Loading…

Loading grant details…

Completed Development AidData Chinese Aid

Chinese Government provides RMB 31 million interest-free loan for Praia Central Hospital Outpatient Consultation Center and OB-GYN Building Construction Project (Linked to Record ID#35065, ETCA ID#72800)

¥31M RMB

Funder China Ministry of Commerce
Recipient Organization Government of Cabo Verde
Country Cabo Verde
Start Date Jan 01, 2005
End Date Nov 29, 2032
Duration 10,194 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 35064
Grant Description

Chinese Government provides RMB 31 million interest-free loan for Praia Central Hospital Outpatient Consultation Center and OB-GYN Building Construction Project In December 2005, the Chinese Government and the Government of Cape Verde signed a financing framework agreement for the Praia Central Hospital Outpatient Consultation Center and OB-GYN Building Construction Project.

Then, on January 11, 2006, the two governments signed an Economic and Technical Cooperation Agreement (ETCA), which committed an EUR 2 million interest-free loan for the project.

In December 2008, the two governments signed another Economic and Technical Cooperation Agreement (ETCA), which committed another interest-free loan for the project.

In total, China’s Ministry of Commerce (MOFCOM) lent approximately RMB 31 million to the Government of Cape Verde for this project.

It also provided grant funding equivalent to approximately RMB 9.5 million for the provision and installation of medical equipment at Praia Central Hospital (captured in Record ID#359).

The Praia Central Hospital Outpatient Consultation Center and OB-GYN Building Construction Project involved the construction of a new obstetrics and gynaecology (OB-GYN) building (妇产科楼地下室进行局部改造) and outpatient consultation center at Agostinho Neto Hospital (HAN or Praia Central Hospital or 普拉亚中心医院) in the capital city of Praia.

The outpatient building was expected to occupy 782 square meters and provide eleven specialty services: medicine, urology, ophthalmology, surgery, ear nose and throat services, trauma services, orthopedics, stomatology, allergy services, cardiology and gastroenterology. The OB-GYN center was expected to occupy 2,128 square meters.

Hunan Constructing Engineering Group and China Liaoning International Cooperation Group (辽宁省国际经济技术合作集团有限) were the contractors responsible for implementation. Construction agreements were signed in May 2008. However, construction itself did not begin until March 1, 2009.

An inauguration ceremony for the outpatient and OB-GYN buildings took place on May 20, 2011. The Chinese Government later funded the refurbishment of the OB-GYN building in 2012 (see Record ID#35065).

📋 Staff Comments
  1. This project is also known as the Praia Central Hospital Maternity Ward Project and Phase 1 of the Praia Central Hospital Project. The Portuguese project title is Nova Maternidade do Hospital Agostinho Neto or Construção de uma central de consultas e da nova maternidade do Hospital Agostinho Neto. The Chinese project title is 建佛得角首都医院门诊和妇产科大楼 or 对中国援佛得角医院项目 or 佛得角医院项目 or 普拉亚中心医院门诊楼和妇产科住院部项目.
  2. Since the borrowing terms of the interest-free loan are unavailable, AidData has set the maturity to 20-years by default and grace period to 10-years by default per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity of interest-free loans is 20-years, with a drawdown period of 5-years, grace period of 5-years, and repayment over 10-years. AidData treats the drawdown period as providing 5-years of additional grace.
📚 Sources & References
  • 普拉亚中心医院
  • China and Cape Verde sign contract for construction of Agostinho Neto Hospital consultation and maternity center
  • Cape Verde: China to build extension to Praia hospital
  • 驻佛得角大使李春华与佛总理内维斯为中方援建项目落成剪彩
  • China finances Cape Verde hospital with 3.65 million-euro fund
  • Building on Ambition – China helps build Cape Verde after independence
  • Governo de Cabo Verde quer a China como parceiro estratégico
  • 佛得角:中国计划加强与佛得角的合作
  • 中国援建佛得角首都医院门诊和妇产科大楼落成典礼
  • New maternity hospital at Agostinho Neto opens its doors
  • Cabo Verde e China assinam acordos por troca de notas
  • 援佛得角医院项目中期检查组圆满完成工作
  • 驻佛得角大使李春华与佛总理内维斯为中方援建项目落成剪彩
  • 商务部对外援助项目招标委员会通告2007年第38号
  • ChinaLoansToAfrica©SAIS-CARI.csv
  • China's Distinctive Engagement in Global Health
  • China concedeu empréstimo sem juros a Cabo Verde
  • China funds 3.65 million euros for hospital in Praia
  • China financia nova maternidade para hospital da Cidade da Praia Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Cabo Verde

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant