Loading…

Loading grant details…

Completed Development AidData Chinese Aid

Chinese Government provides $30 million grant — via ETCA — for Cape Coast Sports Stadium Construction Project

$30M USD

Funder China Ministry of Commerce
Recipient Organization Government of Ghana
Country Ghana
Start Date Aug 01, 2011
End Date Sep 24, 2033
Duration 8,090 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 30600
Grant Description

In August 2011, the Chinese Government and the Government of Ghana signed an exchange of notes, which officially committed $30 million of grant funding for the Cape Coast Sports Stadium Construction Project.

The grant proceeds were drawn from an Economic and Technical Cooperation Agreement (ECTA) that was signed on the same day.

The purpose of the project was to construct a 15,000-seat stadium — in Cape Coast within Ghana’s Central Region — with eight runway tracks, a football field with natural turf, two basketball courts, a handball court, an outdoor tennis court, a boxing training field, a gymnasium, athlete dormitory rooms, LED electronic display system, and an audio system.

China IPPR International Engineering Corporation was the contractor responsible for project design, and China Jiangxi International Economic and Technical Cooperation Co., Ltd. was the contractor responsible for project implementation.

The Ghanaian Government committed 6.69 million cedi (approximately $3.35 million) of counterpart funding for the project (in order to finance the ground preparatory works, clearance of the imported construction materials from the port, and related purchases to the project site and the provision of security at the project site).

A project design contract with China IPPR International Engineering Corporation was signed in March 2012.

China IPPR International Engineering Corporation then dispatched a technical team to Ghana to develop a preliminary architectural design.

On December 13, 2012, Ghana’s Ministry of Youth and Sports and China Jiangxi International Economic and Technical Cooperation Co., Ltd signed a construction contract.

The construction of the stadium was originally expected to begin in February 2013, but it ultimately did not commence until July 15, 2013. Project implementation concluded on November 14, 2015. Then, on April 22, 2016, an official handover ceremony for the stadium was held. An inauguration ceremony for the stadium was held on May 3, 2016.

In September 2018, the former head of the Ghanaian National Development Planning Commission Dr.

Nii Moi Thompson argued that the quality of construction for the stadium was subpar, seen as cracks and degradation in the foundations of the stadium.

Thompson's perspective creates a real reason for concern around the long-term safety for anyone nearby the stadium as a result of unsatisfactory quality of construction.

In addition, in March 2023 the Electricity Company of Ghana (ECG) decided to disconnect power supply to the stadium on account of outstanding legacy debt for the amount of GHC 513,000, suggesting improper consumption of energy. This is the second time electricity was cut off, the first occurring in 2022.

📋 Staff Comments
  1. The Chinese project title is 海岸角体育场项目.
  2. One source suggests that project implementation commenced on July 1, 2013 rather than July 15, 2013. This issue warrants further investigation
📚 Sources & References
  • Cape Coast Sports Stadium
  • China To Build Cape Coast Stadium Free Of Charge - Prez Mahama
  • Ghana
  • China sign $30m Cape Coast stadium contract
  • CONSTRUCTION OF CAPE COAST STADIUM TO START IN FEBRUARY
  • Ghana : Cape coast stadium to be completed in 2015
  • 中国政府优惠贷款实施海岸角市场改造项目竣工
  • 中加签署援加海岸角体育场项目设计合同
  • The Ghanaian Minister of Youth Sports and the Governor of the Central Province inspected China's aid in the construction of the Coastal Cape Stadium
  • Chinese government aids Ghana Cape Coast Stadium project to hold preliminary handover ceremony
  • China's aid to Ghana Cape Coast Stadium project officially handed over
  • Remarks by Chinese Ambassador to Ghana H.E. Mdm. Sun Baohong at the Inauguration Ceremony of the Cape Coast Sports Stadium and China Ghana National Youth Football Friendship Match
  • Chinese govt to build Cape Coast stadium for free
  • 中国援加纳最大项目海岸角体育场正式移交
  • 驻加纳大使孙保红陪同加青体部长和中部省省长视察海岸角体育场项目
  • 中国援加纳最大项目海岸角体育场正式移交
  • 中国援加纳海岸角体育场项目正式移交
  • Renovation work begins at Cape Coast Sports Stadium
  • Introduction of China-Ghana Relations
  • Report of Finance Committee
  • Ghana’s Cape Coast Stadium a “disaster waiting to happen”
  • ECG disconnects Cape Coast Sports Stadium over GHC513,000 legacy debt Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Ghana

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant