ICBC participates in $115 million syndicated loan for 150MW Barker Power Plant Construction Project

$23M USD

Funder Industrial and Commercial Bank of China (Argentina) Limited (ICBC (Argentina))
Recipient Organization UGEN S.A.
Country Argentina
Start Date Apr 26, 2017
End Date Mar 09, 2030
Duration 4,700 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 54589
Grant Description

ICBC participates in $115 million syndicated loan for 150MW Barker Power Plant Construction Project On April 26, 2017, UGEN S.A. — a special purpose vehicle and subsidiary of MSU Energy Group — signed a $115 million syndicated loan agreement with Banco de Galicia y Buenos Aires S.A., Banco Hipotecario S.A., BACS Banco de Crédito y Securitización, Banco Macro S.A., and Industrial and Commercial Bank of China (Argentina) S.A. for the 150MW Barker Power Plant Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountcarried a 5 year maturity (final maturity: June 2022) and an unknown interest rate
📅 Maturity5 years

As of September 30, 2017, the loan’s amount outstanding was $105.7 million was outstanding under this loan, and, as of March 13, 2018, its amount outstanding was $109 million.

The purpose of the project was the construction and operation of the gas-fired Barker power plant in the partido of Benito Juarez and the Province of Buenos Aires.

The purpose of the power plant itself is to provide electricity to Argentina's national electricity grid, the Argentine Interconnection System (SADI).

As such, UGEN S.A. entered into a 10-year Power Purchase Agreement (PPA) for the Barker power plant with Compañía Administradora del Mercado Mayorista Eléctrico S.A. (CAMMESA) – the government entity in Argentina that manages the wholesale energy market and the dispatch of electricity to the SADI – on July 25, 2016.

The plant has three General Electric turbo generators (model LM6000-PC Sprint), each with 50 MW of generation capacity. Electricity from the Barker power plant is dispatched to the SADI through the Barker-Olavarría high voltage line. General Electric (Argentina Branch) was the EPC contractor responsible for project implementation.

The Barker power plant began operating on December 29, 2017.

📋 Staff Comments

1. ICBC’s contribution to the $115 million syndicated loan is unknown. For the time being, AidData assumes equal contributions ($23 million) across the 5 participants in the loan syndicate2. Per MSU Energy's Offering Memorandum, UGEN's PPA with CAMMESA was amended on October 26, 2017. Additionally, the Committed Date established in the Barker PPA was November 15, 2017. However, pursuant to an amendment to the PPA to change the site of the power plant, the Committed Date was extended to December 30, 2017.

📚 Sources & References
  • SYNDICATED LOANS & OTHER BANK FINANCINGS
  • MSU emitirá un bono por USD 650m a 7 años para refinanciar su deuda
  • MSU Energy obtuvo un crédito por US$ 230 M para construir dos termoeléctricas
  • Lending & Secured Finance 2018
  • Barker power station
  • Offering Memorandum Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

UGEN S.A.

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant