Loading…

Loading grant details…

Completed Mixed AidData Chinese Aid

China Construction Bank contributes $42.484 million to $84.9 million syndicated buyer’s credit loan for Supply of Passenger Cars for Line A of Subway of the City of Buenos Aires (First and Second Complementary Contracts) (Linked to Record ID#91149, #54754, #88199, and #91148)

$42.48M USD

Funder China Construction Bank Corporation (CCB)
Recipient Organization Argentina Ministry of Economy
Country Argentina
Start Date Jan 27, 2010
End Date Oct 16, 2033
Duration 8,663 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 41096
Grant Description

China Construction Bank and China CITIC Bank contributions to 2010 USD 84.9 million syndicated buyer’s credit loan for Supply of 279 Passenger Cars for Line A of Subway of the City of Buenos Aires On November 5, 2008, Argentina's Secretary of Transport of the Federal Planning Ministry, Public Investment Services, and China CITIC International Cooperation Corporation Limited (CITICICC) signed a framework agreement for the supply of 279 passenger cars for the subway (underground) network of Buenos Aires.

On the same day, Argentina’s Secretary of Transport of the Federal Planning Ministry, Public Investment and Services, and CITICICC signed the First Complementary Contract for the supply of 45 Passenger Cars for Line “A” of the Subway (Underground) Network of Buenos Aires and the Second Complementary Contract for the supply of 40 cars of passengers for Line “A” of the Subway (Underground) Network of Buenos Aires.

On July 13, 2010, the Third Complementary Contract for Line “A” of the Subway (Underground) Network of Buenos Aires was signed for the supply of 65 passenger cars.

On January 27, 2010, CITIC Bank and China Construction Bank (CCB) signed a $84,968,550 syndicated buyer’s credit loan with Argentina’s Ministry of Economy and Public Finance to supply cars to Line A of the Subway Network of Buenos Aires.

📋 Loan / Grant Terms
💰 Loan Amountcarried the following borrowing terms: an interest rate of LIBOR plus a 3
📅 Maturity10 years

Sinosure provided export buyer’s credit insurance for the loan. The proceeds of the loan were to be used by the borrower to finance the First and Second Complementary Contracts. CITIC Bank and CCB each contributed $42,484,275 to the syndicated buyer’s credit loan. CITIC Bank's contribution is captured via Record ID#91149, while CCB's contribution is captured via Record ID#41096.

The loan's (principal) amount outstanding was $25,490,565 as of December 31, 2010, $37,763,800 as of December 31, 2011, $73,639,410 as of December 31, 2012, $78,899,367.86 as of December 31, 2013, $66,761,003.58 as of December 31, 2014, $46,429,243.40 as of December 31, 2015, $30,345,910.74 as of December 31, 2017, $18,207,546.46 as of December 31, 2018, $6,069,182.18 as of December 31, 2019, and $0 as of December 31, 2020.

The proceeds from another ($200,687,550) syndicated loan (from CITIC Bank, ICBC Asia, CMB Wing Lung Bank) were to be used by Argentina’s Ministry of Economy and Public Finance to finance the Second Complementary Contract and the Third Complementary Contract (as captured via Record ID#54754).

📋 Loan / Grant Terms
💰 Loan Amountcarried the following borrowing terms: an interest rate of LIBOR plus a 3

Sinosure provided buyer’s credit insurance. CITIC Bank, ICBC Asia and Wing Lung Bank each contributed $66,895,850 to that loan.

CITIC Bank's contribution is captured via Record ID#54754, while ICBC Asia's contribution is captured via Record ID#88199 and CMB Wing Lung Bank's contribution is captured via Record ID#91148. On January 12, 2013, the passenger cars were put into operation on the Bueno Aires subway network.

📋 Staff Comments
  1. The loan contract can be accessed in its entirety via https://www.dropbox.com/s/wb1bl45eahfh713/China%20CITIC%20Bank%20and%20China%20Construction%20Bank%20loan%20to%20Argentina%202010.pdf? and https://docs.aiddata.org/ad4/pdfs/how_china_lends/ARG_2010_474.pdf2. The China-Latin America Commercial Loans Tracker, which is produced by the Inter-American Dialogue, does not capture the syndicated loan that supported this project.
  2. The Chinese project title is 中信建设出口布宜诺斯艾利斯市地铁A线车辆项目. The Spanish project title is La adquisición de material rodante para las líneas de subterráneos de la Ciudad Autónoma de Buenos Aires.
  3. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  4. The Government of Argentina’s Sistema de Análisis y Control de la Deuda (SIGADE) loan identification number is 27641000.
📚 Sources & References
  • - Query Re- Chinese Loans to Argentina, 2016 Memo From the Argentine Ministry of Finance, 70% of the main construction for the Ituango hydroelectric project is now complete
  • Argentine gov't approves purchase of Chinese subway trains
  • Buenos Aires Line A cars enter service
  • Buenos Aires Metro to Buy Chinese Subway Cars for US$650M
  • Buenos Aires Underground rolling stock
  • China funds Argentina's rail revival
  • China on the Ground in Latin America: Challenges for the Chinese and Impacts on the Region
  • China splashes billions on Argentine rail, subway
  • China-Latin America Finance Database
  • China’s CITIC supplies new carriages for ageing Buenos Aires subway
  • CUENTA DE INVERSIÓN 2010 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2011 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2012 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2013 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2014 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2015 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2016 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2018 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2019 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2021 SEPARATA DE DEUDA PÚBLICA
  • Decree 118/2010
  • El Gobierno ratificó los convenios con China para adquirir 279 coches para subtes
  • ESTADO DE LA DEUDA PÚBLICA DE LA ADMINISTRACIÓN CENTRAL ACUMULADO DESDE EL 01/01/18 AL 31/12/18
  • ESTADO DE LA DEUDA PÚBLICA DEL SECTOR PÚBLICO ACUMULADO DESDE EL 01/01/16 AL 31/12/16
  • INFORME FINAL DE AUDITORÍA
  • January 11th, 2013 is a day of special meanings for the residents of Buenos Aires
  • Parlamentaria Mixta Revisora de Cuentas 2021
  • Presentaron nuevos trenes del Subte porteño en la China International Rail Transit Exhibition
  • South America’s metro pioneer looks to the future
  • Subterraneos de Buenos Aires Sociedad del Estado
  • Term Loan Facility Agreement, “Made in China” appears in Argentina oldest subway
  • 中信银行总行营业部牵头为阿根廷首都地铁车辆项目提供8500万美元买方信贷支持
  • 中信银行总行营业部牵头为阿根廷首都地铁车辆项目提供8500万美元买方信贷支持
  • 接手阿根廷出口信贷中信银行掘金南美 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Argentina Ministry of Economy

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant