Completed Development AidData Chinese Aid

China Eximbank provides RMB 1.45 billion government concessional loan for Phase 1 of Addis Ababa Bole International Airport Expansion Project (Linked to Record ID#58583)

¥1.45M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Ethiopia
Country Ethiopia
Start Date Dec 19, 2013
End Date Jul 26, 2029
Duration 5,698 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 30915
Grant Description

China Eximbank provides RMB 1.45 billion government concessional loan for Phase 1 of Addis Ababa Bole International Airport Expansion Project On December 19, 2013, the Government Ethiopia's Ministry of Finance and Economic Development and China Eximbank signed an RMB 1.45 billion ($225 million or ETB 4,302,103,250) government concessional loan (GCL) agreement [CHINA EXIMBANK GCL No. 2013 (58) Total No (503) 1420303052013112665] for Phase 1 of Addis Ababa Bole International Airport Expansion Project.

Then, on April 3, 2014, the Ethiopian House of Representatives ratified the GCL agreement under Proclamation No. 833/2014, and the agreement entered into force on May 14, 2014.

The Government of Ethiopia subsequently on-lent the proceeds of the loan to Ethiopian Airports Enterprise (EAE) -- a state-owned entity tasked with administering Ethiopia's airports.

📋 Loan / Grant Terms
📅 Maturity21.266 years
⏳ Grace Period7.763 years
💹 Interest Rate2%

The loan's first and last scheduled principal payment dates were September 21, 2021 and March 21, 2035, respectively. Its first and last scheduled interest payment dates were September 21, 2014 and March 21, 2034, respectively.

The borrower was expected to use the proceeds of the GCL to finance a $225 million commercial (EPC) contract between Ethiopian Airports Enterprise (EAE) — the state-owned entity tasked with administering Ethiopia's airports — and China Communications Construction Company Ltd (CCCC), which was signed in 2012.

Then, on December 27, 2016, China Eximbank and the Government of Ethiopia signed a $117,300,000 (ETB 2,623,784,348) preferential buyer’s credit (PBC) agreement for Phase 2 of the Addis Ababa Bole International Airport Expansion Project (also known as the Addis Ababa Bole International Airport Terminal 1, VIP Terminal, Associated Works Design and Build Project).

The Ethiopian House of Representatives ratified the PBC (loan) agreement, which is captured via Record ID#58583, on February 7, 2017. The Government of Ethiopia subsequently on-lent the proceeds of the loan to EAE.

📋 Loan / Grant Terms
💰 Loan Amountcarried the following borrowing terms: a 20
📅 Maturity20.58 years
⏳ Grace Period7.57 years
💹 Interest Rate2%

The loan's first and last scheduled principal payment dates were July 21, 2024 and January 21, 2037, respectively. Its first and last scheduled interest payment dates were January 21, 2018 and July 21, 2037, respectively.

The borrower was expected to use the proceeds from the PBC to finance 85% of the cost of a $138 million commercial contract between EAE and China Communications Construction Company Ltd (CCCC).

According to the Government of Ethiopia’s Aid Management Platform (AMP), the RMB 1.45 billion (ETB 4,302,103,250) loan for Phase 1 achieved a 94% disbursement rate, with China Eximbank making 13 loan disbursements (worth ETB 4,026,390,597) between 2014 and 2021: an ETB 1,337,936,270 disbursement on June 30, 2014, an ETB 492,880,459 disbursement on September 29, 2015, an ETB 92,355,395 disbursement on December 25, 2015, an ETB 112,708,268 disbursement on June 30, 2016, an ETB 87,995,364 disbursement on October 28, 2016, an ETB 72,608,708 disbursement on November 10, 2016, an ETB 104,044,632 disbursement on December 28, 2016, an ETB 194,937,102 disbursement on May 22, 2017, an ETB 192,560,193 disbursement on June 16, 2017, an ETB 59,554,658 disbursement on September 1, 2017, an ETB 197,578,705 disbursement on March 30, 2018, an ETB 469,626,880 disbursement on March 19, 2020, and an ETB 611,603,963 disbursement on January 11, 2021.

According to the Government of Ethiopia’s AMP, the $117,300,000 (ETB 2,623,784,348) loan for Phase 2 achieved a 37% disbursement rate, with China Eximbank making a single disbursement of ETB 962,974,366 on December 22, 2017.

The shared purpose of the project's two phases was to increase the annual passenger handling capacity of Addis Ababa Bole International Airport from the 7 million to 22 million.

These two projects involved the expansion of an existing terminal (Terminal 1) with a floor area of 30,000 square meters for domestic and regional trips, the construction of a new terminal (Terminal 2) with a floor area of 74,000 square meters for international trips, and the construction of a VIP terminal.

Upon completion, Terminal 2 was expected to have three floors—arrival, departure and ground floors — and include boarding areas, lounges, recreation centers, shopping malls, offices, parking, and other facilities.

The VIP terminal — designed for use by leaders, senior government officials, diplomats and other dignitaries — was expected to includes various saloons, lounges, conference rooms, recreation centers, duty-free shops, an IT center and an exclusive parking lot.

Addis Ababa Bole International Airport is located in the Bole area of the city of Addis Ababa, 6 km (3.7 mi) southeast of the city center and 65 km (40 mi) north of Debre Zeyit. Its coordinates are 08°58′40″N 38°47′58″E. CCCC was the general EPC contractor responsible for project implementation.

Its work was overseen by EAE.

The French construction firm ADP Ingénierie supervised construction activities, while the design of the project was managed by CPG Corporation Pte. Ltd., a Singaporean company. Shanxi Construction investment Group Co. Ltd was also involved in the project (most likely as a subcontractor). The purpose of the $225 million EPC contract between CCCC and EAE was to construct Terminal 2 (‘Phase 1’).

The purpose of the $138 million EPC contract between CCCC and EAE was to construct the VIP terminal and expand Terminal 1 (‘Phase 2’). Phase 1 construction activities began in June 2014. By December 11, 2016, Phase 1 had achieved a 40% completion rate.

Phase 1 was originally expected to reach completion by January 2018 (in time for the 30th Ordinary Summit of the African Union). However, it was ultimately completed and officially inaugurated on January 27, 2019. The inauguration ceremony was attended by Ethiopian Prime Minister Abiy Ahmed. Phase 2 implementation activities commenced in September 2017 and were still underway four years later.

On March 30, 2021, Prime Minister Abiy Ahmed visited the new VIP terminal being built at the Addis Ababa Bole International Airport. Phase 2 was originally scheduled for completion on May 15, 2021. However, as of April 2022, AidData had not yet found any evidence of project completion.

There are some indications that the China Eximbank loan for Phase 1 of the Addis Ababa Bole International Airport Expansion Project may have financially underperformed vis-a-vis the original expectations of the lender.

According to the Government of Ethiopia’s Aid Management Platform, as of September 2019, ICBC suspended about $67 million worth of loan disbursements 'due to [the] cross-default situation of the country’ (see Record ID#58616).

Then, in August 2021, China Eximbank withheld $339 million loan disbursements for 12 projects and halted project implementation due to Government of Ethiopia’s rapidly dwindling foreign exchange reserves and debt sustainability challenges.

📋 Loan / Grant Terms
📅 Maturity5 years
⏳ Grace Period1 year

Then, after considerable delay, the G20 Common Framework (CF) creditor committee for Ethiopia convened in September 2021, with the French Government and the Chinese Government serving as co-chairs. The CF debt rescheduling talks were still ongoing in mid-2023.

📋 Staff Comments
  1. Addis Ababa Bole International Airport is sometimes simply referred to as Bole International Airport (in Addis Ababa). English translations of Chinese government sources may also refer to the airport as Baoli International Airport (in Addis Ababa).
  2. This project is also known as Phase 1 of the Addis Ababa Bole International Airport Expansion Project and the Addis Ababa Bole International Airport Passenger Terminal Expansion Project. The Chinese project title is 埃塞俄比亚宝丽机场扩建项目 or 博莱国际机场.
  3. The system identification number for the Addis Ababa Bole International Airport Expansion Project (‘Phase 1’) in the Government of Ethiopia’s Aid Management Platform (AMP) is 87143359103207. The system identification number for the Addis Ababa Bole International Airport Terminal 1, VIP Terminal, Associated Works Design and Build Project (‘Phase 2’) in the Government of Ethiopia’s Aid Management Platform (AMP) is 87143436112180.
  4. The loan identification number in the Government of Ethiopia’s Debt Management and Financial Analysis System (DMFAS) is 20865000 and the corresponding project name in DMFAS is ‘EBC 13/58-AA BOLE AIRPORT EXP’. See https://www.dropbox.com/scl/fi/je0aon75miofi6mt4q5q9/MOFED-Loan-Level-Data-on-Borrowing-Terms-and-Loan-Performance-September-2024_PUBLIC.xlsx?rlkey=murbb074v1px7g4njt0utzxnf&dl=0
📚 Sources & References
  • Ethiopia: Airport Enterprise to Invest U.S. $250 Million in Bole Airport Expansion
  • Ethiopia
  • China sign 101.5 billion Yuan agreement
  • Made at home
  • A 225 mln Dollar Loan to be approved for Bole Airport Expansion Project
  • US$250 million Addis Ababa Bole International Airport expansion project
  • Ethiopia
  • China Sign 101.5 Billion Yuan Agreement
  • South African based firm bids for $250 million Bole Airport expansion project
  • CHINA EXIM BANK TO EXTEND USD 120 MILLION FOR BOLE AIRPORT EXPANSION
  • Work on Addis Ababa Airport expansion project commences
  • China,Ethiopia : CCCC begins work to expand ADDIS ABABA BOLE INTERNATIONAL AIRPORT
  • Chinese Investors in Ethiopia: The Perfect Match?
  • 中国支持埃塞机场扩建项目
  • 中国进出口银行与埃塞政府签订项目贷款协议
  • 刘延东副总理见证签署两项中埃经贸合作协议
  • Ethiopia has tripled the size of its main airport as it gets set to be Africa’s gateway hub, 2.5亿美元用于埃塞保利(Bole)国际机场扩建
  • Ethiopia aims to have strategic cooperation with China on aviation sector: minister
  • 埃塞宝丽机场项目东区航站楼通过交工验收
  • Expansion work starts on Ethiopia’s airport
  • Addis Ababa Bole International Airport
  • PM Dr Abiy Inaugurates Bole Airport Terminal Expansion and 5-Star Hotel Projects
  • Ethiopian Takes Off With New Engines
  • Bole Int'l Airport to See Expansion
  • The mega hub currently built will absorb up to 120M pax per year
  • Addis Ababa Bole International Airport Expansion
  • 埃塞俄比亚宝丽机场扩建项目
  • China Loans to Africa
  • Chinese-funded airport project in Ethiopia to be completed January 2018
  • PM Visits Bole International Airport VIP Terminal Project (March 30, 2021)
  • Bole International Airport Expansion Project Forty Percent Complete
  • Feature: Chinese firm speeding up project of Ethiopia's largest airport
  • FEDERAL NEGARIT GAZETTE
  • EXIM Bank of China to Extend 120 Million USD Loan for Ethiopia
  • Ethiopian Airports to inaugurate VIP terminal
  • Widening Africa's Gateway
  • Bole International Airport serves over 10,000 passengers on a daily basis
  • 博乐国际机场二期扩建工程开工,耗资1.38亿美元
  • Addis Ababa Bole International Airport T erminal 1
  • VIP T erminal
  • Associated W orks Design and Build Project
  • Export-Import Bank of China Loan Agreement for Financing the Addis Ababa Bole International Airport Expansion Project Ratification Proclamation
  • MOFED Loan-Level Data on Borrowing Terms and Loan Performance September 2024_PUBLIC Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Ethiopia

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant