[Suspended] China Development Bank contributes to loan syndicate for 6000MW Myitsone Hydropower Plant Construction Project


Funder China Development Bank (CDB)
Recipient Organization Upstream Ayeyawady Confluence Basin Hydropower Co., Ltd (ACHC)
Country Myanmar
Start Date Jan 01, 2011
End Date Apr 27, 2029
Duration 6,691 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 35766
Grant Description

China Development Bank contributes to RNM unknown amount of syndicated loan for 6000MW Myitsone Hydropower Plant Construction Project In December 2006, State Power Investment Corporation (SPIC) signed a memorandum of cooperation with Myanmar’s Ministry of Electric Power (MoEE) No. 1 to develop 2 hydropower plant projects, one of which was the 6000MW Myitsone Hydropower Plant Construction Project.

Then, on February 20, 2010, a joint venture called the Upstream Ayeyawady Confluence Basin Hydropower (UACBH) Company was created by MoEE (15% ownership stake), SPIC (80% ownership stake), and Asia World Company (5% ownership stake) to manage the design, financing, and implementation of the 6000MW Myitsone Hydropower Plant Construction Project.

In early 2011, an RMB-denominated syndicated loan was issued (mostly likely to UACBH) for the 6000MW Myitsone Hydropower Plant Construction Project. China Development Bank (CDB) contributed to the loan, but the size of its contribution is unknown.

📋 Loan / Grant Terms
💰 Loan Amountare also unknown

However, it is known that as a source of collateral (security), the Government of Myanmar pledged its shares in the the joint venture. Future revenues (electricity sales) from the power plant were expected to be use to facilitate loan repayment.

The purpose of the project was to construct a 6000MW hydroelectric power plant and dam at the confluence of the Mali and N’mai rivers and the source of the Irawaddy River (Ayeyawady River).

The dam site is 3.2 kilometres (2.0 mi) below the confluence of the Mali River and the N'Mai River about 42 km (26 mi) north of Myitkyina, the capital of Kachin State, in northern Burma. The source of both the N'mai and Mali Rivers is the Himalaya glaciers of northern Burma in the vicinity of 28° N.

The easternmost of the two, N'mai river, is the larger stream and rises in the Languela Glacier north of Putao.

It is not navigable due to its strong current, whereas the smaller western river, the Mali, is navigable, despite a few rapids. The project's proposed 140 meter high dam would create a large reservoir inundating 397 km2 and storing 13,190 hm3 . Power generation at this site would benefit from the large upstream storage projects proposed by SPIC.

Ten percent of power generation would be provided to Myanmar free (about 2,940 GWh or 27% of consumption in 2014).

Although 90% of the power generated would be earmarked for export (primarily to Yunnan Province in China), Myanmar would have an option to purchase additional power from the project.

Also, according to the UACBH website, water flows in the Ayeyarwady River downstream of the dam would increase 16% in the dry season and reduce by 3.5% during the flooding season. Construction of preliminary works reportedly commenced on February 20, 2010.

An Environmental Impact Assessment (EIA) was submitted to Myanmar’s Ministry of Natural Resources and Environmental Conservation (MONREC) on June 1, 2011.

Then, on September 30, 2011, amid democratic reforms in the country, President Thein Sein announced that the project would be suspended.

Given that the Government of Myanmar’s seemed to take public opinion into account when it took this decision, the suspension was seen as a reversal of the authoritarian rule.

The dam project had proven controversial in Myanmar due to its enormous flooded area, its expected environmental impacts, its location 60 miles from the Sagaing fault line.

The Burmese people also regard the Irrawaddy River as the birthplace of Burmese civilization. and although access to the Chinese market guarantees the dam's electricity sales, for many Burmese people the project came to represent undue Chinese influence in Myanmar.

Prior to project suspension, resettlement at dam site was reportedly finished and works such as site formation, water supply, power supply and transportation facilities had commenced. The project has not resumed.

Former President of Myanmar, Thein Sein, announced that the dam would not resume construction during his term, which ended in March 2016. As of July 2018, the project was still indefinitely suspended, though China expressed interest in resuming the project. The Chinese project title is 密松水电站.

The Burmese project title is မြစ်ဆုံ တာတမံ.

📋 Staff Comments

After fifty years of operation, UACBH was to become 100% Myanmar-owned.

📚 Sources & References
  • China Power Investment Myanmar Myitsone River Basin in Iraq officially started
  • Dams Under Debate in China
  • Burma and Elsewhere
  • Myanmar Halts China Dam, 60% of Investment Already Paid for Suspended Myitsone Dam: Chinese Developer
  • Lessons from the Irrawaddy
  • The Myitsone Dam on the Irrawaddy River: A Briefing
  • Behind Myanmar’s suspended dam (1)
  • Impact of China's Rise on the Mekong Region
  • 中电投:本届缅甸政府将明确密松水电站前景
  • 报告:密松水电站事件重创中国在缅投资
  • 缅甸总统下令暂停由中国负责的水坝建设工程
  • China wants to restart disputed Myitsone dam in Myanmar
  • 李克强会见缅甸国务资政昂山素季
  • 缅甸官媒提出解决密松问题的第四条途径
  • Speech by Ambassador Hong Liang & Answers to Questions by Myanmar Media Reporters during a Joint Interview
  • Myanmar’s China Policy since 2011: Determinants and Directions, in: Journal of Current Southeast Asian Affairs
  • Why Chinese investors aren't too welcome in Myanmar
  • Democracy wrong reason to trap Myitsone, nmUPDATE 1-China says accord reached at last with Myanmar on oil pipeline
  • RPT-UPDATE 1-China says accord reached at last with Myanmar on oil pipeline
  • There’s no Chinese ‘debt trap’, says Myanmar minister, as government pushes for joint port project to go ahead
  • Myanmar reviews $9bn China-backed port project on cost concerns
  • Civic Groups
  • Villagers Want Myanmar to Drop Controversial Dam Project
  • Study Warns of Public Backlash to China's BRI Projects
  • Minister Rejects Fears of Debt Trap Over Chinese-Backed Port
  • BASELINE ASSESSMENT REPORT HYDROPOWER
  • ELECTRICAL INDUSTRY OF BURMA/MYANMAR ON-LINE COMPENDIUM
  • CPI: Mutually Beneficial and Double Winning China-Myanmar Myitsone Hydropower Project
  • 李军华大使一行赴密松水电站考察
  • Background of Myitsone Dam Project
  • Myitsone HPP
  • Damming the Irrawaddy
  • 专业委员会
  • Myitsone Dam
  • Powering Our Future
  • Baseline Assessment Report Hydropower
  • Myanmar’s Myitsone Dam Dilemma Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Upstream Ayeyawady Confluence Basin Hydropower Co., Ltd (ACHC)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant