China Eximbank provides $541.6 million buyer's credit loan for Phase 1 of 211MW Memve'ele Hydroelectric Power Plant Project (Linked to Record ID#57586)

$541.6K USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)
Country Cameroon
Start Date Jan 21, 2013
End Date Feb 10, 2027
Duration 5,133 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 289
Grant Description

China Eximbank provides $541.6 million buyer's credit loan for Phase 1 of 211MW Memve'ele Hydroelectric Power Plant Project On January 21, 2013, China Eximbank and the Cameroonian Ministry of Economy, Planning, and Regional Development signed a buyer's credit loan (BCL) agreement (Contract No. BLACAM 2011001) worth $541,566,018 for Phase 1 of the 211 MW Memve'ele Hydroelectric Power Plant Project.

📋 Loan / Grant Terms
📅 Maturity15 years
⏳ Grace Period5 years

The Ministry of Finance of the Republic of Cameroon agreed to provide the lender with a repayment guarantee (as defined in Article 1 of the BCL agreement). The borrower also purchased buyer's credit insurance from Sinosure.

The borrower was expected to use the proceeds of the loan to finance 85% of the total cost ($637,136,492) of a commercial (EPC) contract between Cameroon’s Ministry of Water and Energy and Sinohydro Corporation, which was signed on April 12, 2012.

As of December 31, 2020, the loan (BCL) had achieved a 100% disbursement rate and the its outstanding amount was equivalent to CFA 203.4 billion.

The Memve'ele Hydroelectric Power Plant Project is a large-scale hydro-electric run-of-river dam and hydroelectric generator plant that involves a barrage that is 1,260 meters long and 14 meters high, with two overflow channels and a grand spillway to the generating plant. The dam site is around 26 square kilometers.

The plant has four generators and turbines each. It is expected to inject 211 MW of electricity into Cameroon's energy supply network. The plant is located in Nyabizan on the Ntem River in the South region, 300 km from Yaounde. Sinohydro Corporation was the EPC contractor responsible for project implementation.

On June 15, 2012, President Paul Biya presided over the ceremony to lay the foundation stone of the project. Construction was completed in August 2016.

Record ID#57586 captures a separate China Eximbank loan worth $141.8 million loan for Phase 2 of the 211 MW Memve'ele Hydroelectric Power Plant Project.

The proceeds of this loan were used by the borrower for the construction of 294 pylons between Nyabizan and Ebolowa to evacuate 211MW of power from the Memve'ele dam to Yaounde, the installation of 225 KV transmission lines, and the construction and installation of three transformer substations with a capacity of 225/90 KV in the localities of Ebolowa, Nkoumou in the South Region and Ahala in the Centre Region.

As of September 30, 2021, the construction of the Nyabizan-Yaoundé evacuation line had achieved a 92% completion rate.

However, the completion of Phase 2 depends on payment of compensation to the people affected by the transmission line’s corridor.

According to the Government of Cameroon, the revenue generated by the power plant and Nyabizan-Yaoundé transmission line since ‘powering up’ from April 2019 to October 2021 amounts to CFAF 45 billion.

In addition, the partial completion of the 211MW Memve'ele Hydroelectric Power Plant Project has reportedly enabled the shutdown of the Ahala, Oyom-Abang, Mbalmayo and Ebolowa thermal power stations.

There are some indications that the China Eximbank loan for Phase 1 of the 211MW Memve'ele Hydroelectric Power Plant Project may have financially underperformed vis-a-vis the original expectations of the lender. In January 2019, Cameroon unilaterally withheld debt service payments to China Eximbank.

The lender responded by withholding new loan disbursements.

Then, in July 2019, China Eximbank and the Government of Cameroon signed a debt rescheduling agreement (as captured via Record ID#88213).

Under the terms of the agreement, China Eximbank agreed to reschedule 18 loans previously contracted by the Government of Cameroon — with scheduled principal repayments between July 2019 and March 2022 — by allowing the borrower to defer scheduled principal repayments between July 2019 and March 2022 to later dates but without any maturity extensions.

The total amount of restructured debt was equivalent CFA 148 billion ($253 million) — or 70% of the loan principal that was scheduled for repayment between July 2019 and March 2022.

Under the terms of the agreement, the Government of Cameroon agreed to repay 30% of the loan principal according to the original July 2019-March 2022 schedule (i.e. without any payment deferrals).

The lender and the borrower also agreed to cancel the committed but undisbursed loan balances worth approximately CFA 10 billion (for certain loans with disbursement deadlines that had already passed).

Then, in January 2020, the International Monetary Fund (IMF) classified the Government Cameroon as facing a high risk of debt distress.

Eighteen months later, during an address before Cameroon’s National Assembly on June 28, 2021, the Minister of Water and Energy (MINEE) Gaston Eloundou Esommba provided an update on the ICBC-financed Bini à Warak Hydroelectric Power Plant Project.

He noted that the project had been 'on hold' since November 2019 because ICBC suspended the loan agreement, even though the Government of Cameroon had already mobilized XAF 22 billion of counterpart funding.

He also explained that 'the reason for this suspension is that Cameroon did not settle some of its debts towards China on time, so, it is in a cross-default situation.’

📋 Staff Comments
  1. The Chinese project title is 喀麦隆曼维莱水电站. The French project title is Projet de construction du barrage hydroélectrique de Memve’ele.
  2. The SAIS-CARI database of Chinese loan commitments released in July 2020 records the following lending terms: an interest rate of 6-month Euribor + 3.1% margin, a 16-year maturity, and a 6-year grace period. AidData records the borrowing terms that are specified in the BCL agreement itself (15-year maturity, 5-year grace period, 6- month LIBOR + 3.1% margin).
  3. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  4. The BCL agreement can be accessed in its entirety via SourceID#67490 and https://www.documentcloud.org/documents/20485598-cmr_2011_173.
  5. The project ID number for this transaction in Cameroon's Development Assistance Database (DAD) is CAM/000745.
  6. The precise loan signature (official commitment) date is January 21, 2013 is drawn from a March 2021 publication of the Government of Cameroon’s Caisse Autonome d'Amortissements.
  7. According to the Government of Cameroon, '[we] opted for the [Sinosure] insurance premium to the detriment of the guarantee by an escrow account fed by the sales receipts of our raw materials and/or natural resources' ('retenu l’option de prime d’assurance au détriment dela garantie par un compte séquestre alimenté par les recettes de vente de nosmatières premières et/ou ressources naturelles'). See https://www.dropbox.com/s/n9l0tovq3xs3mb8/1.%20Projet%20de%20construction%20du%20port%20en%20eau%20profonde%20de%20Kribi%202.%20Projet%20de%20Construction%20des%201500%20logements%203.%20Projet%20de%20Constructio.pdf?dl=0
📚 Sources & References
  • 2015 Bond Prospectus Republic of Cameroon
  • Barrage hydroélectrique de MEMVE’ELE
  • Buyer Credit Loan Agreement
  • Buyer Credit Loan Agreement (Contract No. BLACAM 2011001)
  • BU_PITCH_ENGLISH_2018.xlsx
  • Cameroon's Development Assistance Database
  • Cameroon- 2011
  • Cameroon: Memve'ele Hydroelectric Dam - Life Changing Project
  • CAMEROON: Memve’éle and Mekin dams to start operating in 2020
  • Cameroun: réception provisoire d'une centrale hydroélectrique construite par une entreprise chinoise
  • CAPTURING THE RAINS: A COMPARATIVE STUDY OF CHINESE INVOLVEMENT IN CAMEROON’S HYDROPOWER SECTOR
  • China to fund 3 hydro-electric dam projects in Cameroon.
  • China–Cameroon relations: Fortunes and limits of an old political complicity
  • Construction Of Memeve’ele Hydroelectric Project Officially Begins
  • Contract No. BLACAM 2011001
  • Government of Cameroon 2020 Register of Chinese Loans and Borrowing Terms, http://www.cameroononline.org/2012/06/15/construction-of-memeveele-hydroelectric-project-officially-begins/
  • Major Chinese energy firm eyes greater share in Cameroon market
  • Memve'ele Hydroelectric Dam - Life Changing Project
  • Memve'ele Hydropower Station Project
  • Rapport DAD-Cameroon sur l’Aide au Développement 2012-2013
  • State visit of the President of the Republic of Cameroon H. E. Paul BIYA to China
  • The Export-Import Bank of China and the Government of Cameroon signed a loan agreement for the Manville Hydropower Project
  • The minister of Water and Energy before the committee on Finance and the Budget of the national assembly
  • Work begins on China-backed hydroelectric dam in Cameroon
  • 中国水电集团与中国进出口银行、喀麦隆政府签署5.41亿美元水电站贷款协议
  • 中国进出口银行与喀麦隆政府签署曼维莱水电站项目贷款协议
  • 中国进出口银行贷款建设的喀麦隆曼维莱水电站奠基
  • 喀麦隆总统授权经济部长与中国进出口银行签署贷款协议
  • 喀麦隆曼维莱水电站工程举行奠基仪式
  • 曼维莱水电站8月15日开始蓄水
  • 曼维莱水电站将于今年9月开始试发电 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Cameroon Ministry of Economy, Planning, and Regional Development (MINEPAT)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant