Completed Mixed AidData Chinese Aid

China Eximbank provides $405.8 million preferential buyer’s credit for Multi Lane Road Tunnel under River Karnaphuli Project (Linked to Record ID#52873 and #55046) [BRI]

¥405.8M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Bangladesh
Country Bangladesh
Start Date Nov 14, 2016
End Date Nov 13, 2027
Duration 4,016 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 38342
Grant Description

China Eximbank provides $405.8 million preferential buyer’s credit for Multi Lane Road Tunnel under River Karnaphuli Project On June 9, 2014, the Prime Minister of Bangladesh, Sheikh Hasina, visited China and the Chinese Government and the Government of Bangladesh signed a memorandum of understanding (MOU) on the Multi-Lane Road Tunnel under River Karnaphuli Project.

Then, on November 14, 2016, China Eximbank and the Government of Bangladesh signed an RMB 1,950,000,000 government concessional loan (GCL) agreement and a $405.8 million preferential buyer’s credit (PBC) agreement for the Multi-Lane Road Tunnel under River Karnaphuli Project.

📋 Loan / Grant Terms
📅 Maturity20 years
💹 Interest Rate2%
📋 Loan / Grant Terms
📅 Maturity20 years
💹 Interest Rate2%

Record ID#55046 captures the GCL, while Record ID#38342 captures the PBC.

The borrower was expected to use the proceeds of the GCL and the PBC to finance a commercial contract between the Government of Bangladesh’s Ministry of Road Transport and Bridges and China Communication Construction Company (CCCC), which was signed in June 2015.

The GCL had disbursed RMB 936,1890,000 as of June 30, 2018, RMB 1,557,869,000 as of June 30, 2019, RMB 1,950,000,000 as of June 30, 2020, RMB 1,950,000,000 as of June 30, 2021, RMB 1,950,000,000 as of June 30, 2022, and RMB 1,950,000,000 as of June 30, 2023. No repayments on the GCL had been made as of June 30, 2019, June 30, 2020, June 30, 2021, and June 30, 2022.

The borrower made principal repayments worth RMB 65 million between July 1, 2022 and June 30, 2023.

The PBC had disbursed $165.559 million as of June 30, 2021, $280.439 million as of June 30, 2022, and $374.271 million as of June 30, 2023. No repayments on the PBC had been made as of June 30, 2021 or June 30, 2022. The borrower made principal repayments worth $13.527 million between July 1, 2022 and June 30, 2023.

The purpose of the project, which is also known as the Multilane Karnaphuli Tunnel Project, is to construct a 3.4-kilometer-long, 10 meter-wide tunnel under the Karnaphuli River near the Port of Chittagong.

The total length of the proposed tunnel will be around 9.092 kilometers, including a 3.4-kilometer tunnel under the Karnaphuli River with an approach road of 4.89 kilometers alongside 740 meters of bridges linking the main port city, and western side of the Karnaphuli along with the eastern side of the river.

The tunnel will connect the port of Chittagong to the industrial area of the city and thereby relieve pressure on the three existing bridges.

Upon completion, the underwater tunnel is expected to reduce the time it takes to drive from Hittagong Shah Amanat International Airport to the Hittagong industrial park from four hours to 20 minutes. The total area of the project site is 382.03 acres. More than 360.64 acres of land were acquired for the construction of roads and installments of utility lines.

A total of 2,275 families are affected by this project, and 1,660 were given compensation. China Communication Construction Company (CCCC) is the general (EPC) contractor responsible for project implementation.

On November 24, 2015, the Executive Committee of the National Economic Council (Ecnec) approved the Multi-Lane Road Tunnel under River Karnaphuli Project. Construction began on February 24, 2017.

Two years later, the Prime Minister of Bangladesh officially inaugurated boring works on the tunnel on February 24, 2019.

The project had achieved a 40% physical completion rate by May 2019, including the installation of over 150 meters of the first tunnel and much of the above-ground works.

Then, on July 31, 2020, the project reached a key milestone with the completion of the first underwater, after a made-in-China super-diameter slurry-pressure-balance tunnel boring machine (TBM) broke through at the Karnaphuli River east bank working shaft.

The TBM, which is 94 meters long and weighs more than 2,200 tons, was developed by the Tianhe Mechanical Equipment Manufacturing Co. It was the first super-diameter slurry-pressure-balance TBM to be self-developed and exported by China. The TBM uses several self-developed technologies, such as an automatic mud water circulation system.

As of October 2021, all boring-related work was completed — after the excavation of the second tube (from Anwara end of Chittagong to Patenga end) of the 3.315-km tunnel) — and the project had achieved a 73% physical completion rate. By November 2021, the project had achieved a 77.5% physical completion rate.

On May 8, 2022, Harunur Rashid Chowdhury, Project Director of Karnaphuli Multilane Road Tunnel, sent a letter to the Bangladesh Bridge Authority (BBA).

In it, he noted that Shanghai Port had remained closed since March 2022 due to Covid-19 and the Chinese Government’s zero-tolerance policy had affected project’s progress: ‘It may be noted that […] most of the goods and equipment are being manufactured/procured from Shanghai.

Therefore, the closure of the Shanghai Port is causing a delay in shipments. […] The goods and equipment planned to arrive in March [2022] are still not able to reach Chittagong Port to date.

Subsequent shipments will also get affected on this account.’ In the letter, Harunur Rashid Chowdhury also asked the BBA to take up the issue with the Economic Relations Division (ERD) and arrange an extension of the China Eximbank loan availability period by six months until May 6, 2023.

On May 7, 2022, Li Zheng, the CCCC Project Manager of the Karnaphuli Tunnel Project Site Office, acknowledged in a letter to Harunur Rashid Chowdhury that the delay in shipments from Shanghai was the result of China’s ‘Zero Covid’ measures.

Then, in June 2022, BBA announced that two sub-contractors hired CCCC to complete two project components — a management software system for BBA and the service area (east) — had violated their contractual obligations.

According to a letter from Harunur Rashid Chowdhury, Project Director of Karnaphuli Multilane Road Tunnel, to the BBA, ‘CCCC was instructed to undertake this work, but they employed sub-contractors to do so.

CCCC selected these sub-contractors and is responsible for any default of the sub-contractors. […] Unfortunately, CCCC has not effectively monitored or exercised control over both these sub-contractors.’ The Multi-Lane Road Tunnel under River Karnaphuli Project was originally expected to reach completion by the end of 2020.

However, in 2018, the project’s expected completion date was pushed back to December 4, 2022.

The Karnaphuli River Tunnel -- also known as the Bangabandhu Sheikh Mujibur Rahman Tunnel -- was opened to traffic on October 29, 2023.

📋 Staff Comments
  1. This project is a part of the Belt and Road Initiative and one of a series of loans captured via Umbrella Project ID#52873.
  2. Karnaphuli is sometimes also spelled as ‘Karnafuli’.
  3. This project is also known as the Karnaphuli River Tunnel Project and the Karnaphuli Multilane Road Tunnel Project. The Chinese project title is 孟加拉国卡纳普里河底隧道项目.
  4. The Government of Bangladesh’s loan identification number for the GCL is L1120161014C. The Government of Bangladesh’s loan identification number for the PBC is B1120161014A.
📚 Sources & References
  • Joint statement between the People's Republic of China and the People's republic of Bangladesh
  • China-Bangladesh: Strengthening partnership
  • PM flies to China
  • Karnaphuli Tunnel deal with China Tuesday
  • Deal signed with Chinese firm to construct Karnaphuli tunnel
  • Chinese firm to construct tunnel beneath Bangladesh's Karnaphuli river
  • Chinese firm CCCC gets Karnaphuli river tunnel work
  • Development of National Infra Network for Bangladesh Government Phase III
  • Annual Report 2016-17: Commitment for FY 2015-16
  • List of Foreign Aided ongoing Projects: Asia
  • Some inter-governmental projects between China and Bangladesh have not landed in the 2015-2016 fiscal year.
  • China and Bangladesh discuss commercial contracts on ten infrastructure projects
  • Chinese Exim Bank to give US$ 1.16b in loan, ২০১৬-১৭ অর্ ি বছরি স্বাক্ষরিত অনুদান ও ঋণ চুরিি তারিকা
  • China-funded projects difficult to implement in real life
  • Karnaphuli Tunnel
  • 特写:中企发力修建孟加拉国首条河底隧道
  • 中国制造助力孟加拉国首条河底隧道项目中国制造助力孟加拉国首条河底隧道项目
  • China Digs Deep for Bangladesh BRI Multi-Channel Tunnel Project
  • Construction of Karnaphuli tunnel will start in August
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE) Up to 30 June 2017
  • PM opens construction works on Karnaphuli tunnel
  • Ctg expressway
  • Karnaphuli tunnel project running on schedule
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF SUPPLIERS'/BYERS CREDIT (ACTIVE)
  • Draft agreement for loan approved
  • Construction of Multi-Lane Tunnel under river Karnaphuli at Chittagong city
  • Arup – Advising the construction of Bangladesh’s first underwater tunnel
  • Ambassador H.E.Zhang Zuo Attends the Inauguration Ceremony of Karnaphuli Tunnel Boring Operations
  • The Kanapuri River Bottom Tunnel Project will use the largest shield machine exported by China
  • Quader: 24% construction work of Karnaphuli tunnel completed
  • Karnaphuli tunnel boring starts in Oct
  • Contractor starts assembling tunnel boring machine
  • China-funded projects in slow lane on land acquisition delays
  • Chittagong Karnaphuli River Tunnel (Construction)
  • Detailed Commitments by Development Partners
  • BANGLADESH TURNS TOWARDS CHINA
  • 独家丨中企海外项目周报(2022.6.6-2022.6.12)
  • 中企承建孟加拉国河底隧道项目建成首条联络通道
  • 中企承建的孟加拉国河底隧道项目实现双线贯通
  • 孟加拉卡纳普里河底隧道项目实现全部联络通道贯通
  • Milestone on Bangladesh’s first underwater tunnel
  • Karnaphuli tunnel sees 77pc works done
  • Sub-contractors hired by Chinese firm cause delay in Karnaphuli tunnel project
  • China lockdowns delay Karnaphuli tunnel project by 6 months
  • Chinese company's request for extension of Karnaphuli tunnel timeline rejected
  • First underwater tunnel in Bangladesh excavated using China-developed machine
  • Breaking new ground on Bangladesh’s first underwater tunnel
  • Completion of first underwater tunnel for Karnaphuli River Tunnel Project
  • Quader orders work for Bangabandhu Tunnel to be completed soon
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF SUPPLIERS'/BYERS CREDIT (ACTIVE)
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE)
  • Table-7.2 COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE) Up to 30 June 2019
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE)
  • Jointly Building Belt and Road towards SDGs - Bangladesh
  • Bangladesh’s BRI Tunnel Unites Dhaka With Chittagong And Cox’s Bazaar
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE)
  • COMMITMENT
  • DISBURSEMENT AND REPAYMENT OF EXTERNAL (ODA) LOANS (ACTIVE)
  • 中国进出口银行融资支持的孟加拉国卡纳普里河底隧道项目主体工程顺利获得接收证书
  • Chinese-built underwater tunnel in Bangladesh opens to traffic
  • 驻孟加拉国大使姚文应邀出席孟卡纳普里河“国父”隧道通车典礼仪式 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Bangladesh

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant