Completed Mixed AidData Chinese Aid

China Eximbank provides $50.54 million preferential buyer’s credit for Third Stage (Chormagzak Tunnel) of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project (Linked to Record ID #53750, #40063

$50.54M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Tajikistan Ministry of Finance
Country Tajikistan
Start Date Jun 05, 2012
End Date Feb 04, 2032
Duration 7,183 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 40440
Grant Description

China Eximbank provides $50.54 million preferential buyer’s credit for Third Stage (Chormagzak Tunnel) of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project On June 5, 2012, the Export-Import Bank of China (China Eximbank) and the Ministry of Finance of the Republic of Tajikistan signed a $50,540,000 preferential buyer's credit (PBC) agreement [CHINA EXIMBANK PBC NO. 2012 (5) TOTAL NO. (193)] for the Third Stage (Chormagzak Tunnel) of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project.

The China Eximbank PBC (loan) agreement was unanimously ratified by the Tajik Parliament in October 2012.

📋 Loan / Grant Terms
💰 Loan Amountcarried a maturity of 19

The borrower was expected to use the loan proceeds to finance 95% of the cost of a $$53,200,000 commercial contract between Tajikistan's Ministry of Transport and China Road and Bridge Corporation (CRBC), which was signed on December 7, 2011. The remaining 5% of the commercial contract cost was to be covered by the Government of Tajikistan.

The project supported the construction of the 4.43 km Chormagzak Tunnel along the 147.64 km Dushanbe-Dangara section of the Dushanbe-Kulma highway (which is also known as the Tajikistan-China highway). China Road and Bridge Corporation (CRBC) was the contractor responsible for project implementation.

Construction began on October 15, 2010, and the project was completed on October 1, 2013.

📋 Staff Comments
  1. The Chormagzak Tunnel is now known as the Khatlon Tunnel.
  2. This project is linked to the China Eximbank-financed First Stage and China Eximbank-financed Second Stage of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project (see Record ID#40063, #53750). China Eximbank reportedly provided $243.4 million of debt financing in total for all three stages of Phase 1.
  3. The Russian project title for Stage 3 of Phase 1 is Реабилитация третьего этапа фазы I автомобильной дороги «Душанбе-Кульма». The Chinese project title is 塔中公路一期(杜尚别—丹卡拉段)道路修复改造项目.
  4. The China Eximbank PBC (loan) agreement can be accessed in its entirety via http://portali-huquqi.tj/publicadliya/view_qonunhoview.php?showdetail=&asosi_id=13962 and https://www.dropbox.com/scl/fi/bny36nlsb4miqbucamdyy/Tajikistan-2012-China-Eximbank-PBC-for-Third-Stage-Chormagzak-Tunnel-of-Phase-1-of-the-Dushanbe-Dangara-Road-Reconstruction-Project-Russian.pdf?rlkey=7od8u7se8nuutcdkica52wpt1&dl=0 and https://www.dropbox.com/scl/fi/bdtxzjfykl4fsi5we8kq5/Tajikistan-2012-China-Eximbank-PBC-for-Third-Stage-Chormagzak-Tunnel-of-Phase-1-of-the-Dushanbe-Dangara-Road-Reconstruction-Project-English.pdf?rlkey=d2vwr0o2l08udzs3e6pevs6gq&dl=05. The loan's maturity (19.6-years) and grace period (8.6-years) are drawn from the World Bank's International Debt Statistics. See https://www.dropbox.com/scl/fi/xcffgcc5mm4hg49i9u7di/February-2025-IDS-Extraction-Tajikistan-s-Official-Sector-PRC-Borrowings-and-Borrowing-Terms.xlsx?rlkey=cq2kfom6b7ajq6njzram1q1sa&dl=0
📚 Sources & References
  • 'Eximbank' to Provide Over $ 50 million for Continuing Reconstruction of Dushanbe-Kulma Road
  • ADB DEVELOPMENT COORDINATION
  • China to provide $188 for infrastructure projects in Tajikistan
  • China's Exim Bank to lend Tajikistan $50 mln to upgrade road to border
  • Chinese Eximbank to allocate more than $50mln preferential credit to Tajikistan
  • Construction of Chormaghzak tunnel expected to officially commence today
  • CRBC granted contract of rehabilitation road linking Dushanbe and Uzbek border
  • Data Collection Survey On a Road Between Dushanbe and Kurgan-Tyube in the Republic of Tajikistan Final Report
  • DEVELOPMENT COORDINATION
  • Dushanbe-Kulma highway rehabilitation reconstruction project (Tajikistan-China border) in Dushanbe-Dangara section
  • Emomali Rahmon received Vice-President of 'EximBank' China
  • Eximbank of China to provide over $50 million loan to Tajikistan for reconstruction of road
  • Following Up
  • Investment Opportunities in Tajikistan
  • List of Chinese Government-Financed Projects in Tajikistan from the Ministry of Finance via the IMF May 2018
  • Meeting with the First Vice President of Export-Import Bank of the People’s Republic of China Zhu Hongjie
  • Preferential Credit Agreement between the Government of the Republic of Tajikistan and the Export-Import Bank of the People's Republic of China
  • President of Tajikistan Attends the Inaugural ceremony of the Chormaghzak Tunnel
  • Road Projects in Tajikistan Impact Its Strategic Geography
  • Tajikistan 2012 China Eximbank PBC for Third Stage (Chormagzak Tunnel) of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project English
  • Tajikistan 2012 China Eximbank PBC for Third Stage (Chormagzak Tunnel) of Phase 1 of the Dushanbe-Dangara Road Reconstruction Project Russian
  • Tajikistan gets Chinese loan for road reconstruction
  • Tajikistan negotiates financing of tunnel construction with China’s bank
  • Tajikistan Policy Notes on Public Expenditures
  • THE GOVERNMENT MEDIUM - TERM EXPENDITURE FRAMEWORK FOR 2011- 2013
  • Tunnel 'Khatlon' will be closed again, О проекте Льготного кредитного соглашения между Правительством Республики Таджикистан и Экспортноимпортным банком Китайской Народной Республики по реабилитации третьего этапа первой фазы автомобильной дороги Душанбе-Кульма, участок Душанбе-Дангара, Отчет о состоянии государственного долга на 2015 год, Парламент Таджикистана ратифицировал два кредитных соглашения с Китаем и Францией Подробнее, Постановление Правительства Республики Таджикистан от 30 мая 2012 года, № 252 'О проекте Льготного кредитного соглашения между Правительством Республики Таджикистан и Экспортно-импортным банком Китайской Народной Республики по реабилитации третьего этапа первой фазы автомобильной дороги Душанбе-Кульма, участок Душанбе-Дангара', Пресс-релизы : Китайский Эксимбанк выделит Таджикистану свыше 50 млн. долларов льготного кредита., Реабилитация автодороги Душанбе-Кульма, участок Душанбе-Дангара, фаза 1, 2, 3, со строительством тоннеля Чормагзак, Участие в церемонии открытия туннеля Чормагзак
  • 中国驻塔吉克斯坦大使向正在施工之中的建设者祝贺新年
  • 塔吉克斯坦 (2019年版) Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Tajikistan Ministry of Finance

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant