China Eximbank provides loan for 66MW Cox's Bazar Wind Farm Project

$82.51M USD

Funder Export-Import Bank of China (China Eximbank)
Recipient Organization US-DK Green Energy (BD) Ltd.
Country Bangladesh
Start Date Jan 01, 2022
End Date May 03, 2027
Duration 1,948 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 104953
Grant Description

China Eximbank provides loan for 66MW Cox's Bazar Wind Farm Project In 2022, the Hunan Branch of the Export-Import Bank of China (China Eximbank) issued a loan worth approximately $82.51 million to US-DK Green Energy (BD) Limited — a special purpose vehicle and wholly-owned subsidiary of Wuling Power Corporation Limited (a subsidiary of the Chinese State Power Investment Corporation Limited, or SPIC) — for the 66MW Cox's Bazar Wind Farm Project.

📋 Loan / Grant Terms
💰 Loan Amountare unknown

However, it is known that the $116.51 million project was undertaken on a build-own-operate (BOO) basis and it was financed according to a debt-to-equity ratio of approximately 71:29.

The purpose of the IPP project was to finance, construct, own, and operate a 66MW wind farm in Khurushkul within Chakaria Upazila, Cox's Bazar District, and Chattogram Division.

The project involved the installation of 22 wind turbines — with a single unit capacity of 3MW — on a site that occupies 18 square kilometers. It also involved the construction of a 132 KV transmission line.

Upon completion, the wind power plant was expected to generate about 145 million kWh of clean electricity annually, reducing coal consumption by 44,600 tons, carbon dioxide emissions by 109,200 tons, and meeting the electricity demand of 100,000 households.

Bangladesh Power Development Board (BPDB) agreed to purchase electricity from US-DK Green Energy (BD) Limited at $0.12 per unit (1.0 kilowatt/hour) for 18-years from the operational start date of the power plant.

Power China Chengdu Engineering and Fujian Electric Power Engineering Company served as the engineering, procurement and construction (EPC) contractors for the project. A formal commencement ceremony took place in October 2021. However, construction did not begin until March 31, 2022. The project reached a major milestone on May 26, 2023, injecting 30MW of electricity into the national grid.

Six months later, in November 2023, China Eximbank conducted a post-loan inspection at the project site. Then, on March 8, 2024, the power plant started full-scale operations. The power plant was connected to the grid and operating at full capacity by April 18, 2024. The project was originally scheduled for completion by December 2023.

📋 Staff Comments
  1. The Chinese project title is 孟加拉国科巴风电项目 or 科巴风电项目. The Bangla project title is কক্সবাজার বায়ু বিদ্যুৎ কেন্দ্র.
  2. The precise financial commitment year is unknown. For the time being, AidData assumes that China Eximbank issued the loan in the year of the first year of project implementation (2022). This issue warrants further investigation.
  3. Some sources suggest that Wuling Power Corporation Limited may not hold a 100% equity stake in US-DK Green Energy (BD) Limited. This issue warrants further investigation.
📚 Sources & References
  • Infrastructure & PPPs in Bangladesh - Q42020 Update
  • 山西建投聚焦“走出去”战略 深耕海外拓市场
  • 孟加拉国科巴风电项目:孟加拉国的“捕风者”
  • Power plant profile: Cox’s Bazar Wind Farm
  • Bangladesh
  • Chinese-invest first wind power plant in Bangladesh fully into operation
  • Cox's Bazar wind power project set to complete in two months
  • Khurushkul wind farm, 60MW wind power project: First turbine's installation complete
  • Cox’s Bazar wind power project adds 20MW electricity to nat’l grid, 60MW wind power plant commences operation today
  • Cox's Bazar 60 MW Wind Power Plant
  • Cox’s Bazar to generate 60MW from wind energy by December
  • 共建“一带一路”·第一现场|“中孟两国在清洁能源领域合作前景广阔”
  • 孟加拉国首个大型集中式风电场全面投产
  • 孟加拉国首个风电项目举行开工奠基揭牌仪式, “一带一路”上,中企描绘“走出去”增长曲线
  • Bangladesh’s first centralized wind power project begins operating
  • Bangladesh’s First Large Wind Power Project Launched
  • Country’s first big leap in wind energy from December Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

US-DK Green Energy (BD) Ltd.

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant