China Eximbank agrees in principle to provide government concessional loans to support ML-1 Railway Upgrading and Doubling Project


Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Pakistan
Country Pakistan
Start Date May 17, 2017
End Date Feb 02, 2031
Duration 5,009 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 52721
Grant Description

China Eximbank agrees in principle to provide government concessional loans to support ML-1 Railway Upgrading and Doubling Project The Karachi-Peshawar Railway Line — also known as Rail Line 1 (RL-1) or Main Line-1 (ML-1) — is one of four main railway lines in Pakistan. The line begins in Karachi and ends in Peshawar connecting the north and the south of the country.

Currently the line consists of 184 stations with a total length of 1,687 km with a total travel time of 22 hours.

It runs from Karachi to Peshawar via Hyderabad, Nawabshah, Rohri, Rahimyar Khan, Bahawalpur, Khanewal, Sahiwal, Lahore, Gujranwala, and Rawalpindi. Parts of the ML-1 were established during the 19th century.

Under the framework of the China-Pakistan Economic Corridor (CPEC), the line is expected to be upgraded in order to increase the average rail speed from current 105 km/h to 160 km/h.

It is also expected that a computer based signaling and control system will be introduced and the entire track will be doubled.

Another component of the project will involve the establishment of a Dry Port near Havelian and upgradingWalton Training Academy.

On May 15, 2017, a framework agreement was signed by the Chinese Government and the Government of Pakistan on the financing of the first phase of upgrades to the ML-1.

A Memorandum of Understanding (MoU) regarding the project was signed between Pakistan’s Ministry of Planning, Development and Reforms (MPDR) and China’s National Development and Reform Commission (NDRC). On the same day, a commercial contract for the project’s preliminary design was issued.

A feasibility study was also conducted and the ML-1 project was approved by the Central Development Working Party (CDWP).

On August 5, 2020, the Government of Pakistan’s Executive Committee of the National Economic Council (ECNEC) approved the project and announced that it would finance the upgrading and doubling of the ML-1 with three separate China Eximbank government concessional loans for thee different project components (or lots/packages) in order to avoid loan commitment fees.

The RMB-denominated loans will reportedly carry matures of 20-25-years.

Reports from October 2022 claim that the cost of the project will be 9.9 billion with 8.4 billion in loan from China and 1.5 billion from the Government of Pakistan, though a final agreement has not be reached.

Then, in November 2022, during a meeting of Chinese President Xi Jinping and Prime Minister Shehbaz Sharif, both sides agreed to immediately activate their respective teams of technical and financial experts to fast-track progress on the much-delayed project.

Both governments have also constituted a Financing Committee to finalize the concessional financing arrangement for the project.

📋 Staff Comments

The ML-1 railway connects Karachi, Lahore, and Peshawar. More locational details can be found at https://www.beltroad-initiative.com/bri-factsheet-series-karachi-peshawar-line/ and https://www.google.com/maps/place/Karachi%E2%80%93Peshawar+Line/@24.8490697,67.0111297,15z/data=!4m5!3m4!1s0x0:0x3a74d73b462fc06b!8m2!3d24.8490697!4d67.0111297 and https://reconnectingasia.csis.org/database/projects/karachi-lahore-peshawar-ml1-rail-line-expansion-restoration/df56b152-7829-4b70-80fb-7508c42281b0/.

📚 Sources & References
  • PAK-CHINA ECONOMIC CORRIDOR (CPEC)
  • China to help upgrade Karachi-Peshawar railway track
  • Railways upgrade: Pakistan delays approval of Mainline-I amid differences over cost
  • Pakistan says CPEC to prove ‘game changer’ in the region, 2017 CPEC Review and Analysis
  • Expansion And Reconstruction Of Existing Line ML-1, $3.4 Billion Railway Project between Karachi and Peshawar to be Completed on Priority Basis
  • Expansion And Reconstruction Of Existing Line ML-1
  • China may be involved in running Karachi-Peshawar railway
  • BRI Factsheet Series – Karachi-Peshawar Line
  • Pakistan Estimates of Foreign Assistance 2018-2019
  • Pakistan to float tenders for $6.8 billion CPEC railway project in November
  • Up-Gradation And Dualization Of ML-1 And Establishment Of Dry Port Near Havelian
  • Cabinet Committee On CPEC Decides To Commence Financing Discussion Over ML-1 Project With China.
  • Struggling ML-1
  • Pakistan approves most expensive China-aided project to date
  • Rupee's fall increased Diamer-Bhasha dam's cost
  • NA panel told
  • CDWP okays 45% rise in ML-I cost
  • Pakistan asks Iran to raise power export by 100MW
  • Work on ML-1 to begin in June
  • ML-I project cost likely to be cut Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Pakistan

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant