Loading…

Loading grant details…

Completed Development AidData Chinese Aid

Chinese Government provides grant for Phase 1 of Saline Farmland Improvement Project (Linked to Record ID#53202)


Funder China Ministry of Commerce
Recipient Organization Government of Algeria
Country Algeria
Start Date Nov 12, 2009
End Date Jan 08, 2027
Duration 6,266 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 31785
Grant Description

On November 12, 2009 and December 28, 2009, the Chinese Ambassador to Algeria and Secretary-General of the Ministry of Agriculture and Rural Development of Algeria signed an exchange of letters, which committed grant funding for Phase 1 of the Saline Farmland Improvement Project. The face value of the grant commitment that supported this project is unknown.

However, it is known that China’s Ministry of Commerce (MOFCOM) funded the project.

The purpose of the project was to dispatch Chinese agricultural experts over a three year period to (a) the central laboratory of the National Institute of Agronomic Research of Algeria (Institut National de la Recherche Agronomique d'Algérie or INRA or المعهد الوطني الجزائري للبحث الزراعي) in the capital city of Algiers, and (b) an INRAA experimental station in the town of Hmadna (El Hamadna or الحمادنة) within the wilaya of Relizane.

On December 19, 2011, Lu Yifeng, on behalf of China Agricultural Development Group signed a project implementation contract with the Algerian Academy of Agricultural Sciences.

The contract specified that China Agricultural Development Group would provide laboratory equipment, agricultural machinery, and agricultural experts to Algeria.

Then, on March 24, 2014, a project site inspection ceremony was held at the NRAA experimental station in the town of Hmadna. The project, which formally concluded on September 26, 2014, project achieved four sets of results. First, it conducted an investigation and trial of desalination techniques over three seasons.

Soil quality improved in the second season after treatment.

Second, the project supplied farm machinery to a research site to equip it with proper agricultural research instruments. As of March 2014 the machinery and lab instruments had been installed and put to use. Algerians were also trained on the use of the equipment. Third, installed greenhouses at the NRAA experimental station in the town of Hmadna.

Fourth, two batches of 30 Algerian personnel were invited to China to receive training in soil inspection techniques. The Chinese Government also funded Phase 2 of this project (captured in Record ID#53202).

📋 Staff Comments

The Chinese project title is 盐碱地土壤改良项目. The French project title is l'amélioration des terres agricoles salines en Algérie or Projet de coopération Algéro-Chinois «Amélioration des terres agricoles salines en Algérie».

📚 Sources & References
  • China and Algeria Signed a Demonstration Project of Controlling the Salinized Soil
  • 中阿合作盐渍土治理示范项目技术培训班圆满结束 (China Algeria Saline Soil Management Demonstration Project Concludes)
  • 阿尔及利亚农技人员在晋接受培训
  • 中阿合作盐渍土治理示范项目观摩会成功举行
  • 中阿合作盐渍土治理示范项目现场观摩会在阿成功举办
  • 中阿合作盐渍土治理示范项目现场观摩会成功举行 (China-Algeria Saline Soil Management Demonstration Project Soil Inspection Ceremony)
  • China and Algeria sign exchange of texts on saline-alkali soil improvement projects
  • I signed the implementation contract for the implementation of the demonstration project of the saline soil control project.
  • CADRE PROGRAMMATION PAR PAYS ALGERIE (2013 – 2016) Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Algeria

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant