Completed Mixed AidData Chinese Aid

Bank of China provides $371.5 million buyer’s credit loan for 700MW Tanjung Awar-Awar Power Plant Construction Project

$371.51M USD

Funder Bank of China (BOC)
Recipient Organization PT Perusahaan Listrik Negara (Persero) (PLN)
Country Indonesia
Start Date Dec 14, 2009
End Date Mar 03, 2032
Duration 8,115 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 38611
Grant Description

Bank of China provides $371.5 million buyer’s credit loan for 700MW Tanjung Awar-Awar Power Plant Construction Project On December 14, 2009, Bank of China (BOC) and Perusahaan Listrik Negara (PLN) — an Indonesian state electricity distribution company — signed a $371,509,145 buyer’s credit loan agreement for the 700MW Tanjung Awar-Awar Power Plant Construction Project.

📋 Loan / Grant Terms
💰 Loan Amountcarried the following terms: a 13-year maturity
📅 Maturity13 years
⏳ Grace Period3 years

The loan’s final maturity date is in December 2022. The borrower also purchased buyer’s credit insurance from Sinosure.

The proceeds of the loan were to be used by the borrower to partially finance the $588 million cost of an EPC contract between PLN and a consortium consisting of China National Machinery Equipment Corp. (Sinomach), China National Electric Equipment Corp. (CNEEC), and a local company, PT Penta Adi Samudra, which was signed on April 25, 2008.

Bank Negara Indonesia and Bank Rakyat Indonesia also issued loans worth $101.92 million in support of the project.

The purpose of the project was to install a 700-megawatt (MW) coal-fired power plant — with two 350MW generators (Unit 1 and Unit 2) that are directly cooled by seawater — in Wadung Village, Jenu District, Tuban Regency, and East Java Province (locational coordinates: -6.8105242, 111.9955033).

Unit 1 began implementation in December 2009 and opened in December 2012 and Unit 2 commenced operations in October 2013. The project achieved its commercial operations date (COD) in February 2014. The project owner (PLN) issued a Takeover Certificate (TOC) for Unit 2 on September 22, 2016.

📋 Staff Comments
  1. This project is also known as PLTU 3 Jatim Tanjung Awar-Awar 2×350MW Coal-Fired Steam Power Plant Project. The Chinese project title is 印尼阿瓦阿瓦电站项目 or 印度尼西亚AWAR AWAR 2X350MW 电站.
  2. This project is part of the fast-track program by Indonesian government to add power plants around the country, which total to about 10000 MW.
  3. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
📚 Sources & References
  • PLN secures Chinese loans for power plants program after Merpati spat solved
  • Conditionality in Chinese bilateral lending
  • Power Loans Tied Up Over Merpati
  • PLN secures part of the loans needed for 10,000 MW program
  • Govt to deal with China loan problems of Merpati and PLN
  • RI resolves rifts with China, mends ties
  • PLN to secure $761m in loans from Chinese banks in June
  • Funding Spat Puts the Brakes On Fast-Track Power Project
  • PLN Hopes to Secure ‘Fast-Track’ Funds From China Despite Financing Freeze
  • PLN to Borrow $761m From China for Fast-Track Program
  • PLN secures final financing needed for first 10,000 MW power plant crash program
  • Indonesia: Chinese financing in PLN's 'fast-track' program
  • PLN signs $888m power contracts with Chinese firms
  • Tanjung Awar-Awar power station
  • PLN secures $371 million loans from Chinese bank
  • 中交集团签订印尼TJ.AWAR-AWAR电站码头总承包合同
  • 中国银行将向印尼发电项目提供3.715亿美元贷款
  • PLN Teken Sisa Pinjaman 10 Ribu MW
  • PLTU Tanjung Awar Raih Dana US$371 Juta
  • Quantifying Chinese Public Financing for Foreign Coal Power Plants
  • Indonesian National Power Company won 370 million US dollars loan from Bank of China, 2011 Bond Prospectus
  • 印尼AWAR-AWAR 2X350MW燃煤电站
  • 中交集团签订印尼TJ.AWAR-AWAR电站码头总承包合同
  • Tanjung Awar-Awar power station
  • EPC Contract of AWAR-AWAR 2×350MW Coal Fired Power Plant Signed Successfully
  • AWAR-AWAR 2X350MW Thermopower Plant
  • Indonesia
  • Unit 2 of CNEEC Awar-Awar Project in Indonesia Gets TOC!
  • MODIFIKASI OUTLET COALBUNKER DAN OUTLET COAL FEEDER UNTUK MENGATASI PLUGGING BATUBARA DI PLTU TANJUNG AWAR-AWAR TUBAN, 2017 Government of Indonesia Bond Prospectus
  • 印尼国家电力公司获中国银行3.7亿美元贷款
  • Supplementary Online Material: List of projects to which China has provided public financing (2007-2013)
  • Annual report 2014 PLN
  • Tanjung Awar-Awar power plant
  • East Java
  • Indonesia
  • Hundreds of Residents Block Tuban PLTU Project
  • Demand PJB Manager be Dismissed
  • Residents of 5 Villages Demonstrate Against Tanjung Awar-Awar Tuban PLTU Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

PT Perusahaan Listrik Negara (Persero) (PLN)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant