Completed Mixed AidData Chinese Aid

China Eximbank provides $99.45 million preferential buyer's credit for 51MW Adama I Wind Farm Project (Linked to Record ID#30241)

$99.45M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Government of Ethiopia
Country Ethiopia
Start Date Nov 23, 2010
End Date Apr 03, 2027
Duration 5,975 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 1380
Grant Description

China Eximbank provides $99.45 million preferential buyer's credit for 51MW Adama I Wind Farm Project On July 19, 2009, the Ministry of Finance of Ethiopia and China’s Ministry of Commerce (MOFCOM) signed a $1 billion infrastructure cooperation agreement, which proposed 7 projects to be financed by China Eximbank through its preferential buyer’s credit (PBC) window.

One of the projects that was identified was the Adama Wind Farm Project.

One day later, on July 20, 2009, Ethiopian Electric Power Corporation (EEPCO) signed an MOU with the Hydrochina-CGCOC JV (a joint venture between Hydrochina Corporation, and CGC Overseas Construction Co. Ltd. (CGCOC) to pursue the Adama Wind Farm Project in the form of a financing agreement and an EPC contract.

Then, on September 22, 2009, EEPCO signed an EPC preliminary agreement for the 51MW Adama I Wind Farm Project with Hydrochina-CGCOC JV.

Hydrochina Corporation subsequently undertook a project feasibility study and an environmental impact assessment with support from EEPCO’s wind study center.

Then, on November 23, 2010, China Eximbank and the Government of Ethiopia's Ministry of Finance and Economic Development signed a $99,450,000 (ETB 1,646,523,179) preferential buyer credit (PBC) agreement [CHINA EXIMBANK PBC 2010 (31) TOTAL NO. (138) 1420303052010211538] for the 51MW Adama I Wind Farm Project.

On January 21, 2011, the Ethiopian Parliament and the Prime Minister's Office approved the loan agreement.

At the end of the same month, the Government of Ethiopia's Ministry of Finance and Economic Development signed an on-lending agreement with EEPCO. The loan officially went into effect on May 25, 2011.

📋 Loan / Grant Terms
💰 Loan Amountwere as follows: a 20
📅 Maturity20.178 years
⏳ Grace Period7.665 years
💹 Interest Rate2%

The loan's first and last scheduled principal payment dates were July 21, 2018 and January 21, 2031, respectively. Its first and last scheduled interest payment dates were July 21, 2011 and January 21, 2031, respectively.

The ultimate borrower (EEPCO) was expected to use the proceeds of the loan to finance approximately 85% of the total cost of a $117,994,500 commercial (EPC) contract [No. 33.20/12/09] between EEPCO and Hydrochina-CGCOC JV, which was signed on November 28, 2009. The Ethiopian Government directly funded the remaining 15% of the commercial contract cost (approximately $18,544,500).

According to the Government of Ethiopia’s Aid Management Platform (AMP), the $99,450,000 (ETB 1,646,523,179) loan (PBC) achieved a 97% disbursement rate, with China Eximbank making 7 loan disbursements (worth ETB 1,603,194,607) between 2011 and 2017: an ETB 298,469,388 disbursement on July 7, 2011, an ETB 682,737,266 disbursement on January 8, 2012, an ETB 266,957,500 disbursement on July 7, 2012, an ETB 74,386,618 disbursement on October 10, 2012, an ETB 101,657,404 disbursement on January 8, 2013, an ETB 178,986,403 disbursement on July 7, 2013, and an ETB 27 disbursement on November 15, 2017.

The purpose of the project was to install a 51MW wind farm — with a total of 34 towers each generating 1.5 MW — on a site located 95 km east of Addis Ababa, near the city of Adama in Oromia. Hydrochina-CGCOC JV was the general EPC contractor responsible for project implementation.

However, consultancy services were provided by the Addis Ababa University Faculty of Technology, while a Chinese firm called Xinjiang Goldwind Science & Technology Co., Ltd. (or ‘Goldwind’) provided the wind turbines for the project. The EPC contract went into effect on November 12, 2009. The project was originally scheduled to commence on November 12, 2009, and reach completion on December 31, 2010.

However, construction did not begin until June 2011. Then, an installation and hoisting ceremony for the project's wind turbines was held on April 21, 2012. Construction ended in June 2012. Then, the wind farm began commercial operations in August 2012. According to the CGCOC, the wind farm began full operations in September 2012.

An inauguration ceremony for the first phase of the Adama Wind Project was held on December 1, 2012.

There are some indications that the China Eximbank loan for the Adama I Wind Farm Project may have financially underperformed vis-a-vis the original expectations of the lender.

According to the Government of Ethiopia’s Aid Management Platform, as of September 2019, ICBC suspended about $67 million worth of loan disbursements 'due to [the] cross-default situation of the country’ (see Record ID#58616).

Then, in August 2021, China Eximbank withheld $339 million loan disbursements for 12 projects and halted project implementation due to Government of Ethiopia’s rapidly dwindling foreign exchange reserves and debt sustainability challenges.

📋 Loan / Grant Terms
📅 Maturity5 years
⏳ Grace Period1 year

Then, after considerable delay, the G20 Common Framework (CF) creditor committee for Ethiopia convened in September 2021, with the French Government and the Chinese Government serving as co-chairs. The CF debt rescheduling talks were still ongoing in mid-2023.

📋 Staff Comments
  1. This project is also known as Phase 1 of the Adama Wind Farm Project, the Adama/Nazareth Wind Power Project, and the Adama Wind Farm I Project. The Chinese project title is ADAMA风电一期项目.
  2. The AMP system identification number for the project is 87143122101161.
  3. One source (https://link.springer.com/article/10.1007/s41111-022-00214-8) suggests that this project was financed through an Engineering, Procurement, Construction and Financing (EPC+F) arrangement. Under most EPC+F contractual arrangements, a loan is extended to the EPC contractor but with a sovereign guarantee from the host government. However, this is difficult to reconcile with the fact that China Eximbank financed the 51MW Adama I Wind Farm Project through a PBC, which is a type of loan that is usually only issued to foreign government borrowers. This issue warrants further investigation.
  4. China Eximbank also provided a $293.25 million preferential buyer's credit for the 153MW Adama Wind Farm II Project (as captured via Record ID#30241).
  5. The loan identification number in the Government of Ethiopia’s Debt Management and Financial Analysis System (DMFAS) is 20803000 and the corresponding project name in DMFAS is ‘EBC 10/31 ADMA NAZ WIND POWER’. See https://www.dropbox.com/scl/fi/je0aon75miofi6mt4q5q9/MOFED-Loan-Level-Data-on-Borrowing-Terms-and-Loan-Performance-September-2024_PUBLIC.xlsx?rlkey=murbb074v1px7g4njt0utzxnf&dl=0
📚 Sources & References
  • http://www.2merkato.com/20120112774/adama-wind-power-project-ethiopia-progressing, http://www.addisfortune.com, http://blog.sina.com.cn/s/blog_5e7ec5f10100hs9g.html, http://www.2merkato.com/201203261045/ethiopian-wind-farm-project-near-completion
  • Ethiopia signs windfarm, dam deals with China
  • Nationally Appropriate Mitigation Actions of Developing Country Parties
  • The Adama One Wind Power Project inaugurated
  • Public Sector Debt Statistical Bulletin: Bulletin No. 7 (2006/07-2010/11)
  • Loan Agreement signed for Adama Wind Power Phase II constructed by China Power
  • UNECE International PPM Forum
  • 中国进出口银行与埃塞政府签订项目贷款协议
  • Wind Power Project in Ethiopia
  • 中国进出口银行2015年年度报告
  • Adama Wind Farm I (51 MW)
  • 埃塞总理出席阿达玛风电一期竣工仪式并考察高速公路项目
  • 中国驻埃塞俄比亚大使解晓岩出席中国公司承建阿达玛风电项目末台风机吊装仪式
  • 中国驻埃塞俄比亚大使解晓岩考察中埃合作风电项目
  • 中国驻埃塞俄比亚大使解晓岩出席风电项目交接仪式并考察高速公路项目
  • China's Global Energy Finance to Ethiopia
  • GovernmentConcessional-Loan-PreferentialBuyer-sCredit-Brochure-pdf.pdf
  • The Winds of change in Africa-China relations?Contextualing African agency in Ethiopia-ChinaEngagement in Wind energy Infrastructure Financingand Development’
  • ADAMA “WIND FARM I” TO BE INAUGURATED
  • Export Import Bank of China Credit Agreement to Provide Loan for Financing the Adama/Nazreth Wind Power Construction Project Ratification Proclamation
  • Adama I Wind Farm Project Summary Report
  • 埃塞俄比亚总理与中国驻埃塞俄比亚大使参加我公司ADAMA风电一期项目竣工典礼
  • EEPCo secures fund for Aysha Wind Farm Project
  • Building Bridges: China's Growing Role as Infrastructure Financier for Sub-Saharan Africa
  • Government Concessional Loan and Prefferential Buyer's Credit Brochure
  • EEPCo Gives Construction Contracts of New Power Plants to Chinese Company
  • Addis Ababa University
  • MOFED Loan-Level Data on Borrowing Terms and Loan Performance September 2024_PUBLIC
  • Adama Wind Power Construction Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Ethiopia

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant