Bank of China provides $44.9 million buyer's credit loan tranche (Tranche A) for 80MW Kozjak Hydropower Plant Construction Project (Linked to Record ID#42247, #85157, and #85158)

$44.98M USD

Funder Bank of China (BOC)
Recipient Organization JSC Macedonian Power Plants (ELEM)
Country North Macedonia
Start Date Jul 09, 2002
End Date Sep 29, 2026
Duration 8,848 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 42251
Grant Description

Bank of China provides $44.9 million buyer's credit loan tranche (Tranche A) for 80MW Kozjak Hydropower Plant Construction Project On July 9, 2002, Bank of China and JSC Macedonian Power Plants (ELEM) — a state-owned electricity company in Macedonia that is also known as AD Elektrani na Makedonia — signed an $89,964,628.88 buyer’s credit loan agreement for the 80MW Kozjak Hydropower Plant Construction Project.

📋 Loan / Grant Terms
💰 Loan Amounthad two separate tranches: a $44
📅 Maturity15 years
⏳ Grace Period7.5 years
💹 Interest Rate7.49%

The Government of the Republic of Macedonia issued a sovereign guarantee in support of this loan. Tranche A and Tranche B are captured in Record ID#42251 and Record ID#85157, respectively.

📋 Loan / Grant Terms
💰 Loan Amountagreement (captured in Record ID#85158) that carried the following terms: a 15-year maturity
📅 Maturity15 years
💹 Interest Rate7.8%

The Government of the Republic of Macedonia issued a sovereign guarantee in support of this supplier credit.

The purpose of this project was to construct an 80MW hydroelectric power plant on the Treska river, 25 kilometers from the capital of Skopje. Hainan S.I.T.

Enterprise (Хаинан С.И.Т. Ентерпраис Корп) was originally designated as the contractor responsible for implementation during the mid-1990s. However, it underperformed and ultimately went bankrupt. Then, in 2002, Hainan S.I.T.

Enterprise was replaced with China International Water & Electric Corporation (CWE), which began construction on November 2, 2002 and ended construction on July 1, 2004. The plant was put into operation after a trial period on September 12, 2004. The final completion certificate was issued on May 10, 2006.

CWE's contract closing ceremony was held on November 27, 2009, the same day that full operational capacity was finally achieved. By August 2010, the power generation capacity of the plant had reached 190 million kWh. Due to Hainan S.I.T.

Enterprise’s inactivity, ELEM suffered $2.8 million of financial losses, which were covered by Sinosure indemnity payments (see Record ID#42247).

📋 Staff Comments
  1. The Chinese project title is 科佳水电站合 or 马其顿科佳水电站目. The Macedonian project title is проектот ХЕЦ Козјак.
  2. JSC Macedonian Power Plants (ELEM) was renamed as Elektrani na Severna Makedonija (ESM) in 2019.
  3. The loan agreements that ELEM signed in July 2002 effectively amended loan agreements that it had previously signed with Bank of China and Hainan in 1998.
📚 Sources & References
  • Macedonia's 80 MW Kozjak Power Plant Goes on Stream at Full Operational Capacity- Media
  • Hydroelectric Power Plants in Macedonia
  • China-built hydropower plant in Macedonia under full swing
  • Power Generation Capacity of Kozjak Hydropower Station Reaches New Height
  • Ambassador Wen Zhenshun inspects Kozjak hydropower station
  • 科佳水电站第一批设备运抵施工现场
  • 马其顿科佳水电站工程
  • 我在马其顿承包的科佳水电站项目重新启动
  • 马其顿科佳水电站
  • Macedonia's 80 MW Kozjak Power Plant Goes on Stream at Full Operational Capacity- Media
  • On Amendments and Modifications to the Law on Guarantee by the Republic of Macedonia under the Loan Agreements for the Project HPP “Kozjak” with the Bank of China and CWE Company
  • 马其顿科佳水电站合同关闭仪式成功举行, 【中国三峡工程报】马其顿科佳水电站发电量创新高
  • 公司马其顿科佳水电站项目获得最终竣工证书
  • Power Generation Capacity of Kozjak Hydropower Station Reaches New Height
  • Zakon za garancija Kozjak Kina izmena
  • ELEM-AR09-MKD-FINAL-ZA-WEB-1-1
  • Godisen-Izvestaj-2008_MK-1, СОБРАНИЕ НА РЕПУБЛИКА МАКЕДОНИЈА, 1-Закон за слободен пристап до информации од јавен карактер, 13-2006
  • Ambassador Dong Chunfeng attended the closing ceremony of Kozjak power plant contract
  • REPUBLIC OF MACEDONIA MINISTRY OF FINANCE
  • Annual-Report_-2007-1
  • Annual-Report_2008_ANG-1, ЗАКОН ЗА ГАРАНЦИЈА НА РЕПУБЛИКА МАКЕДОНИЈА ПО ДОГОВОРИТЕ ЗА ЗАЕМИ ПО ПРОЕКТОТ ХЕЦ „КОЗЈАК“ СО КИНЕСКАТА БАНКА И ФИРМАТА CWE (CHINA INTERNATIONAL WATER&ELECTRIC CORP)
  • Microsoft Word - 2E237E6795A6A549B7A07BE260BBF362.doc
  • HES TRESKA, СЛУЖБЕН ВЕСНИК НА РЕПУБЛИКА МАКЕДОНИЈА, ЗАКОН ЗА ГАРАНЦИЈА НА РЕПУБЛИКА МАКЕДОНИЈА ПО ДОГОВОРИТЕ ЗА ЗАЕМИ ПО ПРОЕКТОТ ХЕЦ КОЗЈАК СО КИНЕСКАТА БАНКА И ФИРМАТА ХАИНАН С.И.Т. ЕНТЕРПРАИС КОРП., 5 СЕДНИЦА НА СОБРАНИЕТО НА РЕПУБЛИКА МАКЕДОНИЈА, 946D62A06AD24F96AC0DF85A7185A659, ЕЛЕМ: СДСМ манипулира со фактите за ХЕ Козјак
  • 马其顿科佳水电站工程
  • Power Generation Capacity of Kozjak Hydropower Station Reaches New Height
  • Macedonia's 80 MW Kozjak Power Plant Goes on Stream at Full Operational Capacity- Media
  • China-built hydropower plant in Macedonia under full swing
  • Macedonian ESM Deliberately Delays Agreement for Chinese-Funded Power Plant
  • Macedonia
  • China To Agree on Completion of 172.5 Mln Euro Hydropower Plant
  • Ambassador Wen Zhenshun inspects Kozjak hydropower station
  • 中国银行出口买方卖方信贷业务的特点和优势 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

JSC Macedonian Power Plants (ELEM)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant