China Eximbank pledges $4.923 billion loan for 3,050MW Mambilla Hydroelectric Power Plant Project (Linked to Record ID#1844)

$4.92M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Nigeria
Country Nigeria
Start Date Sep 01, 2017
End Date Sep 06, 2026
Duration 3,292 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 1990
Grant Description

China Eximbank pledges $4.923 billion loan for 3,050MW Mambilla Hydroelectric Power Plant Project On September 14, 2017, the Government of Nigeria approved the 3,050MW Mambilla Hydroelectric Power Plant Project.

The total cost of this project is $5.792 billion and it will reportedly be financed according to an 85:15 debt-to-equity ratio.

China Eximbank has agreed in principle to provide a $4.923 billion buyer’s credit and the Government of Nigeria has agreed in principle to provide an $868.8 million equity contribution.

The project would involve the construction of four dams, two underground powerhouses having 12 turbine generator units in total, and a 700-kilometer transmission line.

The four dams to be constructed on the Dongo River for the Mambilla hydropower project include Nya (formerly known as Gembu), Sumsum, Nghu and Api Weir dams.

Nya and Sumsum will be 100m and 35m-tall roller compacted concrete (RCC) dams with crest length of 515m and 460m, respectively.

Nghu will be a 95m-high rockfill dam with a crest length of 650m, while Api Weir will be a small regulatory dam to raise the water level of the river.

Nya and Sumsum dams will be connected through a 16km-long, 6m-diameter tunnel, whereas Sumsum and Nghu dams will be connected by a 1.5km-long and 10m-wide canal. The headrace canal for the plant will be 3.1km-long and 15m-wide.

Each underground power house of the plant will measure 175mx27mx38m and house six 250MW Pellton turbine units operating at a total dynamic head of 1,007m.The diameter of the power shafts connecting each turbine will range between 5.25m and 8.40m.

Two 6km-long tailrace tunnels for the plant will be of 8m diameter each, while the tailrace canal will be 3km-long and 25m-wide.

Upon completion, it is envisaged that the electricity generated by the power plant will be sold to the Transmission Company of Nigeria, which will in turn transmit it to two locations, where it will be integrated into the Nigerian electricity grid: a 330kV high voltage transmission line will connect to Jalingo and four 500kV high voltage transmission lines will connect to Makurdi.

This high voltage transmission system will measure 700 kilometers in length.

Construction is expected to take at least seven years from start to finish, due to the technical complexity of the project. However, some sources suggest that a more realistic completion date is in 2030. The project is expected to generate 50,000 temporary and permanent jobs.

On August 30, 2017, Nigeria’s Federal Executive Council (FEC) approved the award of the construction contract for this project to a consortium (joint venture) that consists of Gezhouba Group, Sinohydro and CGCOC Group. In November 2017, there were attempts to start construction of the hydroelectric power plant.

However, due to various constraints, including landslides, and a lawsuit at the International Court of Arbitration, the project stalled.

Then, following the resolution of the lawsuit, the Government of Nigeria formally applied for a loan from China Eximbank on August 26, 2019.

📋 Staff Comments

The Chinese project title is Mambilla水电站 or 为蒙贝拉水电站项目. Boston University’s China's Global Energy Finance Database identifies this loan as an official commitment. However, AidData has not yet identified any official sources that confirm the signing of a final loan agreement. The loan terms are unknown.

📚 Sources & References
  • Wide Appeal to Boost Power
  • Chinese Cos To Build Power Plants In Nigeria, http://www.eoearth.org/article/Energy_profile_of_Nigeria
  • Chinese Awarded US$1.4-bil. Hydroelectric Project in North-Eastern Nigeria, http://www.china.tu-berlin.de/fileadmin/fg57/Lehre/0809_Wasserwirtschaft/China_dam_guide.pdf, http://www.nigeriafirst.org/article_11815.shtml, http://www.businessweek.com/news/2012-11-07/nigeria-china-s-sinohydro-sign-accord-for-power-plant, http://www.ngrguardiannews.com/index.php?option=com_content&view=article&id=104631:work-commences-on-3759mw-mambilla-zungeru-plants&catid=94:energy-report&Itemid=592, http://www.codewit.com/business-news/8565-nigeria-fg-approves-1-72-bn-counterpart-funding-for-hydro-dams, http://www.internationalrivers.org/resources/mambilla-dam-nigeria-3596
  • Nigeria and Chinese Company Sign an Agreement for the Construction of Hydropower
  • Collaboration between Water Resources and Power Ministries will grow business in Nigeria – VP Sambo
  • Intrigues Delay Nigeria's Biggest Hydro Project
  • 中国海外水坝行业指南
  • Infrastructure Financing Trends in Africa – 2017
  • THE PROJECT FOR MASTER PLAN STUDY ON NATIONAL POWER SYSTEM DEVELOPMENT IN THE FEDERAL REPUBLIC OF NIGERIA FINAL REPORT
  • Power: 45Yr Mambilla Power Project Stews In Legal
  • Funding Controversies
  • Power, 3050 MW Mambilla Hydro Power Project Set to Start
  • Mambilla Power Project Gets $5.79bn for Takeoff
  • Mambila Hydropower Plant (3,050MW)
  • 尼大型水电项目由中国企业承建
  • Buhari unveils ambitious projects for 2018
  • President Buhari’s Takeaways From FOCAC Beijing Summit
  • 耗资414亿,这国正式向中国申请贷款,中非最大水电站项目开工!
  • China to support Nigeria in completing Mambila power project
  • 尼日利亚政府正式为蒙贝拉水电站项目向中国申请约50亿美元贷款
  • China's Global Energy Finance
  • GeoHack - Mambilla Hydroelectric Power Station
  • 尼政府已正式为蒙贝拉水电站向进出口银行申请49.3亿美元贷款
  • Mambilla Hydropower Project
  • Mambilla水电站计划年内开工
  • 争端解决 非洲第二大水电站Mambilla今年将开建
  • Mambilla Hydroelectric Power Station
  • BU_PITCH_ENGLISH_2018
  • Mambilla Power Project Suffers Setback As Counterpart Fund Missing In 2021 Budget
  • Daily Trust reports: Buhari raises committees for 3050MW Mambilla power project
  • FG releases compensation funds for N2tn Mambilla project
  • Mambilla hydropower project sites still fishing grounds
  • Govt Lists Beneficiaries of $22.7bn Loan
  • No court injunction stopping Mambilla project - FG
  • Covid-19 may delay start of Mambilla project
  • House Expresses Outrage Over Failed Take-Off of Mambilla Power Project, $1.25bn for Abuja rail, $500m for NTA Buharis $22.7bn loan spending plan
  • Nigeria - Projects - Electricity - Hydro
  • Nigeria set to build second largest hydropower plant in Africa
  • FG approaches China for $17bn loans
  • Construction of Mambilla hydropower project in Nigeria to start before end of 2020
  • Mambilla hydropower project mere wish in absence of access roads
  • Ishaku insists
  • Accused of 'Undermining' Case Against P&ID
  • Shasore Gets Another Huge Arbitration Contract
  • Senate Raises Concern Over Zero Allocation for Mambila Power Project in Budget, 2021 BUDGET: FG EARMARKS N425M FOR 3050MW MAMBILLA HYDRO-POWER PROJECT
  • FG secures $6.15bn for Nigeria’s power infrastructure Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Nigeria

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant