Completed Mixed AidData Chinese Aid

China Eximbank provides $385.8 million preferential buyer's credit for Kribi-Lolabe Highway Construction Project

$385.81M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)
Country Cameroon
Start Date May 16, 2014
End Date Dec 17, 2027
Duration 4,963 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 46436
Grant Description

China Eximbank provides $385.8 million preferential buyer's credit for Kribi-Lolabe Highway Construction Project On May 16, 2014, China Eximbank signed a $385,808,808.60 in preferential buyer credit (PBC) agreement [CHINA EXIMBANK PBC NO. (2014) 6 TOTAL NO. (300)] with Cameroon's Ministry of Economy, Planning, and Regional Development (MINEPAT) for the Kribi-Lolabe Highway Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountwere as follows: a 2% interest rate
💹 Interest Rate2%

The proceeds of the PBC were to be used by the borrower to finance 85% of the total cost ($453,892,716.00) of a commercial (EPC) contract between the Steering and Monitoring Committee of the Kribi Industrial and Port Complex of Cameroon and China Harbour Engineering Company Ltd., which was signed on November 28, 2012.

The remaining 15% ($68,083,907.40) was to be provided by the Government of Cameroon's MINEPAT.

However, after MINEPAT failed to meet its counterpart funding commitment, CHEC provided a loan (‘pre-financing’) worth approximately $68,083,907.40 to the Government of Cameroon to finance the remaining 15% of the cost of the $453,892,716.00 commercial contract.

📋 Loan / Grant Terms
💰 Loan Amountare unknown

The borrower agreed to deposit project-related revenues in a special account to facilitate repayment.

Under the terms of a Repayment Mechanism Agreement, the borrower was expected to deposit all project (toll) revenues in a CFA franc special (control) account and maintain a minimum cash balance in a separate escrow account (compte séquestre) equivalent to two, semi-annual debt service (principal, interest, and fee) payments.

The cash balance of the control account was CFA 705,803,000 as of May 31, 2023.

As of December 31, 2020, the China Eximbank loan (PBC) had achieved a 80.6% disbursement rate (with an undisbursed balance of CFA 40.1 billion). The loan’s outstanding amount was equivalent to CFA 163.5 billion as of December 31, 2020. The purpose of this 38.5 km (+4.5km) highway construction project was to facilitate access to the Kribi deep-sea port.

It involved construction of a 38.5 km 2x2-lane highway -- with a maximum design speed of 110 kilometers per hour -- starting from Mboro village and running to Bibolo in the Kribi II district.

It also included (a) the construction of 4.5 km of road that connects Kribi-Lolabe highway to the Edéa-Kribi highway (or Nationale 7 Edéa-Kribi), and (b) the construction of two interchanges, three separated interchanges, one toll station at the main road, and one ramp toll station. The highway (expressway) was designed and constructed according to Chinese standards.

China Harbour Engineering Company Ltd. (CHEC) was the contractor responsible for implementation. Construction commenced on January 1, 2015.

However, it was temporarily halted on November 26, 2018 due to (a) the failure to appoint a highway operator, (b) the failure to sign an escrow account agreement, and (c) and accumulated payment arrears worth CFA 75.5 billion. As of March 2019, the project had achieved an 88% completion rate. Then, during last few months of 2019, construction was again temporarily halted before resuming in January 2020.

CHEC and the Cameroon Ministry of Public Works stated that the project had achieved an 88.14% completion as of January 2020.

Then, on December 30, 2020, Cameroon’s Minister of Public Works and Minister of Finance signed a public-private partnership (PPP) contract with CHEC to finance the Cameroonian Government’s 15% of the project cost, tacitly acknowledging that the Cameroonian Government could not honor its commitment to finance 15% of the commercial contract cost due to a series of crises.

The timeline for completion of the project was subsequently revised to August 2021. As of November 3, 2021, the project had achieved a 98.19% completion rate. The project achieved provisional acceptance (completion) on December 31, 2021. The highway was opened to traffic in July 2022.

There are some indications that the China Eximbank loan for the Kribi-Lolabe Highway Construction Project may have financially underperformed vis-a-vis the original expectations of the lender. In January 2019, Cameroon unilaterally withheld debt service payments to China Eximbank. The lender responded by withholding new loan disbursements.

Then, in July 2019, China Eximbank and the Government of Cameroon signed a debt rescheduling agreement (as captured via Record ID#88213).

Under the terms of the agreement, China Eximbank agreed to reschedule 18 loans previously contracted by the Government of Cameroon — with scheduled principal repayments between July 2019 and March 2022 — by allowing the borrower to defer scheduled principal repayments between July 2019 and March 2022 to later dates but without any maturity extensions.

The total amount of restructured debt was equivalent CFA 148 billion ($253 million) — or 70% of the loan principal that was scheduled for repayment between July 2019 and March 2022.

Under the terms of the agreement, the Government of Cameroon agreed to repay 30% of the loan principal according to the original July 2019-March 2022 schedule (i.e. without any payment deferrals).

The lender and the borrower also agreed to cancel the committed but undisbursed loan balances worth approximately CFA 10 billion (for certain loans with disbursement deadlines that had already passed).

Then, in January 2020, the International Monetary Fund (IMF) classified the Government Cameroon as facing a high risk of debt distress.

Eighteen months later, during an address before Cameroon’s National Assembly on June 28, 2021, the Minister of Water and Energy (MINEE) Gaston Eloundou Esommba provided an update on the ICBC-financed Bini à Warak Hydroelectric Power Plant Project.

He noted that the project had been 'on hold' since November 2019 because ICBC suspended the loan agreement, even though the Government of Cameroon had already mobilized XAF 22 billion of counterpart funding.

He also explained that 'the reason for this suspension is that Cameroon did not settle some of its debts towards China on time, so, it is in a cross-default situation.’ However, in its 2023 annual report, La Caisse Autonome d'Amortissement du Cameroun (CAA) noted that the borrower had complied with the minimum account balance requirement under its Repayment Mechanism Agreement for the Kribi-Lolabe Highway Construction Project with China Eximbank.

📋 Staff Comments
  1. This project is also known as the Lolabé-Kribi Highway Project and the Kribi-Mboro Highway Project. The Chinese project title is 克里比至洛拉贝高速公 or 喀麦隆克里比深水港疏港高速公路一期工程项目. The French project title is Autoroute Kribi-Lolabé.
  2. In the database of Chinese loan commitments that SAIS-CARI released in 2020 and re-released in 2021, it does not record the borrowing terms of this China Eximbank loan. AidData records the borrowing terms (20-year maturity, 5-year grace period, 2% interest rate) that are contained in the actual loan agreement [CHINA EXIMBANK PBC NO. (2014) 6 TOTAL NO. (300)] supporting the project. Also, SAIS-CARI records the loan as a government concessional loan (GCL). However, the loan agreement clearly states that it is a preferential buyer's credit (PBC).
  3. The loan agreement can be accessed in its entirety in SourceID#67880 and https://www.documentcloud.org/documents/20485919-cmr_2014_181.
  4. The project ID number for this transaction in Cameroon's Development Assistance Database (DAD) is CAM/000862.
  5. The special purpose vehicle that is now responsible for the Kribi-Lolabe Highway is called Kribi Highway Management (KHM). It is a wholly-owned subsidiary of CHEC. KHM is in charge of part of the financing of the highway (around 20%), construction, operation and maintenance over a 30-year period (2022-2052). See https://unece.org/sites/default/files/2024-01/Case_Study_Database_PPP_Forum_2023.pdf
📚 Sources & References
  • 2022 Best Practices of Sustainable Infrastructure. Projects
  • Après la construction, le Cameroun confie au Chinois CHEC l’exploitation et la maintenance de l’autoroute Kribi-Lolable
  • Autoroute Kribi - Lolabe: le mensonge d'Etat
  • Autoroute Kribi-Lolabe (Terminal minéralier) avec des infrastructures connexes
  • Autoroute Kribi-Lolabe: Nganou Djoumessi recommande la révision du contrat de partenariat État -CHEC
  • Autoroute Kribi-Lolabé : les dessous de l’attribution du marché à la chine
  • Autoroute Kribi-Lolabé. 38 kilomètres à achever en 2018.
  • Autoroute Yaoundé-Douala (Phase I): réception provisoire effective.
  • Cameroo Kribi-Lolabe highway project
  • Cameroon : Voici le nouveau visage de l'autoroute Kribi-Lolabé
  • Cameroon: Kribi-Lolabé Double Carriage Road - Eximbank China to Provide Fcfa 192.91 Billion
  • Cameroun : Deux autoroutes seront livrées à la fin de cette année
  • Cameroun : l’Etat injectera 4 milliards de FCfa dans la construction d’une autoroute desservant le port de Kribi
  • Cameroun – Autoroute Kribi – Lolabé: Livraison le 31 décembre 2021
  • Chantiers routiers : l’État du Cameroun doit plus de 200 milliards de FCFA aux entreprises
  • China Loans to Africa
  • Chinese-built highway inaugurated in southwestern Cameroon
  • Development: Government Announces Comprehensive Audit on Companies Working on the Kribi-Lolabé Road Project
  • Government of Cameroon 2020 Register of Chinese Loans and Borrowing Terms, https://www.cameroon-tribune.cm/article.html/30226/fr.html/autoroute-kribi-edea-les-travaux#
  • La livraison de l’autoroute desservant le port en eau profonde de Kribi (38,5 km) finalement annoncée au 3e trimestre 2020
  • Lolabé-Kribi Highway
  • CHEC resumes construction works
  • Lolabé-Kribi Highway
  • CHEC resumes construction works
  • L’ASSISTANCE FINANCIÈRE CHINOISE AU CAMEROUN (1973-2018)
  • L’autoroute Kribi-Lolabé réalisé à 98,19%
  • Pour accélérer les travaux de l’autoroute Kribi-Lolabé, le Cameroun signe un PPP avec le Chinois Chec
  • Preferential Buyer Credit Loan Agreement on Cameroon Kribi-Lolabe Highway Project
  • Projet Autoroute Kribi-Lolabé
  • RAPPORT ANNUEL 2023
  • Rapport DAD-Cameroon sur l’Aide au Développement 2012-2013
  • Révision du contrat d’exploitation de l’autoroute Kribi-Lolabé : Kribi Highway Management réclame un retour sur investissement
  • State visit of the President of the Republic of Cameroon H. E. Paul BIYA to China
  • UNECE PPP and infrastructure award 2023
  • 喀麦隆总统授权与中国进出口银行签署克里比至洛拉贝高速公路贷款协议
  • 驻喀麦隆大使王英武在喀《论坛报》发表署名文章《诚意促发展 合力创未来》, 🇨🇲Cameroun : AUTOROUTE KRIBI-LOLABE REALISE A 98,19% L’heure est aux finitions de cet ouvrage situé sur la route nationale No 7 dans la région du Sud, précisément dans la ville balnéaire Kribi. L’infrastructure participe de la croissance économique du Cameroun. Les matériaux qui constituaient le blocage à la célérité des travaux sont désormais en place. Les travaux de l’autoroute Kribi-Lolabé seront réceptionnés au 31 décembre 2021 ainsi que les équipements de péage. La construction de cette route est financée par la Banque africaine de développement et le Budget d’investissement public à hauteur de plus de 33 milliards de Fcfa Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant