Completed Mixed AidData Chinese Aid

China Development Bank contributes $355.5 million to $430 million syndicated buyer's credit loan for Phase C of 350 MW Candiota Thermoelectric Power Plant

$355M USD

Funder China Development Bank (CDB)
Recipient Organization Centrais Elétricas Brasileiras S.A. (Eletrobras)
Country Brazil
Start Date Apr 20, 2007
End Date Dec 03, 2030
Duration 8,628 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 36701
Grant Description

China Development Bank contribution to USD 430 million syndicated buyer's credit loan for Phase C of 350 MW Candiota Thermoelectric Power Plant In November 2004, China Development (CDB), Centrais Elétricas Brasileiras S.A. (Eletrobras), and CITIC Group Corporation Ltd. signed a framework agreement for Phase C of the 350 MW Candiota Power Plant.

The agreement was signed in the presence of President of Brazil Luiz Inácio Lula da Silva and Chinese President Hu Jintao.

At the time, the estimated investment into the project was $256 million, with CDB financing 90% and CGTEE covering the remaining 10%.

On August 3, 2006, the Federal Senate of Brazil authorized CGTEE to take on $430 million of external debt, and the loan agreement was to be signed within 270 days of this authorization.

On April 20, 2007, CDB, BNP Paribas S.A., and Companhia de Geração Térmica de Electric Energy (CGTEE) -- a subsidiary of Eletrobras -- signed a $430 million syndicated buyer's credit loan agreement for Phase C of 350 MW Candiota Thermoelectric power plant. CDB contributed $355.5 million to the loan syndicate.

The remainder ($74.5 million) was contributed by BNP Paribas S.A.

The loan was provided in two tranches: a $281 million tranche to finance an export contract and a $149 million tranche to finance a commercial contract.

According to the 2007 Eletrobras Annual Report, the $281 million tranche, which was to be used for the acquisition of equipment and services, carried an interest rate of LIBOR plus a 0.75% margin and a maturity of 15-years, and the $149 million tranche, which was to be used for other project expenses, carried an interest rate of LIBOR plus a 1.30% margin and a maturity of 8-years.

The interest and the principal payments of the loan were to be made semiannually in June and December. The funds from the financing agreement were fully drawn upon by May 2010.

The loan's (principal) amount outstanding was BRL 682.4 million as of December 31, 2014 and BRL 182.6 million as of December 31, 2020. China Export & Credit Insurance Corporation (Sinosure) originally provided buyer's credit insurance for this debt. However, it was replaced as an insurer by CDB itself on May 8, 2008, at the demand of the Chinese Government.

Sinosure's replacement was related to issues regarding the project's contracts and financing, which caused considerable delays. This project sought to construct and install a 350 MW subcritical condensing coal-fired unit in the Candiota plant.

The Candiota plant was located in the Municipality of Candiota, located in the southern half of the state of Rio Grande do Sul, about 400 kilometers from Porto Alegre.

In addition to CITIC Group Corporation Ltd., PowerChina SEPCO1 Electric Power Construction Co., Ltd. (SEPCO1) was a subcontractor responsible for project implementation.

It signed an agreement with CITC to implement the project on August 19, 2006; it was responsible for the engineering design, supply of materials and equipment, construction (under a $331 million engineering, procurement, and construction (EPC) contract), installation, commissioning, testing, and trial operation and repair.

The project's groundbreaking ceremony was held on September 25, 2006. The project was completed on December 29, 2010, after a successful 168-hour long full-load trial run.

The Candiota plant’s Units A and B, which were in operation prior to SEPCO1's implementation the third phase of the project, have experienced serious issues.

In 2016, the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) closed the plant because of its failure to meet pollutant emission control parameters; IBAMA suspended at Units A and B and fined the plant $23 million upon discovering violations in the maximum flow of effluents and the rates of grease and oil.

📋 Staff Comments
  1. This project is also known as the Presidente Médici Candiota Power Station Project. The Chinese project title is 中信国华承建的坎迪奥塔火电厂项目.
  2. Some sources identify CITIC as the financier. This issue warrants further investigation.
  3. AidData relies on an official source (CDB) for the size of CDB's contribution to the syndicate. See https://www.dropbox.com/scl/fi/zl7o7e9cm7r5qkt33g23n/arq1272655441.pdf?rlkey=kd1e2r9n5uy19220fv8syovkp&dl=04. The breakdowns of CDB's contributions to the two loan tranches is unknown. Similarly, AidData has estimated the loan's maturity by taking the midpoint (11.5-years) between 8-years and 15-years. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin (For this record, the margin rate was taken as the midpoint between the margin range). Please see the methodology for additional details.
📚 Sources & References
  • Chineses confirmam investimento em Candiota 3
  • Energia: Grupo chinês CITIC financia central termoélectrica no sul do Brasil
  • CGTEE terá dinheiro chinês para Candiota
  • Eletrobrás
  • China Development Bank e BNP Paribas assinam aditivos contratuais do financiamento de Candiota III (Fase C)
  • Candiota 3 quer mudar a imagem das usinas térmicas a carvão no Brasil
  • Unidades: Candiota
  • Candiota II atrasada três meses
  • Eletrobrás
  • China Development Bank and BNP Paribas sign contractual additions to the Candiota III (Phase C), 《国际商报》:开发性金融助力开放型经济
  • CONDICIONANTES INSTITUCIONAIS À EXECUÇÃO DO INVESTIMENTO EM INFRAESTRUTURA NO BRASIL: O CASO DA UTE CANDIOTA – FASE III
  • Chinese involvement in Brazilian coal power sector causes concern
  • China-Latin America Finance Database
  • China's Overseas Development Finance
  • BU_PITCH_ENGLISH_2019-clean5.xlsx, 2008 - Brazil
  • ACÓRDÃO 1996/2008 - PLENÁRIO
  • Fase C da Usina de Candiota será reformada com dinheiro chinês
  • 中国电建集团深拓巴西市场纪实
  • Presidente Médici Candiota power station
  • Chineses chegam e dão continuidade à s negociações de construção da Fase C de Candiota
  • Chineses retornam para dar continuidade aos trabalhos de construção da Fase C da usina de Candiota
  • Candiota
  • Missão à China garante as relações para construção da Fase C de Candiota
  • 驻巴西使馆临时代办祝青桥出席国家开发银行里约热内卢代表处开业仪式
  • Eletrobras Management Proposal - Restatement
  • ACÓRDÃO 1996/2008 - PLENÁRIO
  • Greening Development Finance in the Americas
  • Formulário de Referência - 2010 - Centrais Eletricas Brasileiras S.A.
  • RESOLUÇÃO Nº 34
  • DE 2006, 2007 Relatório Anual & Demonstrações Contábeis
  • Eletrobrás assina contratos de financiamento para Candiota
  • Supplementary Online Material: List of projects to which China has provided public financing (2007-2013)
  • 巴西坎迪奥塔火力发电厂项目
  • Management Proposal for the 61st Annual Shareholders Meeting to be held on April 27, 2021, 2007 Annual Report and Financial Statements, form 6k march 2016, form 6k march 2017, form 6k, form 6k 2020, form 6k Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Centrais Elétricas Brasileiras S.A. (Eletrobras)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant