Completed Mixed AidData Chinese Aid

China Eximbank provides $360 million preferential buyer’s credit for 150MW Zongo II Hydroelectric Dam Construction and a 220 kV Transmission Line Project (Linked to Record ID#59085)

$360M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Democratic Republic of Congo
Country Democratic Republic of the Congo
Start Date Jan 29, 2011
End Date Aug 09, 2029
Duration 6,767 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 460
Grant Description

China Eximbank provides $360 million preferential buyer’s credit for 150MW Zongo II Hydroelectric Dam Construction and a 220 kV Transmission Line Project On January 29, 2011, China Eximbank and the Government of the Democratic Republic of Congo signed a $360 million preferential buyer’s credit (PBC) agreement [CHINA EXIMBANK PBC NO (2011) TOTAL NO 153] for the 150MW Zongo II Hydroelectric Dam Construction and a 220 kV Transmission Line Project.

📋 Loan / Grant Terms
💰 Loan Amountcarried the following borrowing terms: a 20 year maturity
📅 Maturity20 years
⏳ Grace Period8 years
💹 Interest Rate2%

The proceeds of the loan were on-lent to Societe Nationale d'Electricite (SNEL).

The loan was secured with SNEL income derived from electricity sales to mining companies in Katanga Province and deposited in an escrow account ("compte séquestre").

According to Government of the DRC's Aid Management Platform (AMP), the loan had disbursed $91,046,040.07 as of July 2019. The loan's (principal) amount outstanding was $360,000,000 in 2020, $330,000,000 in 2021 and $300,000,000 in 2022.

The cash balance of the escrow account was $37.52 million as of December 31, 2022 and $37.35 million as of December 31, 2023.

The project involved the construction of the Zongo II hydroelectric dam and the construction of a 220 kV transmission line from the dam to Kinsuka. The dam was expected to produce 150 megawatts per annum and create 2,000 jobs during its three-year construction phase. Sinohydro and Societe Nationale d'Electricite (SNEL) were jointly responsible for project implementation.

At the time construction began on May 16, 2012 the project was expected to be completed in 2015, but the project was officially completed on June 22, 2018.

There were additional materials supplied during 2020, including 220kV transmission line towers, insulators, ground conductors, optical cables and fittings.

📋 Staff Comments
  1. This project is also known as Central Zongo II Dam, 150MW Zongo II Hydropower Station Project, and Phase 2 of the Zongo Hydroelectric Dam Project. The Chinese project title is ZONGO Ⅱ水电站实 or 宗果水电站二期 or 宗戈水电站二期 or 宗果水电站二期项目. The French project title is Construction du Barrage Zongo or Construction de la centrale hydroélectrique de ZONGO é et des Réseaux Associés.
  2. China Eximbank also provided a $298.88 million preferential buyer’s credit in 2018 for the Kinsuka 220KV Substation and Associated Distribution Networks Project (as captured via Record ID#59085). The purpose of this project is to evacuate power from the Zongo II hydroelectric dam.
  3. The DRC Government's Annual Public Debt Report in 2021 identifies the loan's (principal) amount outstanding as $360,000,000 as of December 31, 2021. See https://risquepays.gouv.cd/statistics/wp-content/uploads/2022/09/Rapport-annuel-de-gestion-de-la-dette-publique-2021-DGDP.pdf4. The Congolese Government's SYGADE loan identification number is 362210202. SYGADE is the French acronym for Debt Management and Financial Analysis System (DMFAS).
  4. Evidence of collateralization is provided via https://rucforsk.ruc.dk/ws/portalfiles/portal/57116566/Malm_2016_PhD_dissertation.pdf6. The time-stamped cash balances in the escrow account are drawn from https://dgdp.cd/wp-content/uploads/2025/04/RAPPORT-ANNUELLE-version-2.pdf and https://web.archive.org/web/20250225142713/https://dgdp.cd/wp-content/uploads/2024/12/DGDP-RAPPORT-ANNUEL-2023.pdf
📚 Sources & References
  • http://www.allvoices.com/contributed-news/12189222-drc-the-construction-of-zongo-ii-dam-began, http://www.bloomberg.com/news/2011-02-04/china-loans-367-5-million-to-congo-for-hydroelectric-plant.html, http://www.reuters.com/article/2011/02/05/ozabs-congo-democratic-power-idAFJOE71403920110205, http://www.sarwatch.org/headline-news-for-the-drc/126-mining-and-politics-in-drc/1577-dr-congo-signs-367-mln-hydro-deal-with-china-.html, http://english.peopledaily.com.cn/90001/90776/90883/7067673.html, http://search.proquest.com.gate2.library.lse.ac.uk/docview/878832962/13EB815F5441378194C/4?accountid=9630
  • Visiting the Chinese-financed Zongo II Dam
  • Interactive map – Chinese dams in Africa
  • African Economic Outlook: Democratic Republic of the Congo
  • DRC's Aid Management Platform
  • Democratic Republic of Congo 2013-2017, http://www.powerchina.cn/art/2017/2/7/art_23_220136.html
  • 中国水电承建的刚果(金)宗戈2水电站隆重举行开工庆典
  • 中国电建承建的刚果(金)宗戈水电站二期开工
  • RD del Congo
  • Central Hidroeléctrica Zongo II
  • Djibouti : coup d'envoi d'un projet d'adduction d'eau potable entre Djibouti et l'Ethiopie (PAPIER GENERA)
  • 刚果(金)总统卡比拉视察我中水电一局承建的 ZongoⅡ水电站项目工地
  • Democratic Republic of Congo Review of Public Expenditure Management and Financial Accountability Increase the Efficiency and Efficiency of the Public Sector for Promote Growth and Development (In Two Volumes) Volume II
  • Conceptual Plan for Enhancing Transmission Infrastructure to Expand Electricity Access in the Democratic Republic of the Congo (DRC)
  • La Chine et la RDC signe un accord de prêts pour le financement du projet de la centrale hydroélectrique Zongo II
  • REPONSES DU DIRECTEUR GENERAL DE LA SOCIETE NATIONALE D’ELECTRICITE AUX PREOCCUPATIONS SOULEVEES PAR LES HONORABLES DEPUTES NATIONAUX SUITE A LA QUESTION ORALE AVEC DEBAT POSEE PAR L’HONORABLE CLEMENT KANKU BUKASA
  • 刚果(金)总统卡比拉等出席宗戈水电站二期项目开工仪式
  • 刚果(金)总统卡比拉等出席宗戈水电站二期项目开工仪式
  • Projets
  • BU_PITCH_ENGLISH_2018.xlsx
  • 中刚签署宗果水电站二期项目贷款协议
  • Rapport Annuel 2012
  • POWERCHINA finishes construction on Zongo Hydropower Station in Congo
  • 刚果(金)总统卡比拉等出席宗戈水电站二期项目开工仪式
  • China's Global Energy Finance
  • Construction centrale hydroélectrique de Zongo II.pdf
  • 刚果(金)总统卡比拉等出席宗戈水电站二期项目开工仪式
  • 中刚签署宗果水电站二期项目贷款协议
  • POWERCHINA finishes construction on Zongo Hydropower Station in Congo
  • China powers Africa to narrow energy deficit
  • TOME I SERVICES CENTRAUX
  • Guest Post: Visiting the Chinese-financed Zongo II Dam
  • 水电一局全力保障刚果(金)首都金沙萨疫情期间电力供应
  • Zongo II HPP in Congo-Kinshasa Holding Completion Ceremony
  • DRC: SinoHydro has finally completed the Zongo 2 hydroelectric dam
  • La Chine et la RDC signe un accord de prêts pour le financement du projet de la centrale hydroélectrique Zongo II
  • Lancement des travaux de construction du barrage hydro-électrique Zongo II en RDC
  • Global Energy Observatory
  • Zongo II
  • 中国进出口银行向刚果金提供3.6亿美金贷款
  • Congolese conjunctures 2015 Between political uncertainties and economic transformation
  • ChinaLoansToAfrica©SAIS-CARI.csv
  • 中刚签署宗果水电站二期项目贷款协议
  • RAPPORT ANNUEL 2012
  • When Chinese development finance met the IMF's public debt norm in DR Congo, 5 ans au service de la reconstruction et de la modernisation: Projet de cooperation Sino-Congolais
  • Chinese-Financed Hydropower Projects in Sub-Saharan Africa
  • BULLETIN TRIMESTRIEL DE LA DETTE PUBLIQUE QUATRIEME TRIMESTRE 2021
  • BULLETIN TRIMESTRIEL DE LA DETTE PUBLIQUE PREMIER TRIMESTRE 2022
  • The main engineering equipment and materials of the 220kV transmission line of the Zongo II project of the Democratic Republic of the Congo (Kinshasa) successfully completed the domestic factory acceptance
  • Rapport Annuel de Gestion de la Dette Publique 2021
  • Fourth Trimester 2022 Public Debt Bulletin, 2021 Annual Report Public Debt Addendum
  • Trimestral Public Debt Bulletin First Trimester 2023
  • Power plant profile: Zongo II
  • Democratic Republic of the Congo
  • HYDROPOWER IN AFRICA: AFRICA DAMS BRIEFING
  • DRC: Chinese-built hydroelectric power plant Illuminates Kinshasa
  • Quarterly Public Debt Report Fourth Quarter 2024
  • RAPPORT ANNUEL DE GESTION DE LA DETTE PUBLIQUE 2023 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Democratic Republic of Congo

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant