Active HORIZON European Commission

Blue Bunkering of Anchored ships with Renewable Generated Electricity

€11.33M EUR

Funder European Commission
Recipient Organization American Mpiro of Siping Hellenic Monoprosopi Etaireia Periorismenis Evthinis
Country Greece
Start Date Jan 01, 2024
End Date Dec 31, 2026
Duration 1,095 days
Number of Grantees 15
Roles Participant; Coordinator; Third Party
Data Source European Commission
Grant ID 101138694
Grant Description

The shipping industry is responsible for around 3% of global greenhouse gas emissions, and this is expected to increase as global trade and shipping activity continues to grow. As such, reducing emissions from shipping is an important part of global efforts to tackle climate change.

In recent years, policies and legislation, mainly focusing on environmental sustainability, have pushed international shipping toward the process of its decarbonization.

Regulatory bodies are pressing on the maritime world by adopting ambitious targets and by introducing a number of initiatives that will facilitate the transition to a sustainable future, including the International Maritime Organization's strategy to reduce greenhouse gas emissions from shipping, which aims to halve emissions from the sector by 2050 compared to 2008 levels.To this end, BlueBARGE will design, develop and demonstrate an optimum power-barge solution to mainly support offshore power supply to moored and anchored vessels, limiting local polluting emissions and global GHG footprint in a life cycle perspective, following a modular, scalable, adaptable and flexible design approach which will facilitate its commercialisation by 2030.

The proposed power-barge solution will consider different alternatives as containerised power supply modules in a variety of configurations, where battery modules will serve as basis due to their high energy efficiency and readiness level, and other considered modules including hydrogen fuel cells and hydrogen generators.

The project will address electrical integration issues, interfacing challenges of the barge with ships, ports and local grid, operational safety and regulatory compliance aspects, delivering a high-readiness and complete “power bunkering” solution.

Overall, the BlueBARGE project’s full integrated system aims at contributing to the shift of the maritime industry towards the goals of electrification and decarbonisation at an EU and international level.

All Grantees

Corvus Energy As; Regbes B.V.; American Mpiro of Siping Hellenic Monoprosopi Etaireia Periorismenis Evthinis; Multimarine Services Limited; Ethnicon Metsovion Polytechnion; Danaos Shipping Company Limited; Columbia Shipmanagement Ltd; Magellan Circle - European Affairs Consultancy, Lda; Fundacion de la Comunidad Valenciana Para la Investigacion, Promocion Y Estudios Comerciales de Valenciaport; Enerox Gmbh; Hydrus Anotati Synektiki Michaniki Etaireia Symvoulon Anonymi Etaireia; Norges Teknisk-Naturvitenskapelige Universitet Ntnu; Aalborg Universitet; Elkon Elektrik Sanayi Ve Ticaret Anonim Sirketi; Magellan Circle Italy Srl

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant