| Funder | Agricultural Bank of China (ABC) |
|---|---|
| Recipient Organization | PT OBI Nickel Cobalt (ONC) |
| Country | Indonesia |
| Start Date | May 23, 2023 |
| End Date | Mar 04, 2030 |
| Duration | 2,477 days |
| Number of Grantees | 1 |
| Roles | Recipient |
| Data Source | AidData Chinese Aid |
| Grant ID | 108286 |
Nine state-owned Chinese banks contribute to RMB 5.5 billion syndicated loan for Phase 3 of High Pressure Acid Leach (HPAL) Plant Project in Indonesia 2023 In September 2020, Shenzhen Green Eco-Manufacture (GEM) — a Chinese company — signed an offtake agreement with Halmahera Persada Lygend for the supply of mixed nickel-cobalt hydroxide precipitate (MHP), nickel sulphate, and cobalt sulphate, along with other raw materials from the High Pressure Acid Leach (HPAL) Plant Project.
Under the eight-year agreement, GEM is be supplied with a minimum of 74,400 tons and a maximum of 178,560 tons of nickel a year. It is also receive a minimum of 9,296 tons and a maximum of 22,320 tons of cobalt by-products a year.
Then, on May 25, 2023, PT OBI Nickel Cobalt (ONC) — a special purpose vehicle and joint venture of Lygend New Power (Hong Kong) Limited (60% equity stake), Li Yuen Pte.
Ltd (30% equity stake), and PT Trimegah Bangun Persada Tbk (10% equity stake) — signed an RMB 5.5 billion ($780 million) syndicated loan agreement with Agricultural Bank of China (Ningbo Branch), Agricultural Bank of China (Ningbo High-tech Industrial Development Zone Branch), Bank of China (Ningbo Branch), China CITIC Bank (Ningbo Branch), Shanghai Pudong Development Bank (Ningbo Branch), Industrial Bank (Ningbo Branch), and China Guangfa Bank (Ningbo Branch) for Phase 3 of the High Pressure Acid Leach (HPAL) Plant Project.
The Sinosure-backed loan carries an 8-year maturity.
Phase 3 involves the construction of a high pressure acid leach (HPAL) plant — including three nickel-cobalt compound production lines, with planned production capacity of 65,000 tons of nickel-cobalt compound metal (including 7,500 tons of cobalt metal) per year — in the Kawasi village mining area within North Maluku province on the Obi Islands of Indonesia.
The project is designed to utilize hydrometallurgical high-pressure acid leaching technology for the production of mixed nickel-cobalt hydroxide precipitate (MHP), along with nickel sulphate and cobalt sulphate as the end products.
Construction was originally expected to start in the third quarter of 2022 with production commencing in the first quarter of 2024. Construction commenced on June 27, 2022 and the project reached its reached its design capacity on September 2, 2024.
PT OBI Nickel Cobalt (ONC)