Completed Mixed AidData Chinese Aid

China Eximbank contributes to $70 million loan for Phase 1 of the Sentuo Oil Refinery Project (Linked to Record ID#105745)

$35M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization Sentuo Oil Refinery Limited
Country Ghana
Start Date Jan 01, 2021
End Date Oct 10, 2027
Duration 2,473 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 105744
Grant Description

In 2021, China Eximbank and China Construction Bank contribute to USD 70 million loan for Phase 1 of Sentuo Oil Refinery Project, Ghana The Sentuo Oil Refinery Project, which is being undertaken in two phases, involves the construction, commissioning, and operation of a 5 million metric ton per annum (MTPA) -- i.e. 100,000 barrels per day (BPD) -- oil refinery in Tema.

The products from the refinery will include LPG, gasoline, diesel, kerosene, fuel oil, and asphalt.

Phase 1 involves the construction of a medium-scale oil refinery with a throughput capacity of 2MTPA (40,000 BPD purchased from the Middle East, Nigeria and Venezuela).

Phase 2 will involve the construction of an oil refinery with a throughput capacity of 3MTPA (60,000 BPD purchased from the Middle East and Nigeria). The total estimated cost of Phase 1 (excluding working capital expenses) was $753,850,000.

Phase 1 was to be financed according to a debt-to-equity ratio of 9:91 (a $683,850 equity contribution and a $70 million loan).

The loan to Sentuo Oil Refinery Limited (森拓石油化工有限公司) — a special purpose vehicle and wholly owned subsidiary of Sentuo Group Limited, a private joint-stock enterprise that is jointly established by professionals engaged in innovative chemical technology development and industrial application, petrochemical project construction, energy, and petrochemical trade — for Phase 1 was expected to be repaid within 5-years of the commissioning of the oil refinery (estimated final maturity date: January 26, 2029) and repayment was expected to start six months after construction (estimated first repayment date: July 1, 2021).

The total estimated cost of Phase 2 (excluding working capital expenses) was $862,110,000.

Phase 2 was to be financed according to a debt-to-equity ratio of 13:87 (a $762,110,000 equity contribution and a $100 million loan).

In July 2023, China Eximbank and China Construction Bank agreed to issue a Sinosured-backed loan to Sentuo Oil Refinery Limited for Phase 2.

China Shandong International Economic & Technical Cooperation Group Ltd (CSI) (山东国际加纳公司) was the contractor responsible for Phase 1 implementation. Phase 1 construction activities began in January 2021. The oil refinery commenced Phase 1 operations on August 29, 2023. Then, on January 26, 2024, Ghanaian President Nana Addo Dankwa Akufo-Addo attended a Phase 1 completion ceremony.

The project was originally scheduled to commence construction in December 2020 and reach completion by June 2023.

While oil refineries are known for their output of air pollutants and water contamination as pointed out by BFT Online in February 2024, Sentuo's website shows an awareness of their negative impacts on the environment.

It describes working in an 'environmentally sound manner' and striving to be one of the 'top five lowest greenhouse gas (GHG) emitters in the oil and gas industry'. In June 2020, an environmental impact assessment was prepared by Sentuo Oil Refinery Limited as required by law.

The assessment noted steps would be taken to mitigate negative environmental and social impacts as part of the establishment of the refinery including negative impacts on the wetland surroundings, and the nearby Chema Lagoon.

Despite this, the Ghanian Environmental Protection Agency refused to grant a permit for the construction, citing the location's wetland status and futher burden to the already environmentally challenged Chema Lagoon. Nonetheless, construction went ahead, with support from the Tema Development Corporation.

📋 Staff Comments
  1. This project is also known as the Sentuo of Group Company Limited 5 MTPA Refinery Project. The Chinese project title is 森拓(加纳)炼油一期项目 or 森拓石油化工(加纳)有限公司炼油厂项目一期工程 or 山东国际加纳炼油厂项目 or 加纳森拓石化炼油.
  2. The identity of the lender that supported Phase 1 is unknown. However, given that China Eximbank and China Construction Bank agreed to co-finance Phase 2 (with credit insurance from Sinosure), AidData assumes for the time being that Phase 1 was supported by the same financing arrangement and that China Eximbank and China Construction Bank made equivalent ($35 million) contributions to the $70 million loan. This issue warrants further investigation.
  3. AidData has estimated an interest rate of 9% based on the following source (https://ir.parliament.gh/bitstream/handle/123456789/3694/REQUES~1.PDF?sequence=1&isAllowed=y). This issue warrants further investigation.”
📚 Sources & References
  • Request for Approval for the Waivers of Customs Duties
  • Taxes and Levies on Materials and Equipment/Machinery for the Construction of the Sentuo Oil Refinery at Tema
  • Our history
  • Ambassador Lu Kun's speech at the reception in celebration of the 74th anniversary of the founding of the People's Republic of China
  • Ghanaian president commissions Chinese-built oil refinery
  • Ambassador Lu Kan attends the opening ceremony of Centor Refinery
  • The first phase of the Cento (Ghana) refinery project undertaken by the 16th Chemical Construction Company was completed
  • Centor Petrochemical (Ghana) Co.
  • Ltd.
  • Shandong International Ghana Company starts construction of refinery project
  • Four overseas projects newly signed by Chinese companies started construction
  • Shandong International Ghana Refinery Project Starts Construction
  • CCB Hunan Branch successfully hosted Hunan's Africa Products and Tourism Matchmaking Conference, “三建客”来“湘”会 湖南建行联动欧洲巴黎分行、约翰内斯堡分行服务中非经贸博览会
  • Focus on China-Africa Economic and Trade Expo! The total number of projects is 120, with an amount of US$10.3 billion_DAI
  • Hunan Construction Investment Group signs 4 overseas projects in a row! The total amount of the project reaches US$520 million
  • China-Africa Infrastructure Cooperation Forum Successfully Held
  • Sentuo Oil Refinery to provide major boost to 1D1F initiative - Trade Minister
  • President Akufo-Addo commissions Sentuo oil refinery
  • Rage over Sentuo Oil's employment capcity after $261m tax exemptions
  • Environmental Impact Assessment
  • SHICO signs Cooperation Agreement of Oil Refinery (5 million Tons/year) Phase II Project in Ghana
  • Sentuo oil refinery limited
  • Sentua Oil Refinery Limited
  • Sentuo Refinery Operations: Balancing progress and environmental concerns
  • Tema: Sentuo oil defies EPA’s directive; construction of refinery on wetland ongoing
  • CALL FOR COMMENTS FROM THE PUBLIC ON THE PROPOSED SENTUO OIL REFINERY AT THE TEMA HEAVY INDUSTRIAL AREA ENDS ON FRIDAY, 31ST JULY 2020 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sentuo Oil Refinery Limited

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant