (captured in #56198), the MLFA was subsequently cancelled in December 2013. Therefore, AidData has status-coded this project as cancelled.

📚 Sources & References
  • 我与乍得“石油换贷款”合作项下多条公路项目陆续举行奠基仪式
  • La coopération avec la Chine est un modèle de transparence, selon les responsables tchadiens
  • Tchad : les voies du développement
  • 山东高速与非洲法语区国家经贸合作
  • Infrastructures : Le Tchad rattrape son retard en matière des routes bitumées Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Chad

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant