Completed Development AidData Chinese Aid

China Eximbank provides $175 million loan for 200MW North Khartoum Thermal Electricity Station Construction Project

$175M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Sudan National Electricity Corporation (NEC Sudan)
Country Sudan
Start Date Apr 01, 2005
End Date Jul 22, 2027
Duration 8,147 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 47026
Grant Description

China Eximbank provides $175 million loan for 200MW North Khartoum Thermal Electricity Station Construction Project In April 2005, China Eximbank signed a $175 million loan agreement with the Sudan National Electricity Corporation (NEC) for the 200MW North Khartoum Thermal Electricity Station Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountcarried the following borrowing terms: a 12-year maturity
📅 Maturity12 years
⏳ Grace Period3 years
💹 Interest Rate3.7%

The first withdrawal date was September 2005.

This project involved a 2 × 100 MW extension to existing power station facilities at the Khartoum North Thermal Electricity Station in North Khartoum, Sudan. China Machinery Engineering Corporation (CMEC) was the contractor responsible for implementation. Mott MacDonald (MML) served as the project consultant.

Construction began in 2007. By February 2009, the project had achieved a 70% completion rate. The expanded power plant was completed and put into operation in March 2011.

📋 Staff Comments
  1. This project is also known as the 200MW Khartoum North Thermal Electricity Station Construction Project, the Khartoum North (Al Shaheed) Power Plant Construction Project, Khartoum North Power Plant Extension Project Phase III, the Khartoum North Power Station Expansion Project, and Martyr Dr. Mahmoud Sharif Bbhari Phase III/Unit D Power Plant Expansion Project. The Chinese project title is 苏丹喀北电站项目 or 苏丹喀土穆北电站2×100MW扩建项目安装项目 or 北喀土穆电站扩建项目 (See: 驻苏丹大使李成文视察北喀土穆电站扩建项目并慰问中方员工).
  2. The Bank of Sudan 2005 annual report lists 'CAMC Co' in parentheses in the project name, but it is not clear if this means that 'CAMC Co' was the financier, implementing organization, or both. SAIS-CARI claims that CMEC was both (and provided a supplier's credit to finance the project's implementation). This issue warrants further investigation.
  3. Khartoum North Power Station has operated since 1985. It was first commissioned and built by companies from the United Kingdom.
📚 Sources & References
  • China-Africa Economic Relations in the Post Mao era: Case study of Sudan
  • CENTRAL BANK OF SUDAN 45TH ANNUAL REPORT 2005
  • Khartoum North Power station
  • Transcript of Copy of CMEC INTRODUCTION
  • CMEC Global Offering
  • China's Global Energy Finance
  • China National Machinery & Equipment Import & Export Corporation Introduction
  • 苏丹喀土穆北电站2×100MW扩建项目安装项目
  • 力争完成节点目标 向党的88岁生日献礼 中设集团苏丹喀北电站项目现场党支部用实际行动践行科学发展观
  • Int'l society should help Darfur as China has
  • CMEC – The Chinese Company that Moved Africa
  • CENTRAL BANK OF SUDAN 45TH ANNUAL REPORT 2005
  • 苏丹喀土穆北电站2×100MW扩建项目安装项目
  • 驻苏丹大使李成文视察北喀土穆电站扩建项目并慰问中方员工
  • Mott MacDonald named owner's engineer for Sudan project
  • CMEC苏丹喀北项目部向公司致感谢信
  • Chinese Loans to Africa Database
  • External Debts
  • Growth and Peace in the Sudan Some Serious Challenges Facing the Country in the Post-Conflict Era
  • Bank of Sudan Annual Report 2005, تنفيذ المرحلة الأخيرة لمشروع امتداد محطة الشهيد الحرارية, وزارة الموارد المائية والري والكهرباء الشركة السودانية للتوليد الحراري Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sudan National Electricity Corporation (NEC Sudan)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant