Completed Mixed AidData Chinese Aid

China Eximbank provides RMB 1.7 billion loan for the WP&RKA Laterite Nickel Mine Project (Linked to Record ID#71809, #67801, and #105188)

¥1.7M RMB

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization PT Wanatiara Persada
Country Indonesia
Start Date Jan 01, 2018
End Date Jan 24, 2027
Duration 3,310 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 105187
Grant Description

China Eximbank provides RMB 1.7 billion loan for the WP&RKA Laterite Nickel Mine Project In July 2008, PT. Wanatiara Persada (WP) and PT.

Rimba Kurnia Alam (RKA) — created a joint venture called the WP&RKA Company to finance, design, and implement the WP&RKA Laterite Nickel Mine Project. At that time, WP held a 60% ownership stake and RKA held a 40% ownership stake in the WP&RKA Company.

Then, in 2016, Jinchuan Group — the ultimate holding company of Jinchuan International, a state-owned Chinese enterprise — acquired WP’s 60% ownership stake and RKA’s 40% ownership stake in order to invest in the WP&RKA Laterite Nickel Mine Project.

To facilitate this $57.13 million acquisition was well as the implementation of the $601 million WP&RKA Laterite Nickel Mine Project, China Development Bank (CDB) issued a $34 million foreign exchange loan to Jinchuan Group (Record ID#67801).

📋 Loan / Grant Terms
💰 Loan Amountare unknown

In 2018, China Eximbank also issued two loans to PT.

Wanatiara Persada — a special purpose vehicle and wholly-owned subsidiary of Jinchuan Group — for the WP&RKA Laterite Nickel Mine Project: an RMB 1.7 billion loan with a 10-year maturity (Record ID#105187) and a $150 million loan with a 10-year maturity (Record ID#105188).

The purpose of the project, which was financed according to a 70:30 debt-to-equity ratio, was to build a laterite nickel mine and a 150MW power plant — with three, 50MW power generation units (Unit 1, Unit 2, and Unit 3) — in Kawasi Village, Obi Island, Halmahera Regency South, and North Maluku Province (exact locational coordinates: -1.569915816292653, 127.41508693097965).

The project was surveyed by the Nuclear Industry Jinhua Engineering Survey Institute, designed by Jinchuan Nickel Cobalt Research and Design Institute Co., Ltd., supervised by Gansu Jingwei Construction Supervision Consulting Co., Ltd., and implemented by Jinchuan Group Engineering Construction Co., Ltd.

Construction started on November 25, 2016. Unit 1 was commissioned in May 2019 and Unit 2 was commissioned in June 2019. Unit 3 was commissioned in September 2019. On October 30, 2019, all production lines went into operation, marking the completion of the project.

📋 Staff Comments

1. This project is also known as the WP&RKA nickel pit iron (NPI) project and the Indonesia Jinchuan WP & RKA Lateritic-Nickel-Ore Project. The Chinese project title is 印尼金川WP&RKA红土镍矿项目. It has been identified by China’s National Development and Reform Commission as a key China-Indonesia intergovernmental capacity cooperation under the Belt and Road Initiative.

📚 Sources & References
  • 2021021100432.pdf
  • UMBRA Putu Raditya Nugraha Representative Deals
  • Jinchuan gets go-ahead to export 2.2m tonnes of nickel ore from Indonesia
  • China's Jinchuan confident it can fill Indonesia nickel ore void, 《人民政协报》:开发性金融:架起“一带一路”的金融桥梁 ——国家开发银行服务“一带一路”建设纪实, 2019 年度第一期中期票据信用评级报告
  • 印尼金川WP&RKA红土镍项目全面建成投运, 2020 年度第三期中期票据信用评级报告
  • 开发性金融力助甘企“走出去”
  • 国际资源合作助印尼产业升级
  • 金川集团与印尼WP公司签订红土镍矿开发合作协议
  • 印尼金川WP&RKA红土镍矿项目——冶炼厂
  • International resource cooperation helps Indonesia's industry upgrade
  • Events of Jinchuan Group in 2016
  • Jinchuan Group WP&RKA power station
  • Jinchuan Group's overseas projects were selected for the China Engineering Luban Award
  • Indonesia Jinchuan WP&RKA Laterite Nickel Project
  • Indonesia Jinchuan WP&RKA laterite nickel smelting project completed and put into operation
  • LAPORAN KINERJA TAHUN 2019
  • Investasi US$ 600 juta, smelter feronikel Wanatiara Persada beroperasi akhir tahun
  • Construction starts on Jinchuan’s laterite project in Indonesia
  • Jinchuan eyes nonferrous peak via M&A
  • Sunpower’s 37th design project in Indonesia achieves successful grid connection in all units, 2024 Interim Results Announcement
  • Indonesia’s Jinchuan WP expects to put into operation for 2018, [SMM analysis] the first ship in Jinchuan
  • Indonesia, the launch of nickel and iron may play a role in suppressing the price of high nickel iron in the later period.
  • Our history
  • WP&RKA Laterite Nickel Mine Project Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

PT Wanatiara Persada

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant