Completed Mixed AidData Chinese Aid

China Eximbank provides $2.67 billion preferential buyer's credit for Padma Bridge Rail Link Project (Linked to Record ID#52765)

¥2.67M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Bangladesh
Country Bangladesh
Start Date Apr 27, 2018
End Date Nov 18, 2026
Duration 3,127 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 52663
Grant Description

China Eximbank provides $2.67 billion preferential buyer's credit for Padma Bridge Rail Link Project In January 2015, the Chinese Government proposed loans worth $15 to $20 billion to finance the expansion of various railways in Bangladesh.

Soon thereafter, Bangladesh's Ministry of Railways sent a set of projects to the Economic Relations Division (ERD) of Bangladesh's Ministry of Finance to inquire about potential Chinese financing.

Then, Bangladesh’s Ministry of Finance sent a list of projects, including the Padma Bridge Rail Project, to the Chinese Government.

At that point, Bangladesh's Ministry of Railways had already signed memoranda of understanding (MoUs) with China Railway Group Limited for the Padma Bridge Rail Project.

Then, on August 8, 2016, Bangladesh Railway and China Railway Engineering Corporation (CREC) signed a $3.13 billion commercial contract for the construction of a 172-kilometer-long railway line from Dhaka to Jessore crossing through the Padma Bridge.

Two months later, in October 2016, during the state visit of Chinese President Xi Jinping to Bangladesh, the Chinese Government and the Government of Bangladesh signed an MoU on the Padma Bridge Rail Link Project.

However, the project hit a snag because of disagreements between the Chinese Government and the Government of Bangladesh on the face value and interest rate of the proposed loan for the project.

The Bangladesh's Ministry of Railways requested that the project begin implementation in January 2017 in order to be completed by the time the Padma Bridge was completed. However, a loan agreement with China Eximbank had yet to be signed and was scheduled to be signed on December 16, 2017.

This date came and past, despite attempts of Bangladeshi authorities — including the Prime Minister's Office — to contact their Chinese counterparts to finalize the loan.

The Government of Bangladesh had wanted the project to be completed before Bangladesh's December 2018 general elections. Specific issues relating to the face value of the loan were related to major increases in the cost of land acquisition. China Eximbank disagreed with the Government of Bangladesh over the costs of the land acquisition.

As a result, China Eximbank reduced the promised loan amount by 15% (from approximately ৳247.490 billion BDT to ৳210.36 billion BDT) and turned its previously promised ‘soft loan’ (most likely a governmental concessional loan) into a preferential buyer's credit.

As a result, the Government of Bangladesh was forced to increase its counterpart funding contribution from ৳102 billion BDT to ৳190.43 billion BDT.

Then, on February 2, 2018, China Eximbank sent a letter to the Government of Bangladesh informing them that it would begin the process of signing the loan agreement.

To ensure that China Eximbank would issue the loan for the Padma Bridge Rail Link Project promptly, in early February 2018 (presumably after the China Eximbank letter was received), the Government of Bangladesh approved ‘on an urgent basis’ a China Eximbank government concessional loan worth RMB 1,547,071,939.09 ($231.5 million) for the Modernization of Telecommunication Network for Digital Connectivity Project (MOTN) (captured via Record ID#52765) because the ‘[d]elay in offering the green signal to the Chinese assistance [for the telecommunications modernization project] was affecting the implementation of the [Padma Bridge Rail Link Project].’ The Government of Bangladesh had previous problems with the MOTN loan and delayed approving it, which provoked concerns among the Chinese authorities.

To address these concerns and advance the Padma Bridge Rail Link Project, the Government of Bangladesh approved the MOTN loan.

Then, China’s State Council provided its approval for China Eximbank to issue a loan for the Padma Bridge Rail Link Project in February 2018.

The Chinese Government sent the loan agreement to the Bangladeshi Government by the end of February for final review and countersignature.

Then, on April 27, 2018, China Eximbank and the Government of Bangladesh signed the $2,667,940,000 preferential buyer's credit (PBC) agreement for the Padma Bridge Rail Link Project (PBRLP).

The PBC carried the following borrowing terms: an interest rate of 2%, a grace period of 6-years, a maturity period of 20-years, a management fee of 0.25%, and a commitment fee of 0.25%.

The proceeds of the PBC were to be used by the borrower to finance 85% of the cost of a $3,138,750,000 commercial contract between the Government of Bangladesh and CREC, which was signed in August 2016. The Government of Bangladesh is responsible for covering the remaining 15% ($470.81 million).

According to the Government of Bangladesh’s Economic Relations Division (ERD), the PBC had achieved a disbursement rate of 20% ($533,588,000 out of $2,667,940,000) as of June 30, 2020 and a 40.4% disbursement rate ($1,079,727,000 out of $2,667,940,000) as of June 30, 2021, a 58.8% disbursement rate ($1,569,247,000) out of $2,667,940,000) as of June 30, 2022, and a 76.8% disbursement rate ($2,050,115,000 out of $2,667,940,000) as of June 30, 2023.

According to the Government of Bangladesh’s ERD, the borrower had not made any repayments under the PBC as of June 30, 2021, June 30, 2022, or June 30, 2023.

The purpose of the project is to construct a new railway track that runs from the city of Dhaka to the city of Jessore via Padma Multipurpose Bridge to establish new Broad Gauge (BG) railway connectivity through south-west part of the country. The project is being implemented in 2 phases. The first phase is an 82 kilometer section from Dhaka to Bhanga, and the second phase is a Bhanga to Jessore section.

The project involves the construction of 215.22 km of rail track, including loops and sidings; 23.38 km of viaducts, 1.98 km of ramps, 66 major bridges, 244 minor bridges and culverts, 1 highway overpass, and 29 level crossings.

The project also includes the construction of 14 new station buildings, remodeling of 6 existing station buildings, the supply of 100 passenger coaches, and the acquisition of 1796 acres of land. 172 kilometer of track is to be laid between Dhaka to Jessore via Padam Bridge and Bhanga of Faridpur, while 43.2 km of track was set to be lines loop lines. 23 kilometers of the rail line is set to be elevated.

The single-track rail line is designed to accommodate a maximum speed of 120 kilometers per hour.

Construction of the railway is expected to impact the living accommodations of 7,705 people, necessitating resettlement arrangements.

The PBRLP seeks to establish a rail-based transportation network with nine southern districts including the Port of Mongla and Benapole Land Port through the 6.15-kilometer Padma Bridge (which was still under construction when this project began implementation).

The route is to be constructed in four sections: Dhaka-Gendaria, Gendaria-Mawa, Mawa-Bhanga junction via Padma Bridge and Bhanga-Jessore Bridge.

The 50-kilometer-long Mawa-Bhanga junction-Bhanga via Padma Bridge section was originally expected to be completed by the end of 2018 to allow trains to travel over the bridge on the day of its inauguration.

The project, part of the Bangladesh-China-India-Myanmar Economic Corridor (BCIM) of the Belt and Road Initiative (BRI), is expected to cut the travel time from Dhaka to Kolkata, West Bengal, India by five hours and time from Dhaka to Khulna in southern Bangladesh from nine hours to 3 hours. CREC is the general EPC contractor responsible for implementation.

China Railway First Group Co, Ltd. (CRFG) — a subsidiary of China Railway Group Limited — is also involved in project implementation.

The Engineering Corps of Bangladesh Army and Bangladesh University of Engineering and Technology have also served as consultants for the project.

Bangladesh Railway is the main executing agency on behalf of the Bangladeshi Government, while Bangladesh's Ministry of Railways (MoR) is the ‘sponsoring ministry.’ After the signing of the loan agreement, construction was placed under the supervision of Fast Track Project Monitoring Committee, headed by Prime Minister of Bangladesh Sheikh Hasina.

Project implementation commenced on July 3, 2018, with an intended completion date of June 2022.

However, even by May 2018, before implementation had commenced, Bangladesh Railways officials were attempting to secure an extension of implementation from June 2022 to June 2024 due to the previously described delays relating to the loan.

Prime Minister Hasina officially inaugurated work on the project on October 14, 2018, despite the commencement of construction works several months prior. By November 2020, the project had achieved a 28.28% completion rate, despite the outbreak of the COVID-19 pandemic.

The expected project completion date at that time was June 2024, and the Mawa-Bhanga junction-Bhanga via Padma Bridge section was to be set to be open in 2021 (although this section was originally scheduled to be opened by the end of 2018). On August 23, 2021, the installation of all road slabs on Padma Bridge was completed.

In total, 2,917 road slabs and 2,959 railway slabs were installed on the 6.15 km-long bridge.

As of November 2021, the physical works of the main structure of the Padma Bridge had achieved a 95% completion rate and the overall progress of the bridge construction stood at an 88.75% completion rate. Asphalt carpeting on the road slabs also began in November 2021. On June 25, 2022, Prime Minister Hasina inaugurated the four-lane highway on the upper level of the Padma Bridge.

Then, on December 24, 2024, the Padma Bridge Rail Link Project officially opened to traffic across its entire route, linking Dhaka to Jessore via the Padma Bridge.

📋 Staff Comments
  1. This project is also known as the Padma Rail Link Project and the Dhaka-Jessore Railway Project. The Chinese project title is 帕德玛大桥铁路连接线项目.
  2. The Government of Bangladesh’s loan identification number for the PBC is B1120180427A.
  3. There is a Bangladeshi Government website dedicated to this project: https://pbrlp.gov.bd/.
  4. This $2.67 billion China Eximbank loan is not recorded the China’s Overseas Development Finance Dataset, which Boston University's Global Development Policy Center published in December 2020.
📚 Sources & References
  • Padma Bridge Rail Link Press Release
  • Padma Bridge Rail Link
  • Bangladesh Padma Bridge Rail Link Project Budget Increased by 12%
  • Bangladesh's Padma Bridge Rail Link project loan is expected to be approved
  • Bangladesh Railway Minister accepts parliamentary inquiry on Padma Railway Link project
  • The Philippines got less
  • Bangladesh signs $2.76 billion loan deal with China’s Exim Bank for Padma Bridge rail links
  • PM opens Padma Bridge rail link work
  • China likely to confirm $3.0b loan next month
  • Padma railway link project gets life
  • Roundup: China-funded bridge rail link contributes to Bangladesh-India connectivity project
  • BR spends only 10pc of ADP allocation in H1
  • Cost escalates by Tk 50bn before construction begins
  • MoU signed with China for Padma Bridge rail link
  • Economic Division Relation
  • BD needs to apply anew for Chinese buyer's credit
  • Padma railway project cost to swell by 12pc
  • Lack of Chinese funds stall Padma bridge rail links
  • BR announces start of project work, $2.67b Padma Rail Link Project loan deal on April 28
  • Dhaka-Jessore Railway (Construction)
  • China offers soft loan to help expand Bangladesh railway networks
  • Riding with the Dragon
  • Chinese business model - II
  • PM gives nod to $2.67b Chinese loan
  • Bangladeshi PM inaugurates construction of China-financed rail project
  • BD sign $ 2 76-bn loan deal with China bank for bridge rail links
  • China gives nod to $3.14b loan for Padma rail link
  • Bangladesh: China's $2.6b loan may get approval today
  • Padma Rail Link project launched
  • BANGLADESH TURNS TOWARDS CHINA
  • Bangladeshi PM inaugurates construction of China-financed rail project
  • Fast-track projects to miss deadlines
  • Overall progress of Padma Bridge rail link project now at 28.23%
  • Padma Bridge Rail Link Project Home Page
  • Resettlement Activities
  • Bangladeshi PM inaugurates construction of China-financed rail project
  • About Us-, $2.67bn loan agreement for Padma rail link project signed
  • Roundup: China-funded bridge rail link contributes to Bangladesh-India connectivity project, $2.67b Padma Rail Link Project loan deal on April 28
  • Press Release
  • Padma Bridge Rail Link Dhaka-Jessore Railway
  • Chinese engineers erect 1st box girder of Bangladesh's longest railway viaduct
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF SUPPLIERS'/BYERS CREDIT(ACTIVE)
  • Chinese Ambassador H.E.Mr. Ma Mingqiang Attended the Contract Signing Ceremony for Padma Bridge Rail Link Project
  • Preferential Buyers Credit Agreement for Padma Bridge Rail Link Project
  • Press release on meeting between H.E. Mr. Md. Shahriar Alam
  • MP Hon’ble State Minister for Foreign Affairs and H.E. Mr. Zhang Zuo, newly appointed Ambassador of China to Bangladesh, বািষ ȟক ɛিতেবদন ২০১৭-২০১৮ অথȟ-বছর
  • Loan agreement of Padma rail link project signed
  • 中铁签孟加拉国最大基建工程帕德玛大桥铁路连接线项目
  • 中国中铁孟加拉国帕德玛大桥铁路连接线项目取得重要进展
  • 比计划提前50天!中老铁路“国门”第一站大桥完工, $2.67bn loan agreement for Padma rail link project signed
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF SUPPLIERS'/BYERS CREDIT (ACTIVE) Up to 30 June 2020
  • Carpeting works on Padma Bridge begins
  • 刘振华参赞视察帕德玛大桥铁路连接线项目
  • Carpeting on Padma Bridge begins
  • 比计划提前50天!帕德玛大桥铁路连接线首座钢桁梁特大桥建成
  • Padma Bridge Presentation
  • DRS Official Commitments from China through 2020, $2.67b Padma Rail Link Project loan deal on April 28
  • Jointly Building Belt and Road towards SDGs - Bangladesh
  • Dhaka-Jessore Railway (Construction)
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF SUPPLIERS'/BYERS CREDIT (ACTIVE)
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE)
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE)
  • Padma Bridge Rail Link project to open in June 2023, says project director
  • Padma Bridge gets final touches before the June 25 grand opening
  • Chinese-built Padma Bridge opens to traffic in Bangladesh
  • Bangladesh's largest railway officially opens across its entire line to traffic
  • Padma Bridge Rail Link Officially Opens in Bangladesh Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Bangladesh

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant