Grant Description
China Eximbank provides $481 million buyer’s credit loan for 3x350MW Pelabuhan Ratu Power Station Project On May 4, 2009, China Eximbank and Perusahaan Listrik Negara (PLN) — an Indonesian state electricity distribution company — signed a $481,937,182 buyer’s credit loan agreement for the Pelabuhan Ratu Power Station Project.
📋 Loan / Grant Terms
💰 Loan Amountcarried the following borrowing terms: a 15-year maturity
📅 Maturity15 years
⏳ Grace Period3 years
The proceeds of the loan were to be used by the borrower to finance 85% of the cost of an EPC contract between PLN and Shanghai Electric Group, which was signed on August 7, 2007. As of 2016, the borrower had repaid 45,215 million IDR of the China Eximbank loan.
The purpose of the project was to construct a power plant — with three 350MW power generation units — in Citarik village within Pelabuhan Ratu District, Sukabumi Regency, and West Java Province (exact locational coordinate: -7.0242, 106.5464). Shanghai Electric Group was the EPC contractor responsible for implementation.
A formal groundbreaking ceremony took place on September 10, 2007. The first power generation unit was put into operation on June 20, 2013. Then, on May 9, 2013, the second power generation unit was connected to the grid. All three power generation units also completed a 30-day reliability test operation by the end of 2013.
The amount of pollutants the power station emits has led to it being marked for early retirement as part of the Just Energy Transition Partnership (JETP) plan.
📋 Staff Comments
📚 Sources & References
- PLN secures Chinese loans for power plants program after Merpati spat solved
- Conditionality in Chinese bilateral lending
- Power Loans Tied Up Over Merpati
- PLN secures part of the loans needed for 10,000 MW program
- Govt to deal with China loan problems of Merpati and PLN
- RI resolves rifts with China, mends ties
- PLN to secure $761m in loans from Chinese banks in June
- Funding Spat Puts the Brakes On Fast-Track Power Project
- PLN Hopes to Secure ‘Fast-Track’ Funds From China Despite Financing Freeze
- PLN to Borrow $761m From China for Fast-Track Program
- PLN secures final financing needed for first 10,000 MW power plant crash program
- Indonesia: Chinese financing in PLN's 'fast-track' program
- 中国金融机构向印尼提供10.6亿美元电站项目贷款
- Chinese firms produce power for Indonesia
- RI
- China sign Rp 35t deals on energy, mining
- Oil and Gas in China: The New Energy Superpower's Relations with Its Region
- Chinese poised to dominate RI power sector
- Pelabuhan Ratu power station
- 印尼公主港(Pelabuhan Ratu)3×350MW燃煤电站项目
- BERITA RINGKAS PERUSAHAAN Mei 2009
- Oil and Gas in China: The New Energy Superpower's Relations with Its Region
- Quantifying Chinese Public Financing for Foreign Coal Power Plants
- PLN Signs Contracts For Power Plant Projects with China
- Indonesia: Energy Rich and Electricity Poor
- LAPORAN KEUANGAN, 2011 Bond Prospectus
- BU_PITCH_ENGLISH_2018.xlsx
- 上海电气海外电站项目顺利投运
- PLN secures Chinese loans for power plants program after Merpati spat solved This article was published in thejakartapost.com with the title 'PLN secures Chinese loans for power plants program after Merpati spat solved'. Click to read: https://www.thejakartapost.com/news/2009/05/05/pln-secures-chinese-loans-power-plants-program-after-merpati-spat-solved.html. Download The Jakarta Post app for easier and faster news access: Android: http://bit.ly/tjp-android iOS: http://bit.ly/tjp-ios
- Pelapuhan Ratu Power Plant
- Pelabuhan Ratu Coal-fired Power Station Project in Indonesia
- History of Edits for Pelabuhan Ratu Coal Power Plant Indonesia
- Indonesia and China signed deals Monday covering cooperation on eight energy and mining projects worth a total of around Rp 35 trillion
- Shanghai Electric Power Generation Group
- 中国电建承建印尼公主港项目2号机组一次并网成功
- 印尼公主港项目1号机组顺利通过可靠性试验
- 海外项目浅谈(印尼公主港工程交流)
- 上海电气位列创新价值榜第39
- 公司考察印尼拉布湾燃煤电站
- Pelabuhan Ratu power station
- 上海电气电站集团
- 上海国资 第187期
- PLTU Palabuhan Ratu Hadir
- Listrik Tak Lagi Byar Pet
- PLTU Pelabuhan Ratu Dibangun
- Baru Dioperasikan
- PLTU Pelabuhan Ratu Sudah Alami Kerusakan, 2017 Government of Indonesia Bond Prospectus
- Health and economic benefits from early phase out of Indonesia's first JETP coal power plants Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.