Loading…
Loading grant details…
| Funder | Unspecified Chinese Government Institution |
|---|---|
| Recipient Organization | Government of Niger |
| Country | Niger |
| Start Date | Dec 05, 2011 |
| End Date | Jul 21, 2028 |
| Duration | 6,073 days |
| Number of Grantees | 1 |
| Roles | Recipient |
| Data Source | AidData Chinese Aid |
| Grant ID | 18148 |
On 5 December, 2011, Niger's National Education Minister, Madam Ali Mariama Elhadj Ibrahim, and the Chinese Ambassador to Niger, Xia Huang, signed a 1.5 billion XOF grant agreement for the Tondigamey and Talladjé Est II School Construction Project. This project involved the construction of two, 10-classroom schools in the Nigerian capital of Niamey.
It also involved the drilling of water wells at these schools.
The schools are located in two suburbs of Niamey: Tondigamey and Talladjé Est II China Geo-Engineering Corporation (CGC) is the contractor responsible for implementation. A groundbreaking ceremony took place on 31 May, 2012; however, it is not known if or when this project was completed.
The funds for this project were drawn in part from a 2011 Economic and Technical Cooperation Agreement (ETCA) (see Umbrella Record ID#58641).
- Some government sources cite 1.4 billion XOF as the total project cost (See: LANCEMENT DES TRAVAUX DE CONSTRUCTION DE DEUX ECOLES PRIMAIRES : LA REPUBLIQUE POPULAIRE DE CHINE MET A LA DISPOSITION DE LA REGION DE NIAMEY 2 ECOLES PRIMAIRES DE 20 CLASSES ET 4 BUREAUX EQUIPES and Discours de M. Dong Guangli, Chargé d'Affaires a. i. à la cérémonie de lancement des travaux de la construction de deux écoles primaires financées par le Gouvernement chinois).
Government of Niger
Complete our application form to express your interest and we'll guide you through the process.
Apply for This Grant