| Funder | Sino-Metals Leach Zambia Limited |
|---|---|
| Recipient Organization | CNMC-Mabende Metal Leach SPRL |
| Country | Democratic Republic of the Congo |
| Start Date | Mar 20, 2012 |
| End Date | Jan 18, 2028 |
| Duration | 5,782 days |
| Number of Grantees | 1 |
| Roles | Recipient |
| Data Source | AidData Chinese Aid |
| Grant ID | 105824 |
SML provides $22 million shareholder loan for Mabende Copper Leach Plant Construction Project On March 20, 2012, Sino-Metals Leach Zambia Limited (SML) and Huachin SPRL entered into a agreement to establish a joint venture in the DRC to undertake the Mabende Copper Leach Plant Construction Project.
CNMC-Mabende Metal Leach SPRL [CNMC-Mabende or (中色馬本德礦業有限公司)] — a special purpose vehicle and and joint venture of SML [60% equity stake] and Huachin SPRL (an LLC incorporated in the DRC) [40% equity stake] — subsequently received a $22 million shareholder loan from SML for the Mabende Copper Leach Plant Construction Project.
The purpose of the project was to construct a copper leach plant -- with annual production capacity of 20,000 tons of 99.95% cathode copper — in Lwisha with the ores from the Mabende copper mine in the Democratic Republic of the Congo (DRC). Construction of the leach plant commenced in April 2013.
The project was completed and officially commissioned on February 10, 2014.
CNMC-Mabende Metal Leach SPRL