China Eximbank provides RMB 480 million loan for Lot 2 of Phase 1 of Plaines Wilhems Sewage Project On February 25, 2009, China Eximbank and the Government of Mauritius signed an RMB 480 million loan agreement for Lot 2 of Phase 1 of Plaines Wilhems Sewage Project.
It is repayable over 10-years via semi-annual installments between March 2014 and March 2024. As of December 31, 2013, the loan had achieved a 91% disbursement rate (RMB 439,484,256 out of RMB 480,000,000). The Plaines Wilhelms Sewage Project Construction Project had 4 major components: (1) reconstruction of the St.
Martin Wastewater Treatment Plant and increasing its capacity from 48,000 m3 /day to 69,000 m3 /day to serve a population of 233,0001; (2) construction of a new 27 km trunk sewer to increase trunk sewer capacity from the Plaines Wilhems district to St Martin Sewerage Treatment Plant; (3) construction of 262 km of reticulation network in the Plaines Wilhems catchment areas to increase sewerage flows to St Martin Sewerage Treatment Plant; and (4) construction of nearly 32,500 house connections in the municipalities of Quatre Bornes, Beau Basin/Rose Hill, Curepipe and Vacoas/Phoenix and effluent out-fall to the La Ferme Irrigation System.
Project components 3 and 4 — the construction of the reticulation network and house connections — was divided into 4 lots: Lot 1A, Lot 1B, Lot 2 and a Lot for Additional House Connections.
China Eximbank funded Lot 2 (Zone 7 — Central Quatre Bornes, Zone 8 — NE Quatre Bornes, ad Zone 8A — Sodnac) of Phase 2, which involved the construction of a 91 km sewer reticulation system in Central Quatre Bornes and Sodnac, the construction of 12,956 house connections, and the replacement of about 50 km of water supply pipes.
Beijing Construction Engineering Group Co., Ltd. (BCEG) was the contractor responsible for implementation of Lot 2 of Phase 1 of Plaines Wilhems Sewage Project.
It signed a construction contract with the Government of Mauritius’ Wastewater Management Authority (WMA) on February 7, 2008. Construction began on March 14, 2012 and the project was successfully completed successfully on September 20, 2014.
The project reportedly resulted in some 10,000 houses being connected to a newly constructed 100 km sewer network in the regions of Central Quatre Bornes, Sodnac and Belle Rose. Around 50 km of Central Water Authority (CWA) pipes were also replaced in the course of project implementation. Upon completion, the project entered a Defects Liability Period.