China Development Bank provides a $166.67 million USD loan for the Tiroda Thermal Power Project (Linked to Record ID#54345)

$166.67M USD

Funder China Development Bank (CDB)
Recipient Organization Adani Power Maharashtra Ltd (APML)
Country India
Start Date Apr 22, 2013
End Date May 16, 2027
Duration 5,137 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 53783
Grant Description

In 2013, CDB and ICBC contribute to USD 480 million syndicated loan agreement for the Tiroda Thermal Power Project, India On April 22, 2013, Adani Power Maharashtra Ltd (APML) — a special purpose vehicle and subsidiary of Adani Power — signed a $480 million syndicated loan agreement with China Development Bank, the Industrial and Commercial Bank of China (ICBC), and the Standard Chartered Bank for the 3300 MW Tiroda Thermal Power Project.

Each bank reportedly contributed $166,670,000 USD to the loan syndicate. Record ID#53783 captures China Development Bank’s contribution, while Record ID#54345 captures ICBC’s contribution. The loan carried a 10-year maturity. Its grace period and interest rate is unknown. The 3300 MW Tiroda Thermal Power Project involved the construction of five 660 MW units.

APML was responsible for the financing, design, and implementation of the project. It has a long-term power purchase agreement (PPA) with Maharashtra state utility. Powergen Infrastructure was the turnkey contractor for the project. Sichuan Machinery & Equipment Import & Export Company (SCMEC) supplied equipment for the project.

SCMEC, however, could not perform the contract works due to Visa policy issues with India. SCMEC, instead, guided the sub-contractors in the erection, commissioning, and operation of the equipment. This project was completed on October 11, 2014.

📋 Staff Comments

1. This project is also known as the 5x660 MW Gondia Coal-Fired Power Plant Project.

📚 Sources & References
  • Three units of Adani power plant in Maharashtra operational
  • Adani Power set to commission third unit in Tiroda this month
  • Adani Power commissions third unit of 660 Mw at Tiroda
  • Gondia Coal-Fired Project Additional Facility (3300MW)
  • BU_PITCH_ENGLISH_2018.xlsx
  • Tiroda Super Critical Thermal Power Plant
  • Maharashtra
  • Tiroda Thermal Power Station
  • Adani Tirora (Tiroda) Thermal Power Plant India
  • Tiroda Thermal Power Plant _ Adani Power Limited
  • Supplementary Online Material: List of projects to which China has provided public financing (2007-2013)
  • Tiroda
  • Maharashtra
  • Largest coal-fired power plant in central India: Black & Veatch Tiroda Thermal Power Project
  • Tiroda Thermal Power Project
  • Residents protesting Adani's Tiroda power plant fear eviction, violence Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Adani Power Maharashtra Ltd (APML)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant