China Eximbank provides $88.51 million loan for Gibe III Hydro Power Transmission and Transformation Substation Project

$88.51M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Ethiopian Electric Power Corporation (EEPCo)
Country Ethiopia
Start Date Jan 01, 2013
End Date Oct 08, 2026
Duration 5,028 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 105831
Grant Description

China Eximbank provides $88.51 million loan for Gibe III Hydro Power Transmission and Transformation Substation Project In 2013, Ethiopian Electric Power Corporation (EEPCo) signed a $88,510,000 loan agreement with the Export-Import Bank of China for the Gibe III Hydro Power Transmission and Transformation Substation Project.

📋 Loan / Grant Terms
💰 Loan Amountincluded an interest rate of 2

The purpose the project was to construct one or more substations to facilitate the evacuation of power from the Gibe III hydroelectric power plant. The project was completed and put into operation in 2014.

📋 Staff Comments
  1. According to the World Bank's Debtor Reporting System (DRS), the weighted average grace period of all ‘private’ sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Ethiopia was 3.1666-years in 2013. AidData estimates the grace period of the CET loan by using this figure. See https://www.dropbox.com/scl/fi/g794svts1vdwnvksjllsh/August-2024-IDS-Download-Ethiopia-s-Borrowings-and-Borrowing-Terms-from-Private-Sector-PRC-Creditors.xlsx?rlkey=i6j0mqp1jrx5en6xll3ebgl3g&dl=0.
  2. According to the World Bank's Debtor Reporting System (DRS), the weighted average maturity of all ‘private’ sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Ethiopia was 13.7792-years in 2013. AidData estimates the maturity of the CET loan by using this figure. See https://www.dropbox.com/scl/fi/g794svts1vdwnvksjllsh/August-2024-IDS-Download-Ethiopia-s-Borrowings-and-Borrowing-Terms-from-Private-Sector-PRC-Creditors.xlsx?rlkey=i6j0mqp1jrx5en6xll3ebgl3g&dl=0.
  3. According to the World Bank's Debtor Reporting System (DRS), the weighted average interest rate of all ‘private’ sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Ethiopia was 2.9872% in 2013. AidData estimates the interest rate of the CET loan by using this figure. See https://www.dropbox.com/scl/fi/g794svts1vdwnvksjllsh/August-2024-IDS-Download-Ethiopia-s-Borrowings-and-Borrowing-Terms-from-Private-Sector-PRC-Creditors.xlsx?rlkey=i6j0mqp1jrx5en6xll3ebgl3g&dl=0.
  4. According to the World Bank's Debtor Reporting System (DRS), ‘private’ sector lending from all Chinese creditors to government and government-guaranteed borrowing institutions in Ethiopia was $1,802,970,000 in 2013. $1,802,970,000 is nearly identical to the sum of the face value of the $1,002,970,414 CET loan that supported the 500kV Power Transmission Line of the Great Ethiopian Renaissance Dam (GERD) Project, the $250 million ZTE supplier’s credit that supported the Telecom Transformation and Expansion 6 Circles Project (with support from a China Eximbank export seller’s credit), the $460.07 million ICBC loan that support the Gibe III Hydro Power Generating Set Project, and the $88.51 million loan (from China Eximbank and potentially other Chinese creditors) that supported the Gibe III Hydro Power Transmission and Transformation Substation Project. See https://www.dropbox.com/scl/fi/g794svts1vdwnvksjllsh/August-2024-IDS-Download-Ethiopia-s-Borrowings-and-Borrowing-Terms-from-Private-Sector-PRC-Creditors.xlsx?rlkey=i6j0mqp1jrx5en6xll3ebgl3g&dl=0 and https://www.sciedupress.com/journal/index.php/jms/article/viewFile/25488/16079.
  5. This China Eximbank loan was not included in the database of Chinese loan commitments that SAIS-CARI released in 2020 and re-released in 2021. Nor was it included it in the Chinese Loans to Africa (CLA) Database — that is maintained by Boston University's Global Development Policy Center — as of August 2024.
📚 Sources & References
  • Background
  • BACKGROUND
  • Gibe III HPP
  • Gibe III Today
  • Gibe III Hydroelectric Project
  • The total Project immplimentation as of October 18,2012 is 62%.
  • Gilgel Gibe III Hydroelectric Power Project
  • August 2024 Ethiopia's Borrowings and Borrowing Terms from 'Private' Sector PRC Creditors
  • Infrastructure Development in Ethiopia and Its Impact on Economic Diplomacy With China
  • Gilgel Gibe III dam
  • Ethiopia
  • Gibe III Hydroelectric Project Background
  • Gibe III HPP - Monthly Report for July 2009
  • Gibe III Hydroelectric Project, “东非水塔”变“东非电塔” 东方 电气承建非洲“三峡工程”
  • List of Ethiopia- China Cooperation Major Projects from Ethiopia's Ministry of Finance September 2024 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Ethiopian Electric Power Corporation (EEPCo)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant