Bank of China contributes to syndicated debt financing package for 500MW Dzhankeldy Wind Farm, 33-500kV Substation, 500kV Dzhankeldy-Bash and Dzhankeldy Western Plot-Eastern Plot Substations OHTL IPP Project

$68.25M USD

Funder Bank of China (BOC)
Recipient Organization ACWA Power Dzhankeldy Wind Limited Liability Company
Country Uzbekistan
Start Date Mar 29, 2023
End Date Oct 09, 2033
Duration 3,847 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 102744
Grant Description

ICBC and BOC contribute to syndicated debt financing package for ACWA Power Dzhankeldy Wind Limited Liability Company in 2023 On March 29, 2023, ACWA Power Dzhankeldy Wind Limited Liability Company (or FE ACWA Power Dzhankeldy Wind LLC) — a special purpose vehicle and wholly-owned subsidiary of ACWA Power that is legally incorporated in Uzbekistan — signed a $430 million syndicated debt financing package (including A and B loans) with the Asian Development Bank (ADB), Bank of China (BOC), Industrial and Commercial Bank of China (ICBC), the European Bank for Reconstruction and Development (EBRD), Standard Charted Bank, the OPEC Fund for International Development Bank, Deutsche Investitions- und Entwicklungsgesellschaft mbH (DEG), and PROPARCO for the 500MW Dzhankeldy Wind Farm, 33-500kV Substation, 500kV Dzhankeldy-Bash and Dzhankeldy Western Plot-Eastern Plot Substations OHTL IPP Project.

BOC contributed an estimated $68.25 million to the syndicate, while ICBC contributed an estimated $89.67 million to the syndicate. The borrower purchased credit insurance from the Multilateral Investment Guarantee Agency (MIGA).

The total cost of the independent power project (IPP) was $658 million and it is being financed according to a debt-to-equity ratio of 65:35. The purpose of the project is to construct the 500MW Dzhankeldy wind farm in the Peshku district of Bukhara region.

The wind farm is expected to consist of 79 wind turbine generators (WTGs), each with a capacity of 6.5 MW, a rotor diameter of 171 meters, and a hub height of 100 meters.

The project scope also includes construction of a 128.5 km 500 kV overhead transmission line to connect the Dzhankeldy wind farm to Bash wind farm, the construction of a 120 km 500 kV single-circuit overhead transmission line for the Dzhankeldy wind farm’s connection to the grid at Sarimay substation, and the construction of common electrical facilities shared with Bash wind farm (switchyard with transformers, 500/220 kV pooling station).

Once the wind farm is operational, it is expected to generate at least 1,577 GW-hours of electricity per annum and help avoid at least 879,907 tons of carbon dioxide equivalent per annum.

ACWA Power has already entered into a 25-year, USD-indexed, Power Purchase Agreement (PPA) with National Electric Grid of Uzbekistan (NEGU). NEGU is expected to be the sole off-taker of the power generated by Dzhankeldy Wind Farm.

The project site is located on two plots of land as follows: (1) the south eastern part of the Kyzyllum desert on the territory of the Kuldzhuktau mountain range, Peshku district of the Bukhara region; and (2) the western plot of the wind farm is located approximately 2.5km east of Dzhankeldy village and directly adjacent to the Kalaata village.

The eastern plot of the wind farm islocated approximately 1.4km west of Dzhankeldy, 27km west of Ayakguzhumdy and approximately 92km west of Bukhara town. Both the western & eastern plot are approximately 47km north of Highway A380.

The wind turbines will be sited within the allocated land where the wind resource is most reliable but the project siting has also taken account of environmental and social issues to ensure that impacts are prevented, minimized or mitigated in accordance with Uzbekistan laws and environmental standards and the E&S policies and safeguards of the international banks funding the project.

The Engineering Procurement and Construction (EPC) contract for the project was awarded to China Energy International Group (CEEC), while First National Operation and Maintenance was selected as the operations and maintenance (O&M) company.

In June 2023, renewable energy company Envision Energy announced that it would supply the turbines for the wind project.

Capitals Environmental and Management Consulting (5 Capitals) acted as the lead E&S Consultant undertaking the independent Environmental Impact Assessment (EIA) and Environmental and Social Impact Assessment (ESIA) processes. MIGA prepared the Environmental and Social Review Summary (ESRS).

ADB categorized the project in compliance with its Safeguard Policy Statement as follows: environment (category A), involuntary resettlement (category B), and indigenous peoples (category C).

ADB also undertook due diligence and reviewed the potential environmental and social (E&S) impacts of the project and the measures to avoid, minimize, mitigate, and compensate for the adverse impacts in the safeguard reports and plans.

The E&S measures and the borrower’s institutional capacity and commitment to manage E&S impacts were deemed adequate by ADB.

The project’s groundbreaking ceremony on March 9, 2023 and it was originally scheduled to reach completion within 30.5 months (September 24, 2025).

📋 Staff Comments
  1. On July 7, 2023, ACWA Power (through its wholly owned subsidiary) entered into a Sale Purchase Agreement (“SPA”) for the sale of a 35% stake in its wholly owned subsidiaries, ACWA Power Bash Wind Project Holding Company and ACWA Power Uzbekistan Wind Project Holding Company Limited (“the Investee Companies”). The Investee Companies holds 100% stake in ACWA Power Bash Wind LLC and ACWA Power Dzhankeldy LLC (“the Project Companies”) respectively. The disposal was subject to the satisfaction of certain conditions precedent in the SPA, which were not completed as of December 31, 2023.
  2. The Chinese project title is 赞克尔迪500兆瓦风电项目.
  3. The estimated size of ICBC’s financial contribution is drawn from IJGlobal.
  4. According to BOC, it contributed $136.5 million: one for the 500MW Bash Wind Farm, 500kV Bash-Karakul Overhead Transmission Line (OHTL), and 33-500kV Substation IPP Project and another for the 500MW Dzhankeldy Wind Farm, 33-500kV Substation, 500kV Dzhankeldy-Bash and Dzhankeldy Western Plot-Eastern Plot Substations OHTL IPP Project. For the time being, AidData assumes that BOC’s contributions were equally divided across the two projects. This issue warrants further investigation.
  5. There is some evidence of an additional RMB 2.5 billion bridge loan from China Energy Engineering Corporation Limited to China Energy International Group Co., Ltd. (中能建國際建設集團有限公司) in 2023 for the 500MW Bash Wind Farm, 500kV Bash-Karakul Overhead Transmission Line (OHTL), and 33-500kV Substation IPP Project as well as the 500MW Dzhankeldy Wind Farm, 33-500kV Substation, 500kV Dzhankeldy-Bash and Dzhankeldy Western Plot-Eastern Plot Substations OHTL IPP Project (see https://www1.hkexnews.hk/listedco/listconews/sehk/2023/0310/2023031000422.pdf and https://www.seetao.com/details/206506.html). This issue warrants further investigation.
  6. ACWA is majority owned by some of the leading Saudi and regional conglomerates, including institutional investors with strong energy industry backgrounds. Its shareholders provide ACWA with credibility, access to key market stakeholders, and strategic direction through representation on ACWA’s board. With a 44% ownership interest, Kingdom of Saudi Arabia’s sovereign wealth fund, the Public Investment Fund (PIF), is the largest shareholder in ACWA.
📚 Sources & References
  • IJGlobal - Dzhankeldy Wind Farm (500MW)
  • Substatiom (33-500kV)
  • Dzhankeldy-Bash (500kV) and Dzhankeldy Western Plot-Eastern Plot Substations (500kV) OHTL PDF
  • EBRD Mobilisation Partner of Choice
  • February 2024
  • ACWA Dzhankeldy 500 MW Wind Power Plant
  • DEG Infrastructure & Energy 2024
  • Dzhankeldy 500MW Wind Farm Republic of Uzbekistan Resettlement Action Plan
  • Consolidated Financial Statements and Independent Auditor’s Report 31 December 2023
  • Dzhankeldy Wind Farm Project Project Description
  • Dzhankeldy 500MW Wind Farm Republic of Uzbekistan
  • OPEC Fund contributes US$40 million financing to two wind farms in Uzbekistan
  • DZHANKELDY WIND IPP
  • Uzbekistan renewables: The great Tashkent DFI cash dash
  • Uzbekistan Dzhankeldy WPP
  • The rapport spectrum
  • 中国银行十三项成果纳入第三届“一带一路”国际合作高峰论坛成果清单, 1GW Uzbekistan projects receives US$520m in financing
  • EBRD Supports 1GW of Renewable Energy Generation in Uzbekistan.
  • 中企海外项目双周报(2023.3.4-2023.3.17)
  • 坚定不移走中国特色金融发展之路|金融支持“一带一路” 中国银行高质量服务对外开放
  • 中亚最大风电项目崛起戈壁深处 总投资近9亿美元 中行上海市分行筹组银团发挥关键作用 高质量金融服务获点赞
  • ISSUANCE OF A SHARES TO SPECIFIC SUBSCRIBERS AND RELATED MATTERS NOTICE OF THE FIRST EXTRAORDINARY GENERAL MEETING OF 2023 AND NOTICE OF THE FIRST H SHAREHOLDERS’ CLASS MEETING OF 2023
  • Energy China started construction of two new energy projects in Uzbekistan
  • Uzbekistan : Dzhankeldy Wind Power Project
  • Dzhankeldy wind farm
  • ACWA Power starts commercial ops at Uzbekistan's 2 wind power plants
  • List of Practical Cooperation Deliverables of the Third Belt and Road Forum for International Cooperation Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

ACWA Power Dzhankeldy Wind Limited Liability Company

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant