| Funder | Horizon Europe Guarantee |
|---|---|
| Recipient Organization | Orbital Marine Power Limited |
| Country | United Kingdom |
| Start Date | Dec 01, 2023 |
| End Date | Nov 30, 2029 |
| Duration | 2,191 days |
| Data Source | UKRI Gateway to Research |
| Grant ID | 10099366 |
There is 10GW of predictable, high-value tidal stream energy potential in European waters, with up to 100 GW of capacity globally . This is an almost entirely unharnessed clean energy resource, with just 13 MW currently deployed . Transitioning European market leading technologiesfrom single deployments, up to farm scale, isthe next milestone in harnessing this clean, predictable,secure, domestic energy resource.
EURO-TIDES has been developed specifically to address the call topic by delivering a 9.6MW farm of four 2.4MW Orbital tidal energy devices of the same series. The farm will operate in full operational conditions for 15-years, deploying in 2027. The EURO TIDES consortium will work collaboratively to deliver six ambitious objectives and drive the sector forwards: 1.
De-risking tidal energy technology development by delivering a 9.6MW pilot farm and three pilot farm system innovations; reducing Levelised Cost of Energy (LCOE) of Orbital’s floating tidal technology from €120/MWh to <€100/MWh. 2. Increase bankability and insurability by providing
17,520 hours of operational data, displaying the production of 50GWh+, and verification of key technology metrics to internationally
recognised methodologies: reducing cost of capital from 10%-12% to 5%-6%. 3. Increase availability of tidal stream by creating an
efficient robust, replicable, and reliable operations and maintenance programme: increasing availability to 95%+. 4. Improve market
confidence by developing industrial design and manufacturing processes: increasing supply chain capacity from one device per annum
to 80 devices per annum. 5. Increase knowledge of environmental impacts to ensure appropriate environmental protection and mitigation
is in place: enabling safe scalability to a 100GW+ global market. 6. Making performance, reliability and behavior data collected from
the demonstration publicly available: accelerating scalability, commercialisation, and deployment of a 2GW+ project pipeline.