Loading…
Loading grant details…
| Funder | European Commission |
|---|---|
| Recipient Organization | Katholieke Universiteit Leuven |
| Country | Belgium |
| Start Date | Jan 01, 2024 |
| End Date | Dec 31, 2027 |
| Duration | 1,460 days |
| Number of Grantees | 13 |
| Roles | Participant; Associated Partner; Coordinator |
| Data Source | European Commission |
| Grant ID | 101137552 |
The EC’s Critical Raw Materials (CRM) Act sets multiple benchmarks for reducing Europe’s dependency on a few unlike-minded third countries for strategic/critical raw materials.
Through the domestic extraction of two CRMs – “vanadium” (V) and “titanium metal” (Ti metal) – AVANTIS addresses the first target of the Act (> 10% domestic extraction, for V & Ti).
AVANTIS’ rationale lies in the fact that Europe has a multitude of unexploited, low-grade V-bearing titanomagnetite deposits in Finland, Sweden, Greenland, Norway, Poland, Ukraine… However, these deposits have a complex “spiderweb-like” mineral assemblage.
Without selective blasting, selective fragmentation and pre-concentration technologies to separate the Ti-rich ilmenite grains from the V-bearing magnetite, it is uneconomic to exploit these deposits.
Supported by a bespoke forensic geometallurgy approach, AVANTIS develops a novel selective blasting approach that allows for rock excavation in view of increased mineral liberation at the blasting stage, and reduced energy demand in the crushing & grinding stages.
Likewise, AVANTIS designs tailored, water-free and water-lean pre-concentration technologies that allow to produce two distinct pre-concentrates ((1) ilmenite-rich, Ti-pre-concentrate and (2) ilmenite-free, V-pre-concentrate). The water-lean method is also tailored to process V/Ti-bearing mining wastes from historical/on-going operations.
The resulting flowsheets have a low net water consumption (> 70% water recycling) and reduced GHG intensity of extraction (reduction of 60–700 g CO2,eq per t ore hauled to the crushing plant).
A preliminary analysis of the potential European reserves that are unlocked, yields a total of 154 Mt Ti & 3.5 Mt V (still excluding Ukraine), to be compared with current levels of EU consumption (1.5 Mt/y Ti; 12.7 kt/y V).
AVANTIS strengthens the “responsible mining in Europe”-paradigm, increasing society’s trust in domestic CRM production.
Geologian Tutkimuskeskus; Akademia Gorniczo-Hutnicza Im. Stanislawa Staszica W Krakowie; Oulun Yliopisto; Australian Titanium Pty Ltd; Polytechneio Kritis; Otanmäki Mine Oy; Proxis Sp Zoo; Titania As; Katholieke Universiteit Leuven; Ima Engineering Ltd Oy; Strategic Explorations Oy; Norges Teknisk-Naturvitenskapelige Universitet Ntnu; Universidad Politecnica de Madrid
Complete our application form to express your interest and we'll guide you through the process.
Apply for This Grant