Completed Mixed AidData Chinese Aid

China Eximbank provides $482.8 million preferential buyer credit for Phase 1 of Yaoundé-Douala Highway Project

$482.8M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)
Country Cameroon
Start Date Mar 08, 2012
End Date Jul 07, 2028
Duration 5,965 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 30926
Grant Description

China Eximbank provides $482.8 million preferential buyer credit for Phase 1 of Yaoundé-Douala Highway Project On March 8, 2012, China Eximbank and Cameroon's Ministry of Economy, Planning, and Regional Development (MINEPAT) signed a $482,800,000 preferential buyer credit (PBC) agreement [CHINA EXIMBANK PBC NO. (2012) 10TOTAL NO.(198) 1420303052012210261] for Phase 1 of the Yaoundé-Douala Highway Project.

📋 Loan / Grant Terms
💰 Loan Amountcarries the following borrowing terms: a 20 year maturity
📅 Maturity20 years
⏳ Grace Period7 years
💹 Interest Rate2%

The borrower was expected to use the proceeds of the loan (PBC) to finance approximately 85% of the cost of a $568,000,000 commercial (EPC) contract between Cameroon’s Ministry of Public Works of the Republic of Cameroon and China First Highway Engineering Co. Ltd. (CFHEC), which was signed on August 8, 2011.

As of December 31, 2020, the loan had achieved a 73.2% disbursement rate (with an undisbursed balance of CFA 69.4 billion). The loan’s amount outstanding was equivalent to CFA 188.1 billion as of December 31, 2020.

The purpose of the Yaoundé-Douala highway project is to facilitate the construction of a 209.3 km (or 215 km) road linking Douala on the western coast with the capital city of Yaoundé. Phase 1 involved the construction of a 68.3 km long road, which runs from Yaoundé to Bot Makak/Bibodi. Phase 2 is expected to involve the construction of a 141 km road between Bibodi and Douala.

The six-lane highway was originally expected to be the first new motorway since the country's independence.

The project as a whole (including Phase 1 and Phase 2) seeks to replace the existing hazardous two-lane highway, and it aims to boost domestic and sub-regional trade as well as shorten the distance between Douala and Yaoundé from 265 km to 215 km. CFHEC was the general EPC contractor responsible for Phase 1 implementation.

Phase 1 construction activities began on April 15, 2014, and the originally expected project completion date was October 13, 2018; however, by April 29, 2014, there was reportedly a protracted conflict between CFHEC and the Control Mission led by the SCET-Tunisie/Louis Berger. Project implementation was delayed by unpaid indemnity owed to those living along the first 10 km of highway.

The Cameroonian authorities also reportedly made modifications to the specifications of the project by increasing the speed limit from 100 km/hour to 110 km/hour and adding extra lanes, leading the EPC contractor to assert that according to the budget only 47 km of the road could be constructed under such conditions.

By January 2015, construction had recommenced, as reported by the China’s Ministry of Commerce (MOFCOM) who noted that tree felling had taken place along 40 km of the road’s route and that earthworks had started not long before.

Then, in 2017, delays in payment to the contractor led to a one month suspension of construction beginning on May 2, 2017 and concluding in June 2017 after settlements were paid. As of May 2019, Phase 1 had achieved a 74% completion rate.

As of February 2020, the project had achieved a 80% completion rate and 6 of 36 engineering structures were not yet finished.

In April 2020, the company in charge of supervising the works, SCET-TUNISIE, reported that the project was scheduled to reach completion by December 2020 in spite of the impacts of the COVID-19 pandemic. As of August 2021, the project had achieved a 98% completion rate. CFHEC announced that the road passed the provisional acceptance at the end of December 2021.

Then, in a post on July 11, 2022, CFHEC reported that they had officially obtained the commencement order for the operation of the Yaoundé-Douala Highway.

Phase 2 of the Yaoundé-Douala Highway Project, which commenced in October 2024, appears to be funded by the African Development Bank with construction being undertaken by CFHEC.

There are some indications that the China Eximbank loan for Phase 1 of the Yaoundé-Douala Highway Project may have financially underperformed vis-a-vis the original expectations of the lender. In January 2019, Cameroon unilaterally withheld debt service payments to China Eximbank. The lender responded by withholding new loan disbursements.

Then, in July 2019, China Eximbank and the Government of Cameroon signed a debt rescheduling agreement (as captured via Record ID#88213).

Under the terms of the agreement, China Eximbank agreed to reschedule 18 loans previously contracted by the Government of Cameroon — with scheduled principal repayments between July 2019 and March 2022 — by allowing the borrower to defer scheduled principal repayments between July 2019 and March 2022 to later dates but without any maturity extensions.

The total amount of restructured debt was equivalent CFA 148 billion ($253 million) — or 70% of the loan principal that was scheduled for repayment between July 2019 and March 2022.

Under the terms of the agreement, the Government of Cameroon agreed to repay 30% of the loan principal according to the original July 2019-March 2022 schedule (i.e. without any payment deferrals).

The lender and the borrower also agreed to cancel the committed but undisbursed loan balances worth approximately CFA 10 billion (for certain loans with disbursement deadlines that had already passed).

Then, in January 2020, the International Monetary Fund (IMF) classified the Government Cameroon as facing a high risk of debt distress.

Eighteen months later, during an address before Cameroon’s National Assembly on June 28, 2021, the Minister of Water and Energy (MINEE) Gaston Eloundou Esommba provided an update on the ICBC-financed Bini à Warak Hydroelectric Power Plant Project.

He noted that the project had been 'on hold' since November 2019 because ICBC suspended the loan agreement, even though the Government of Cameroon had already mobilized XAF 22 billion of counterpart funding.

He also explained that 'the reason for this suspension is that Cameroon did not settle some of its debts towards China on time, so, it is in a cross-default situation.’

📋 Staff Comments
  1. The Chinese project title is 雅温得-杜阿拉高速公路建设项目一期. The French project title is Construction de l’autoroute Yaoundé-Douala - 1ère phase.
  2. The loan agreement can be accessed in its entirety via SourceID#67872 or https://www.documentcloud.org/documents/20485650-cmr_2012_176.
  3. The record ID number for this transaction in Cameroon's Development Assistance Database (DAD) is CAM/000814.
📚 Sources & References
  • 1.6 billion FCfa blocks Douala-Yaoundé road construction project
  • Africa Yearbook Volume 9: Politics
  • Economy and Society South of the Sahara
  • Cameroon Infastructure Report Q1
  • Cameroon Infrastructure Report Q2 2014
  • Cameroon's Development Assistance Database
  • Cameroon's first highway operational
  • Cameroon
  • China Eximbank sign $467 million loan
  • Cameroon
  • China Eximbank sign $467 million loan
  • Cameroon- 2011
  • CHINA EXIMBANK PBC NO. (2012) 10TOTAL NO.(198) 1420303052012210261
  • China First Highway begins work on $1.5bn Cameroon motorway
  • China First Highway Engineering to build Yaoundé-Douala highway
  • China First Highway Engineering to deliver first 60 km of Yaoundé-Douala road in 2020
  • China Loans to Africa
  • China–Cameroon relations: Fortunes and limits of an old political complicity
  • Chinese firm for Cameroon highway contract
  • Conflict Between Companies Stall Yaounde-Douala Road Construction
  • Construction and operation of the Yaounde-Douala motorway, phase 2. An opportunity presented by MINTP at the Yaoundé International Economic Conference
  • Construction of the Yaoundé-Douala highway (Phase I: Yaoundé - Botmakak, len. 80 km
  • COVID 19 PANDEMIC AND PROGRESS OF THE YAOUNDÉ-DOUALA HIGHWAY IN CAMEROON
  • Douala-Yaoundé Superhighway
  • Chinese Contractor Awaits Okay from Gov’t
  • Government Bond of the Republic of Cameroon
  • Government of Cameroon 2020 Register of Chinese Loans and Borrowing Terms, http://allafrica.com/stories/201305210821.html, http://global.factiva.com.proxy.wm.edu/aa/?ref=CAMEROST20120705e87500003&pp=1&fcpil=en&napc=S&sa_from=, http://global.factiva.com.proxy.wm.edu/aa/?ref=DJ00000020120628e86s000n7&pp=1&fcpil=en&napc=S&sa_from=, http://global.factiva.com.proxy.wm.edu/aa/?ref=LBA0000020120630e86u0005c&pp=1&fcpil=en&napc=S&sa_from=, http://global.factiva.com.proxy.wm.edu/aa/?ref=LBA0000020120703e873000n4&pp=1&fcpil=en&napc=S&sa_from=, http://global.factiva.com.proxy.wm.edu/aa/?ref=WDAN000020120702e8720003n&pp=1&fcpil=en&napc=S&sa_from=
  • Le chinois Cfhec reprend ses activités sur l’autoroute Yaoundé-Douala après un arrêt des travaux pour défaut de paiement
  • PREFERENTIAL BUYER CREDIT LOAN AGREEMENT ON CAMEROON YAOUNDE-DOUALA HIGHWAY (PHASE I) PROJECT
  • Progress of the Yaounde-Douala Highway Project
  • Rapport DAD-Cameroon sur l’Aide au Développement 2012-2013
  • Road infrastructure spending in Cameroon likely to be prioritised in 2017 after collapse of Yaoundé-Douala bridge
  • State visit of the President of the Republic of Cameroon H. E. Paul BIYA to China
  • Yaound?-Douala highway phase 1 construction in Cameroon 98% complete
  • Yaounde-Douala Motorway. 60% of First Phase
  • Yaoundé-Douala highway : Phase 1 expected to be delivered by December 31, 2020
  • Yaoundé-Douala Motorway: The company says it is determined to move forward in the works despite everything
  • 中企海外项目双周报(2021.12.27-2022.1.9)
  • 中国进出口银行向喀麦隆提供贷款建设雅温得-杜阿拉高速公路
  • 中国进出口银行融资支持的喀麦隆雅温得至杜阿拉高速公路一期项目顺利完成验收
  • 喀麦隆公共工程部长开会研究雅杜高速连接线项目
  • 喀麦隆公共工程部长考察雅温得-杜阿拉高速公路建设项目一期
  • 喀麦隆雅温得-杜阿拉高速公路建设项目有望于4月15日之前正式开工
  • 雅温得-杜阿拉高速公路建设项目一期跟踪与指导委员会第三次会议在雅温得召开
  • 雅温得至杜阿拉高速公路一期项目通过技术验收 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant