Chinese Government provides RMB 100 million interest-free loan for Gotera Interchange Construction Project On October 6, 2005, the Chinese Government and the Government of Ethiopia signed an RMB 100 million interest-free loan agreement for the Gotera Interchange Construction Project.
According to the Government of Ethiopia’s Aid Management Platform (AMP), the ETB 113,905,321 loan achieved a 14% disbursement rate, with only one disbursement (worth ETB 15,780,856) being made on September 30, 2009.
The purpose of this project was to construct the Gotera interchange (overpass), which is 8,281 meters long, as well as an approach bridge. The Gotera interchange (overpass) was the first interchange to be constructed along Addis Ababa Ring Road. The project was designed by China Hydropower Consulting Group East China Survey and Design Institute.
Construction was carried out by the Shanghai Construction Engineering Group Corporation. Construction was overseen by Guangzhou Wanan Construction Supervision Co., Ltd. The groundbreaking ceremony was held on December 18, 2006. Construction began on June 28, 2007, and was completed on May 31, 2009.