China Development Bank provides $2 billion loan for Atyrau Petrochemical Complex Construction Project (Linked to Record ID#40266)

$2M USD

Funder China Development Bank (CDB)
Recipient Organization Kazakhstan Petrochemical Industries LLP (KPI)
Country Kazakhstan
Start Date Sep 03, 2016
End Date Feb 27, 2032
Duration 5,655 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 53553
Grant Description

China Development Bank provides $2 billion loan for Atyrau Petrochemical Complex Construction Project In 2008, a special purpose vehicle called Kazakhstan Petrochemical Industries Inc. Limited Liability Partnership (KPI Inc.) was legally incorporated.

It is a joint venture of KazMunayGas (49.5% equity stake), SIBUR Holding (40% equity stake), Samruk-Kazyna Ondeu (9.5% equity stake) and "Firm Almex Plus” LLP (1% equity stake).

Then, in 2009, Kazakhstan Petrochemical Industries (KPI) LLP signed an Engineering, Procurement, and Construction (EPC) contract with Sinopec Engineering Co., Ltd. (through Sinopec Group subsidiary China Petroleum & Chemical Corporation) for the first stage of construction of Atyrau petrochemical project.

On February 22, 2011, the Development Bank of Kazakhstan JSC (DBK) entered into a $1.4 billion credit agreement with the Export-Import Bank of China to finance the construction of an integrated petrochemical project in the Atyrau Region of Kazakstan. However, as of 2017, no amounts had been drawn down under this credit agreement.

This was due to the mutual termination of the EPC contract between KPI and Sinopec in 2014.

Therefore, AidData assumes that the China Eximbank loan was canceled (since the proceeds of this loan were to be used to fund the EPC contract with Sinopec). The loan cancellation is captured via Record ID#40266.

Then, in December 2015, China National Chemical Engineering Corporation (CNCEC) signed an EPC contract with KPI to construct an integrated gas-chemical complex in the Atyrau Region on a turnkey basis.

On September 3, 2016, the Xinjiang Branch of China Development Bank (CDB) signed a $2 billion loan agreement with KPI for the construction of the complex.

📋 Loan / Grant Terms
💰 Loan Amountcarried the following borrowing terms: a 20
⏳ Grace Period6 years

The borrower is responsible for making semi-annual principal and interest payments beginning in 2022. National Welfare Fund Samruk-Kazyna JSC provided a guarantee for this loan on February 13, 2017. The loan was also secured by (i.e. collateralized with) all current and future assets of KPI. On November 24, 2017, CDB sent an advance payment of $409 million to CNCEC.

The CDB bank loan was originally expected to cover the entire cost of the $1.795 billion EPC contract with CNCEC; the remainder of the financing for the $2.6 billion project was originally expected to be provided by KPI's shareholders. However, in 2022, CDB issued a supplementary loan to KPI worth $287,620,379 (KZT 133,460,935,000).

📋 Loan / Grant Terms
💰 Loan Amountare unknown

Then, in June 2023, the Eurasian Development Bank provide anther $150 million credit facility to KPI in order to 'finance current operations of the company.' The purpose of the project was to construct the 'first stage' of the Atyrau Petrochemical Complex.

The project site is located in a special economic zone (SEZ) called the National Industrial Petrochemical Technopark, which is 33 km to the northeast of the city of Atyrau, and 8-9 km north to north of Karabatan. 42 construction and installation companies were involved in the construction and installation work; 39 of which were Kazakhstani and 3 of which were foreign.

The Kazakhstani companies included AtyrauNefteMash LLP, which produced the propane and propylene splitter, "Petropavlovsk Plant of Heavy Machine Building" JSC and Sewon-Vertex Heavy Industries received orders for the production of 35 units and heat exchangers with a total weight.

Imstalcon JSC participated in the manufacture of equipment for the project, while the Kazakh Institute of Oil and Gas JSC participated in the design of the complex. Chicago Bridge & Iron Company (CB&I) received the PMC contract for project management. The project was transferred from Samruk-Kazyna to the trust management of JSC NC KazMunayGas (KMG) in June 2018.

Upon completion, the petrochemical complex was expected to produce 500,000 tons of polypropylene per year and be the first integrated gas-chemical complex in Kazakhstan. The plant was originally expected to go online in 2020. On November 27, 2017, KPI sent a notice of the start of construction work to the general contractor.

The message was received and work began on December 11, 2017. As of October 2020, the project had achieved a 77% completion rate and it was expected to be fully complete in 2021. By June 2021, the project had achieved a completion rate of nearly 90%. Then, in November 2022, polypropylene production was officially launched.

As of December 2023, all construction and installation had been completed; the off-site facilities, propane loading rack and propane storage park had been put into operation; and commissioning works were underway. However, work was still underway to bring the entire petrochemical complex to a stable operating mode.

On October 22, 2023, a full power outage occurred with no power supplied from KUS’ steam and gas turbine power plant resulting in a technological failure at the petrochemical complex and emergency shutdown of the propane dehydrogenation and polypropylene production operations. The incident impacted the timing of warranty testing and commissioning of the complex facilities.

📋 Staff Comments
  1. This project is sometimes referred to as 'Construction of the first integrated gas chemical complex in Atyrau oblast,' 'Construction of an integrated gas chemical complex in the Atyrau region - the first phase (polypropylene), or 'Integrated Gas Chemical Complex (Phase I – polypropylene production). The Russian project title is газохимический комплекс по производству полипропилена. The Chinese project title is 阿特劳天然气化工项目.
  2. With respect to AidData's coding of the collateral and guarantee variables, the relevant passage from 'ГОДОВОЙ ОТЧЕТ 2018 год' is on pg.141: 'Заём был выдан под залог движимого и недвижимого имущества Компании «ТОО KPI», включая поступающие в будущем. В 2017 году АО ФНБ «СамрукКазына» предоставил гарантию в пользу ГБРК до полного исполнения Группой своих обязательств перед банком.'3. At one point, KPI was 99% owned by United Chemical Company LLP, a subsidiary of JSC Sovereign Wealth Fund Samruk-Kazyna, and the remaining 1% of KPI LLP was owned by a private investor, 'Firm Almex Plus” LLP, part of part of one of the largest holding groups in Kazakhstan - “ALMEX Holding Group” Joint-Stock Company.
  3. KazMunayGas is the state-owned oil and gas company of Kazakhstan.
  4. Samruk-Kazyna Ondeu is wholly-owned by the Sovereign Wealth Fund Samruk-Kazyna. Samruk-Kazyna Ondeu was established to carry out the commission of the President of the Republic of Kazakhstan to implement projects in the chemical industry.
  5. The 'second stage' of the Atyrau Petrochemical Complex is being financed through a separate project company (special purpose vehicle) called Silleno LLP, which is a joint venture of KMG (49.9% stake equity stake) SIBUR Holding (40% equity stake), and KMG PetroChem (10.1% equity stake). In December 2023, Silleno LLP hired Bank of China to arrange financing for the $7.7 billion Silleno Atyrau Petrochemical Complex Construction Project
📚 Sources & References
  • Kazakhstan: Balance of Payments and External Debt
  • Kazakhstan
  • China inked $2bln deals
  • Atyrau Petrochemical Complex
  • Energy Issue Kazakhstan December 2017
  • White & Case Advises Kazakhstan Petrochemical Industries on the Development of $2 Billion Petrochemical Complex in Kazakhstan
  • LARGEST PROJECTS OF OIL REFINING AND PETROCHEMICALS IN THE COUNTRIES OF CASPIAN AND CENTRAL ASIA
  • 中国国家开发银行与哈萨克斯坦石油化学工业公司签署阿特劳天然气化工项目第一阶段建设融资协议
  • Company History
  • News, Қазақстандық компаниялар мұнай-химия зауытын салуға қатысады ма
  • Presentations
  • Technopark phase
  • Kazakhstan
  • China inked $2bln deals
  • Hallam Chow
  • 中国化学2019年度社会责任报告
  • 中国天辰工程有限公司承接的哈萨克斯坦IPCI项目超额完成年度工作目标, Консолидированная ФО МСФО FINAL DECEMBER 2018
  • History of the company, История Компании, Фаза технопарка
  • Polypropylene plant will be built by the Chinese, but not by Sinopec Engineering
  • 哈萨克斯坦石油加工领域发展和炼厂改造情况
  • Sinopec to build gas chemicals plant in Kazakhstan
  • Integrated Gas Chemical Complex Construction Update
  • Large petrochemical complex to be launched in western Kazakhstan in 2021
  • CB&I Gets Go-ahead for Kazakhstan Petchem Project
  • KPI About company, Необходимо полное переосмысление роли Самрук-Казына в экономике Казахстана, ГОДОВОЙ ОТЧЕТ 2018 год
  • Kazakhstan intends to continue construction of PP production in Atyrau in 2017
  • Kazakhstan nearing completion of Atyrau integrated gas-to-chemicals project
  • KPI Implementation Timeline August 2024
  • JSC NC KAZMUNAYGAS ANNUAL REPORT 2023
  • The first integrated gas chemical complex in Kazakhstan: economic and social contribution to the development of the country
  • Financial statements, ГОДОВОЙ ОТЧЕТ 2018 год
  • Eurasian Development Bank to open $150 mln credit line for Kazakhstan Petrochemical Industries
  • Development Bank of Kazakhstan Base Prospectus 2017
  • Consolidated Financial Statements, for the year ended 31 December 2017
  • Consolidated Financial Statements, for the year ended 31 December 2018
  • Consolidated Financial Statements, for the year ended 31 December 2019
  • Consolidated Financial Statements, for the year ended 31 December 2020
  • Consolidated Financial Statements, for the year ended 31 December 2021 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Kazakhstan Petrochemical Industries LLP (KPI)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant