Completed Development AidData Chinese Aid

ICBC provides $100 million loan for 49.5MW Sachal Wind Power Project (Linked to Record ID#72072)

$100M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization Sachal Energy Development Pvt Ltd (SEDL)
Country Pakistan
Start Date Feb 15, 2015
End Date Apr 19, 2028
Duration 4,812 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 52660
Grant Description

ICBC provides $100 million loan for 49.5MW Sachal Wind Power Project On February 15, 2015, the Industrial and Commercial Bank of China (ICBC) and Sachal Energy Development Pvt Ltd (SEDL) entered into a $100 million (USD-denominated) loan facility agreement for the 49.5MW Sachal Wind Power Project in Jhimpir, Pakistan.

SEDL also entered into a 727,352,000 Pakistani rupee (PKR-denominated) loan facility agreement with ICBC-Pakistan (worth $7.134 million USD).

The total cost of this independent power project (IPP) was $130.481 million and it was reportedly financed according to a debt-to-equity ratio of 80:20.

📋 Loan / Grant Terms
💰 Loan Amountagreement
📅 Maturity12 years
⏳ Grace Period2 years

However, as of July 1, 2023, the loan's interest rate was reset to daily simple SOFR plus a 3.75% margin. Arif Habib Corporation Limited issued a corporate guarantee in support of the loan.

The loan was also secured (i.e. collateralized) against first charge of $107,134,400 (duly registered with Securities and Exchange Commission of Pakistan) over all present and future current and operating fixed assets of SEDL and a pledge of all shares in SEDL. The 727,352,000 Pakistani rupee (PKR-denominated) loan agreement is captured via Record ID#72072.

📋 Loan / Grant Terms
📅 Maturity12 years
⏳ Grace Period2 years

However, as of July 1, 2023, the loan's interest rate was reset to daily simple SOFR plus a 3% margin.

Sachal Energy Development (Ptd) Limited -- a project company (special purpose vehicle) that is 100% owned by Arif Habib Corporation Limited -- was established to finance, design, implement, and maintain the 49.5MW Sachal Wind Power Project.

The purpose of this project was to utilize wind resources for electricity generation through the construction of a wind farm with a total capacity of 49.5 MW and to deliver the electricity generated from the project to the power purchaser, i.e. National Transmission & Dispatch Company Limited (NTDC).

The project involved the installation of 33 Wind Turbine Generators (WTGs) from Goldwind. Each WTG had a capacity of 1.5 MW.

Hydrochina Corporation was the offshore EPC contractor and Hydrochina International Engineering Company Ltd Pakistan was the onshore EPC contractor for the project.

Sachal Energy Development Pvt Ltd signed a power purchase agreement with National Electric Power Regulatory Authority in February 27, 2014, and the National Transmission and Despatch Company (NTDC) agreed to purchase electricity at a tariff of USD 0.14861/kWh. The project's inauguration ceremony was held on April 20, 2015.

Construction began on December 11, 2015. All WTGs were installed by December 20, 2016. The purchaser and seller Interconnection facilities were energized on March 6, 2017. The project ultimately achieved its commercial operation date (COD) on April 10, 2017.

Compared with the Dawood Wind Power Project, another a Chinese bank-financed 49.5 MW wind farm with a purchase tariff of USD 0.1187/kWh, the electricity from the Sachal Wind Farm is more expensive. It is expected that the project will provide power supply to the national grid of 136,500 MWh per annum.

This wind power generation project site was developed on 275 hectares of land and it is located on Jhimpir within Thatta District and Sindh Province.

The Sachal 49.5 MW Wind Power Project was the first project with a signed loan agreement under China-Pakistan Economic Corridor (CPEC).

📋 Staff Comments
  1. The Chinese project title is 巴基斯坦萨察尔50MW风电项⽬.
  2. A 2013 tariff petition determination document released by National Electric Power Regulatory Authority (NEPRA) states that the debt financing costs of the project were to be shared between China CITIC Bank (80% of debt) and Askari Bank Limited (20% of debt). However, the tariff petition was ultimately rejected, which suggests that ICBC may have become the sole foreign financier to the project.
  3. The Sinosure insurance premium is identified via https://www.dropbox.com/s/bmx3w2b38o7guxm/Debt%20Pricing%20of%20IPPs%20%28002%29.pdf?dl=04. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
📚 Sources & References
  • CHINA'S PROWESS IN INFRASTRUCTURAL DEVELOPMENT CAN BE A BEST MODEL FOR PAKISTAN
  • FAST TRACK MOVEMENT ON ENERGY FRONT IN PAKISTAN
  • CHINA'S INVESTMENTS IN PAKISTAN'S ENERGY SECTOR -- A SIGNIFICANT MOVE
  • Sachal Wind Farm (Jhimpir
  • Thatta)
  • Annual Reviews of CPEC Projects - Energy
  • Duke University - ENVIRONMENTAL AND ECONOMIC IMPACTS OF THE BELT AND ROAD INITIATIVE ON PAKISTAN’S ENERGY SECTOR
  • Pakistan Economic Survey Annex III China-Pak Economic Corridor (CPEC) 2016-2017
  • Sachal's wind power project starts production
  • ICAP CONFERENCE CPEC-MYTHS & REALITIES - ENERGY PROJECTS UNDER THE CPEC REGULATORY ASPECTS
  • Submission of the Tariff Petition of Sachal Energy Development (Pvt.) Limited for 50 MW power plant (SEDPL) at Jhimpir Area
  • Thatta
  • Sindh
  • NATIONAL ASSEMBLY 46th Session
  • ICBC First Contracted Project under CPEC Starts Commercial Operation, : Determination of National Electric Power Regulatory Authority in the Matter of Tariff Petition filed by Sachal Energy Development (Pvt.) Ltd.
  • Sachal 50MW Wind Farm Project
  • Decision of the Authority in the matter of Tariff Adjustment at Commercial Operations Date of Sachal Energy Development (Pvt.) Ltd.
  • License Application Sachal Energy Development (Private) Limited
  • Sachal Energy Department (Pvt.) Ltd.
  • 一带一路 ”PPP 项目案例 —— 巴基斯坦萨察尔 50MW 风电项目
  • Project design document form for CDM project activities
  • 中巴经济走廊首个签约项目实现商业运营
  • 工商银行助力巴基斯坦萨察尔风电项目, 'Belt and Road' PPP project case-Pakistan Sazar 50MW Wind Power Project
  • Sachal Energy Department
  • Arif Habib Corp Annual Report 2016
  • Escalating Growth Annual Report 2018, 2016 Government of Pakistan Bond Prospectus
  • Together We Grow
  • NEPRA okays new financing mechanism for 59 IPPs of different technologies Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sachal Energy Development Pvt Ltd (SEDL)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant