CMEC provides $551.5 million supplier's credit for Power Transmission Network Associated with the Imboulou Hydropower Plant Project (Linked to Record ID#434, #73614)

$551.5K USD

Funder China Machinery Engineering Corporation (CMEC)
Recipient Organization Government of Republic of Congo
Country Congo
Start Date Dec 19, 2005
End Date Mar 20, 2029
Duration 8,492 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 1049
Grant Description

CMEC provides $551.5 million supplier's credit for Power Transmission Network Associated with the Imboulou Hydropower Plant Project On December 19, 2005, CMEC and the Government of the Republic of Congo signed a supplier’s credit agreement worth $551,507,000 (or approximately worth CFA 321.7 billion) for the Power Transmission Network Associated with the Imboulou Hydropower Plant Project.

📋 Loan / Grant Terms
📅 Maturity17 years
⏳ Grace Period5 years
💹 Interest Rate0.2%

As of 2014, USD 551 had been disbursed. The borrower was originally expected to make 24 semi-annual repayments between 2011 and 2022.

The proceeds of the supplier’s credit were to be used by the borrower to finance 85% of the cost of its $648,832,000 commercial contract with CMEC. The Republic of Congo agreed to cover the remaining 15% of the commercial contract cost ($97,325,000) itself.

Over the lifetime of the supplier’s credit, the Republic of Congo agreed to repay $557,849,330.50 in principal and interest. Then, on January 18, 2006, the supplier’s credit agreement was modified (in particular, Articles 6, 8 and 13).

The project execution period was reduced from 5-years to 3.5-years and additional changes were introduced related to the name of the lender; the credit conditions; loan repayment and amortization table; the duration, validity and termination of the credit; and the conditions of entry into force of the credit.

Then, on April 13, 2018, CMEC and the Republic of Congo signed another supplier’s credit agreement modification to reschedule the repayment terms.

📋 Loan / Grant Terms
📅 Maturity22 years
💹 Interest Rate0.2%

As such, the rescheduling agreement effectively increased the grace period of the supplier’s credit by an additional 3-years (from June 2018 to June 2021). As of April 13, 2018, the borrower had already repaid $207,876,503.54. The loan's (principal) amount outstanding was $348,614,050 as of June 1, 2018.

Under the terms of the rescheduling agreement, the borrower was responsible for making a $25,249,617 repayment (24,901,003 in principal and $348,614 in interest) on June 1, 2021 and a $25,224,716 repayment ($24,901,003 in principal and $323,713 in interest) on December 1, 2021. However, according to the Republic of Congo's Ministry of Finance, neither of these repayments were made.

By the end of calendar year 2021, the Republic of Congo had approximately $50 million of principal and interest arrears to CMEC.

This project sought to build upon the CMEC-financed 120MW Imboulou Hydropower Plant Project (captured via Record ID#434).

It involved connecting the Imboulou Hydropower Plant with several small power stations to construct a “major power channel” (or “energy boulevard”) between the cities of Pointe-Noire, Brazzaville and Ouesso.

More specifically, it supported the construction of a load dispatching center (“redistribution center”); the construction and rehabilitation of 220kv transmission lines and very high voltage transformer plants between Brazzaville and Pointe-Noire (passing through Mindouli and Loudima); the construction of seven 220 KV and 110 KV high-voltage power stations in Djiri, Ngo, Gamboma, Oyo, Boundji, Owando and Djambala (including a 220kV Imboulou-Ngo segment, a 220kV Ngo-Brazzaville segment; a 220kV Ngo-Gamboma segment, a 220kV Oyo-Owando segment, and a 110kV Ngo-Djambala-Oyo-Boundji segment); the construction of underground 220kV transmission line in Tsiélampo; the construction of nine 30kV aerial lines measuring 242 km in length (including an Imboulou-Inoni-Mpoumako-Imvouba segment, an Inoni-Inoni2-Mbouambé-Léfini segment, an Imboulou-Mbé-Ngabé segment, and an Imboulou-Mpouya segment); the construction of four 20kV underground transmission lines of 20kV to evacuate power from the Imboulou Hydroelectric Power Plant to the capital city of Brazzaville; and the construction of nine additional 220 kV and 110 kV high voltage lines (measuring 841 km in length).

In total, the project sought to create a 1,588 km national electricity transmission network. CMEC was the contractor responsible for implementation. A project start order was issued on June 25, 2008. However, construction did not begin until May 28, 2009. The originally anticipated project completion date was December 31, 2011.

But the project was ultimately completed on May 23, 2012.

Record ID#1049 captures the original 2005 supplier’s credit and Record ID#73614 captures the 2018 debt rescheduling agreement.

📋 Staff Comments
  1. This project is also known as the Transmission Line Substations for Imboulou Hydropower Plant Project or the Pointe-Noire-Brazzaville Very High-Voltage Transmission Network Rehabilitation Project. The Chinese project title is 英布鲁水电站配套输变电工程 or 刚果(布)输变电工程 工程规 or 的刚果(布)英布鲁水电站配套输变 or 刚果输变电项目. The French project title is Projet de Construction du Réseau de Transport d’Energie Associé à la Centrale d’imboulou or Construction du réseau de transport d'énergie électrique associé à la centrale hydroélectrique d'Imboulou or Les lignes attenantes à la centrale hydroélectrique d’Imboulou.
  2. In the database of Chinese loan commitments that SAIS-CARI released in July 2020, it identifies a $264 million China Eximbank loan in 2009 for this project. However, AidData relies on the face value of the CMEC supplier’s credit ($551,507,000) and the commitment year (2005) of the supplier’s credit agreement that is specified in the agreement itself. It is possible that CMEC obtained an export seller’s credit from China Eximbank to finance its supplier’s credit with the Republic of Congo; however, AidData has not yet independently confirmed that this occurred.
  3. CMEC used to stand for China National Machinery & Equipment Import & Export Corporation, but it now refers to China Machinery Engineering Corporation.
  4. The CMEC supplier's credit agreement can be accessed in its entirety via https://www.dropbox.com/s/g4bkuq71ezrpjoy/L%20n%C2%B019-2019%20du%2024%20mai%202019.pdf?dl=0 or https://www.documentcloud.org/documents/20488096-cog_2005_490. AND https://www.dropbox.com/s/g4bkuq71ezrpjoy/L%20n%C2%B019-2019%20du%2024%20mai%202019.pdf?dl=05. A detailed analysis of the debt rescheduling that took place on April 13, 2018 can be found at https://www.cgdev.org/sites/default/files/bargaining-beijing-tale-two-borrowers-revised-feb2021.pdf and https://www.cgdev.org/sites/default/files/gardner-et-al-bargaining-with-beijing-data-revised.xlsx.
📚 Sources & References
  • Avenant No2 i la Convention de financement du Projet de Construction du R6seau de Transport d'Energie Associe i la Centrale d'Imboulou
  • Bargaining with Beijing A Tale of Two Borrowers
  • Bargaining with Beijing February 2021 Update
  • Bargaining with Beijing: A Tale of Two Borrowers
  • China Machinery Engineering Corp Social Responsiblity Report 2013
  • China Machinery Engineering Corporation's 2012 Annual report
  • ChinaLoansToAfrica©SAIS-CARI
  • CMEC 2013 Social Responsibility Report
  • Decree 2015-178
  • DESS_CONGO_Valorisation_rapport
  • Ensemble, gagnons la bataille de la modernisation
  • Execution du service de la dette exercice 2021
  • EXIMBANK-CHINA
  • Exécution du service de la dette exercice 2021, http://www.honghubbs.cn/n1180/n1226/n2410/n314289/6434284.html
  • IMF Country Report No.06/262
  • International partnerships building confidence
  • JOURNAL OFFICIEL DE LA REPUBLIQUE DU CONGO
  • LIGNE HAUTE TENSION DU CONGO
  • Loi n.19-2019 du 24 Mai 2019
  • N°22 RAPPORT IMBOULOU 2 N°22
  • Power Transmission Lines and Transmission Stations
  • PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 16.5 MILLION (US$25.5 MILLION EQUIVALENT) TO THE REPUBLIC OF CONGO FOR A WATER
  • ELECTRICITY AND URBAN DEVELOPMENT PROJECT
  • PROJET DE CONSTRUCTION DU RÉSEAU ÉLECTRIQUE ASSOCIÉ À LA CENTRALE D’IMBOULOU
  • Résumé de l'Accord de restructuration de la dette du Congo envers la Chine
  • Strategie de destion de la dette à moyen-terme
  • World Bank Document
  • 刚果输变电项目
  • 湖北电建一公司承建的刚果(布)输变电项目二标段工程移交 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Republic of Congo

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant