Active Mixed AidData Chinese Aid

China Development Bank contributes $1.89 billion to $2.099 billion syndicated buyer’s credit for Belgrano Cargas Railway Line Rehabilitation Project (Linked to Record ID#69134, #59690)

$1.9M USD

Funder China Development Bank (CDB)
Recipient Organization Argentina Ministry of Economy
Country Argentina
Start Date Jun 25, 2012
End Date Oct 26, 2033
Duration 7,793 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 36517
Grant Description

CDB and ICBC contributions to $2.099 billion syndicated loan for Belgrano Cargas Railway Line Rehabilitation Project On June 25, 2012, China Development Bank (CDB) and the Industrial and Commercial Bank of China (ICBC) and Argentina's Ministry of Economy and Public Finance signed a $2,099,965,834 syndicated buyer’s credit facility (loan) agreement for the Belgrano Cargas Railway Line Rehabilitation Project.

CDB contributed $1,899,965.834 to the loan syndicate (captured via Record ID#36517) and ICBC contributed $200,000,000 to the loan syndicate (captured via Record ID#69134).

📋 Loan / Grant Terms
💰 Loan Amountcarries the following borrowing terms: a 15-year maturity
📅 Maturity15 years
⏳ Grace Period4.5 years

As a credit enhancement, the borrower purchased a buyer’s credit insurance policy from Sinosure worth 7.21% of the face value of the loan ($151,407,536.63).

The borrower was expected to use the proceeds of the loan to finance 85% of the cost of a $2,470,548,040 commercial contract between Argentina’s Ministry of the Interior and Transport and China Machinery Engineering Corporation (CMEC), which was signed on March 11, 2010. As of May 2022, the loan had achieved an 88.3% disbursement rate ($1,855,660,000 out of $2,099,965,834).

The loan's (principal) amount outstanding was $504,821,918.39 as of December 31, 2015, $1,230,795,697.28 as of December 31, 2017, $1,478,957,102.66 as of December 31, 2019 and $1,376,381,351.22 as of December 31, 2020.

The purpose of the project is to replace 1593 km of track along the Belgrano Freight Railway, which stretches from Retiro station in the Autonomous City of Buenos Aires through a total of 14 Argentine provinces: Buenos Aires, Santa Fe, Córdoba, San Luis, Mendoza, San Juan, La Rioja, Catamarca, Tucumán, Santiago del Estero, Chaco, Formosa, Salta, and Jujuy.

The rail network even connects with two neighboring countries: one of its branches links with Chile through the Socompa border crossing in Salta province, continuing to the port of Antofagasta on the Pacific. There are two alternative connections with Bolivia, neither of which are currently operating.

The first is through La Quiaca in Jujuy province, the second through Salvador Mazza in Salta province. The project also involves the acquisition of 1000 wagons and 30 locomotives.

This project will be implemented as part of the Argentine government’s Belgrano Plan, which is a set of transportation, infrastructure, production, health, employment, housing, and education policies and programs that target the country's northern provinces. The rail replacement works is scheduled to take place in three phases.

Work on the first phase will cover 535 km and it includes the Santurce-Tostado-Chorotis-Las Breñas section, the Pampa del Infierno-Los Frentones section, and the Los Pirpintos-Los Tigres-Taco Pozo sections in Santa Fe, Chaco, and Santiago del Estero provinces.

Work on the second phase is 500 km in length and it includes the Coronda-Santo Tomé and Laguna Paiva-Naré sections, both in Santa Fe province, and Talavera-Pichanal-Embarcación-Chalicán, between Salta and Jujuy. The third phase of the project is 558 km in length and it includes refurbishment of the Tucumán-Metán-Joaquín V.

González and Metán-Chalicán sections in Tucumán, Salta, and Jujuy provinces. These activities are expected to generate 23,000 jobs, including both direct and indirect employment.

The project implies major logistical work, including the transportation of more than 2 million sleepers, 170,000 tons of rail, and 5 million tons of ballast stone. CMEC is the general EPC contractor responsible for project implementation.

However, China South Locomotive & Rolling Stock Corporation (CSR) and CRRC Qishuyan — a subsidiary of the CRRC Corporation Limited — are also involved in the project as subcontractors. An official project commencement ceremony took place on July 18, 2014. However, construction activities did not begin until December 2014.

The project was originally expected to reach completion within two years (December 2016). CMEC had delivered 107 locomotives and 2500 carriages by February 2017. Then, in January 2018, locomotives manufactured by China's CRRC Qishuyan, arrived in Argentina.

On May 31, 2019, President Macri attended the inauguration ceremony of the first 700 km of renewed railway tracks of the Belgrano Cargas train in the town of Joaquin V. Gonzalez in Salta province. As of May 2022, the project had achieved a 77.96% completion rate. The Belgrano Cargas Railway Line Rehabilitation Project was at risk of cancellation and loan default in 2016.

On July 18, 2014, Argentina’s Ministry of Economy and Public Finance signed a $4,714,350,000 syndicated term loan facility agreement with three Chinese state-owned banks (Bank of China, China Development Bank, and ICBC) for the construction of two hydroelectric dams (the so-called Kirchner-Cepernic dams) on the Santa Cruz River in Patagonia.

The loan agreement included a cross-default clause, stating that if the borrower canceled the project, CDB financing for a separate project (the $2,099,965,834 loan for the Belgrano Cargas Railway Line Project) would also be cancelled.

In November 2015, newly elected Argentine President Mauricio Macri announced his intention to suspend the construction of the Kirchner-Cepernic dams.

These dams are located on the Santa Cruz River near the famous Perito Moreno Glacier (UNESCO World Heritage Site) that feeds from the same river, and the Macri administration considered these dams to be too risky on environmental grounds.

When President Macri first announced his intention to suspend the project, CDB, ICBC, and Bank of China had already disbursed $950 million under the syndicated term loan agreement.

Then, on March 10, 2016, CDB sent a warning letter to Argentina's Finance Minister, Alfonso Prat Gay, The letter said: "The Kirchner-Cepernic dams and the Belgrano Cargas are major projects promoted by the Chinese Communist Party and signed during the same political time period in Argentina and each one of the ... facility agreements contain cross-default clauses." The Macri administration subsequently reversed course and announced that it no longer intended to suspend construction of the Nestor Kirchner and Jorge Cepernic Hydroelectric Dams.

On January 10, 2022, the $2,099,965,834 syndicated buyer’s credit facility agreement between CDB, ICBC, and Argentina's Ministry of Economy and Public Finance was amended. The amendment expanded the availability period of the loan for the Belgrano Cargas Railway Line Rehabilitation Project.

Then, on January 19, 2022, an MOU was signed between the Ministry of Transport, the Administración de Infraestructuras Ferroviarias Sociedad del Estado, and China Railway International Group Co., Ltd. regarding cooperation in railway matters. The MOU was signed to support the implementation of the Belgrano Cargas Railway Line Rehabilitation Project.

Then, on June 30, 2023, CDB, ICBC, and Argentina's Ministry of Economy and Public Finance amended the $2,099,965,834 syndicated buyer’s credit facility agreement for the fourth time, reseting the loan’s LIBOR-based interest rate to a SOFR-based interest rate.

📋 Staff Comments
  1. The loan contract can be accessed in its entirety via https://www.dropbox.com/s/qzg7l2gfhv1ul32/%242.09%20billion%20credit%20facility%20in%202014%20from%20CDB%20and%20ICBC%20for%20Belgrano%20Cargas%20railway%20line.pdf?dl=0.
  2. The Government of Argentina's internal identification number for this loan is 434106544/CDB-0. The Government of Argentina's Sistema de Análisis y Control de la Deuda (SIGADE) loan identification number is 27646000.
  3. The Chinese project title is 阿根廷贝尔格拉诺铁路改造项目. The Spanish project title is Proyecto de modernización de los trenes del Belgrano Cargas Fase 1 (ver CMEC CC).
  4. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  5. The first Memorandum of Understanding to improve the railway system was signed between the People's Republic of China, Ministry of Federal Planning, Public Investment and Services of the Argentine Republic on November 16, 2004.
  6. China South Locomotive & Rolling Stock Corporation (CSR) was awarded a contract worth around RMB 1.7 billion ($270 million) to supply 100 diesel locomotives and 3500 wagons of various types as part of the reconstruction of Argentina's Belgrano Cargas network.
  7. The March 10, 2016 warning letter can be accessed in its entirety via https://www.dropbox.com/s/q6s26ninx4ldnes/Cross-Default%20Letter%20from%20China%20Development%20Bank%20to%20the%20Government%20of%20Argentina%2010%20March%202016.pdf8. The January 10, 2022 amendment to the loan agreement is referenced here: https://pagbam.com/news/china-development-banks-third-amendment-agreement-relating-to-buyer-credit-facility-agreement-for-up-to-us2099965834-entered-with-the-argentine-republic-for-the-belgrano-cargas-railway-rec/9. The June 30, 2023 amendment to the loan agreement is referenced here: https://law.asia/china/china-outbound-deals-award-2024/ and https://law.asia/zh-hans/china/china-outbound-deals-award-2024/
📚 Sources & References
  • 'La Franja y la Ruta' El rejuvenecimiento de los ferrocarriles argentinos, - Query Re- Chinese Loans to Argentina, 2016 Memo From the Argentine Ministry of Finance RE Chinese Loans
  • Advancement on the National Transport Plan
  • AMENDMENT No 3 of the AMENDED ANO RESTATED CONTRACT for Belgrano Cargas Railway Rehabilitation Project
  • Argentina celebrates railway line revamp
  • Argentine Railway Project Funded by China Begins Construction
  • Bilaterales Proyectos en Ejecución
  • Boletín Oficial de la República de Argentina
  • Buyer CCredit Agreement. Agreements Approval.
  • Buyer Credit Facility Agreement
  • Buyer Credit Facility Agreement Supported by Sinosure
  • Caputo accompanies Macri to China to promote financing for infrastructure projects
  • China and Argentina sign deals
  • China and Argentina: Investments
  • Energy and Sustainability
  • China and Argentina: Investments
  • Energy and Sustainability. The Cauchari Solar Park Project
  • China Development Bank
  • China Development Bank
  • China Development Bank´s Third Amendment Agreement relating to Buyer Credit Facility Agreement for up to US$2,099,965,834, entered with the Argentine Republic for the Belgrano Cargas Railway recovery project
  • China invertirá en redes ferroviarias de Argentina
  • China lends Argentina $7.5 billion
  • China Outbound Deals Award 2024
  • China starts work on first Latin American railway project
  • China-Latin America Economic Bulletin 2015 Edition
  • China-Latin America Finance Database
  • China-Latin America Finance Database
  • China’s Advance in Latin America Has more Challenges than Xi’s Visit Suggests
  • Chinese cargo locos arrive in Argentina
  • Comienza la renovación de la Línea Mitre
  • Cooperation projects revitalize Argentine infrastructure, light up China-Argentina ties
  • CSR chosen for Belgrano Cargas fleet renewal
  • CUENTA DE INVERSIÓN 2011 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2012 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2013 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2014 SEPARATA DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2015 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2016 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2017 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2018 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2019 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2020 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2021 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2022 SEPARATA DE DEUDA PÚBLICA
  • CUENTA DE INVERSIÓN 2023 SEPARATA DE DEUDA PÚBLICA
  • Código BAPIN 109807
  • Código BAPIN 109807
  • December 2018 Revised CDB Agreement re Belgrano
  • Decreto 1090/2014
  • Especificadaciones de la Excavadora Hidraulica De Ruedas M317D2
  • ESTADO DE LA DEUDA PÚBLICA DE LA ADMINISTRACIÓN CENTRAL ACUMULADO DESDE EL 01/01/18 AL 31/12/18
  • ESTADO DE LA DEUDA PÚBLICA DEL SECTOR PÚBLICO ACUMULADO DESDE EL 01/01/16 AL 31/12/16
  • Estatutos Sociales
  • Gerente General
  • La circunvalación ferroviaria de Santa Fe ya tiene un avance del 60%
  • Ley 27431
  • Opportunidades de Inversion
  • Parlamentaria Mixta Revisora de Cuentas 2021
  • Parlamentaria Mixta Revisora de Cuentas 2022
  • Parlamentaria Mixta Revisora de Cuentas 2023
  • Parlamentaria Mixta Revisora de Cuentas 2024
  • PLAN NACIONAL DE INVERSIONES PÚBLICAS 2020-2022
  • Presupuesto 2024: estas son las obras ferroviarias previstas para el año que viene
  • Project for the Rehabilitation of the Belgrano Cargas Railroad. Ratification.
  • Resolución 188/2018
  • Resolución 188/2023
  • S2922_17PC
  • Se inauguraron los primeros 700 kilómetros de vías renovadas del tren Belgrano Cargas
  • String of bilateral deals puts China in strong position to secure footholds in Argentina's key economic sectors
  • SYNDICATED LOANS & OTHER BANK FINANCINGS
  • Technical Documents
  • Technical Specifications
  • Tercer Diálogo Estratégico China-Argentina para la Cooperación Y Coordinación Económica
  • TEXTO ORDENADO DEL CONTRATO Y SUS ENMIENDAS para Proyecto de Rehabilitación del Ferrocarril Belgrano Cargas
  • UPDATE 1-China lends Argentina $7.5 billion for power, rail projects
  • What are the agreements signed between Argentina and China
  • Work on China’s first railway venture in Latin America got under way in Argentina this week, according to the China Machinery Engineering Corp (CMEC).
  • Xi Jinping Holds Talks with President Cristina Fernández de Kirchner of Argentina and Two Heads of State Announce the Establishment of China-Argentina Comprehensive Strategic Partnership, “一带一路”令阿根廷贝尔格拉诺货运铁路“重获新生”
  • 中企出海杰出交易 2024
  • 智利媒体:数十亿美元大单签署,习主席赞中阿关系处历史性时刻
  • 阿根廷与中国机械工程签24.7亿美元融资交易购买铁路设备
  • 阿根廷宣布从中国采购24.7亿美元铁路设备
  • 阿根廷贝尔格拉诺货运铁路改造项目
  • 阿根廷贝尔格拉诺货运铁路改造项目首两台米轨机车顺利抵达布市并举行交车仪式 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Argentina Ministry of Economy

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant